WORK EXPERIENCE:
A] Honeywell PLC, DCS, SCADA System –
1. Training on C200 - Honeywell DCS Controller.
2. Training and Experience on Honeywell SCADA & interface System-EPKS System. HMI Graphics Development.
3. Experience on EPKS Configuration Studio – Adding the servers, Configuring trend and Group Displays, Adding the assets, configuring alarms, reports and events, adding operators and assigning security levels, History assignment, file replication
4. Experience on EPKS Quick Builder – EPKS Station Building, EPKS Channel Building (Modbus, GE Fanuc Channels etc.), EPKS Controller Building (Modbus, GE Fanuc etc.), SCADA Point Building (Status, Analog Points), Bulk Building
5. Experience on EPKS HMIWeb Builder - HMI Static and Dynamic Graphics development, Point Linking, Popup development, VB Scripting for Dynamic Shapes, Dynamic Linking and Testing / Optimizing using set collections
6. SCADA Pre-Commissioning and Commissioning activities
7. Third party interface such as PLC, Density meter using EPKS.
8. Experience on Honeywell ML 100R PLC
B] GE Fanuc PLC –
1. Hands-on experience on GE-Fanuc 90-30 PLC - Hardware, Software
2. Experience on Ladder Logic development using GE Fanuc Proficy Machine Edition Software
3. Third Party interface - Limitorque MOV's using GE Fanuc Co-processor module and PLC
4. Design System Architecture, Prepare BOM For factory ordering, Selection of required GE Fanuc Processor family with correct memory size, Specification etc.
5. Cabinet Design (System Cabinet, Marshalling Cabinet, Relay Cabinet, etc), I/O Placement (I/O Assignment) and Hardware building, PLC Addressing System.
6. PLC communication module PCM configuration for third-party interface, Software enabled Redundancy logic configuration, Heat Load calculations, Power Distribution, Loop Wiring.
7. Understanding of Earthing and Grounding requirements for GE Fanuc PLC Series, Developing and using Project specific JIDS, Checklists, Guideline Documents for GE Fanuc PLC.
8. Power on GE Fanuc PLC / Commissioning
C] Communication Protocols –
1. Communication Protocols - Modbus, TCP/IP Ethernet, HART(4-20 mA), Physical Layers - RS485, RS422, RS232, Communication of various Field Devices using Terminal Server Configuration
2. Network design and configuration - IP Address Assignment for each node in System with HOST File, Network Printer Configuration.
D] Design Engineering –
1. Site Survey and preparation of site reports.
2. Prepare Instrument hook up Diagrams using P and IDs and Instruments types.
3. System Architecture Design, Cabinet Design (System Cabinet, Marshalling Cabinet, Relay Cabinet, etc).
4. HDM and Hook-up Drawing preparation, I/O Assignment and I/O Count, System, Factory and PLC BOM preparation Details
5. UPS Load Calculation and selection, Development of MEDB for Cable Schedule and JB Schedule
6. Instrument Datasheet preparation of field instruments such as PT, TT, Density meters, Level switch, Pressure switch, Radar Gauge, Pressure gauge, DCV, MOV, Pressure control valves, Additive Injection system etc.
7. Preparation of erection hardware BOM, Understanding and selection of Fiber Optic Cable BOM with accessories
8. Cable engineering - Datasheet Preparation for different types of cables, different types of Junction Box, different types of cable Trays, Preparation of Cable / Tray Routing Diagrams, Sizing of JB (Size, No. of cable entry,No.of TB's, Enclosure type), Preparation of Cable Schedule, JB Schedule, Preparation of Termination / Ferrule Details
E] Field Engineering –
1. Third Party interface Experience - Density Meters (E & H, Micromotion), MOV's.
2. Third Party interface - Limitorque MOV's using GE Fanuc Co-processor module and PLC.
3. Installation, Calibration, Loop testing and troubleshooting of instruments.
4. Technical Specifications of third party equipments interfaced like Batch Controllers, SDM, CIU, VDU with LRC used in TA from different manufacturers.
5. Installation & commissioning of Additive Injection System
F] Installation Experience –
1. Development of Hook-up Diagrams required for installation of various field instruments and installation of instruments as per the Hook-up diagrams.
2. Installation experience of various field instruments such as - MOV's and Actuators, Bulk Air Eliminator, Density Meters, TRV's, Pressure Gauges, Pressure Transmitters, RTD's, Radar Gauges, Float and Tape level Transmitters, DCV's, Level Switch, Pressure Switch, Pressure Guage
Honeywell Pune
EDUCATION & CERTIFICATION:
1. Two and Half Years of experience with Honeywell Automation India Ltd. in Oil and Gas Downstream field.
2. Working as a Project Engineer with Honeywell Automation India Limited, Pune
3. Six Sigma Green Belt Training and project ''TA System Engg. And I & C work Standardization'" is completed and certified.
4. Project worked on – HPCL Wadala Terminal Automation, BPCL Uran LPG Terminal Automation, HPCL 10 Terminal Automation