CONTACT INFORMATION:
View contact information...
Date of Birth: 29-01-1960
Educational Qualification: H.S.C.
Technical Qualification: Mechanic (Engineering) INS SHIVAJI, Lonavala.
Experience: Total 18 years
Sr. No. Company's Name Designation and Period
Job Description
1) TECNICAS REUNIDAS Madrid & Italy
Rotating Equip.Supr. 20-05-08 to 21-06-08. NUOVO PIGNONE TEST FACILITY MASSA(ITALY)
Preparation and to witness string test for Compressor BCL-605/N.
TECNICAS REUNIDAS OMAN
01-07-08 to till date CLIENT; PETROLEUM DEVLOPMENT OF OMAN
SAIH RAWL DEPLETION COMPRESSOR PROJECT
Assembly, erecting and installation of Compressors, Fin Fan coolers, Suction Scrubbers, Mineral oil pump skid and coolers, water pump and coolers etc.
2) SBM OFFSHORE
DUBAI: FPSO-FRADE Sr. Mech. Technician
09.09,'07 to March'08.
CLIENT - CHEVRON ( FPSO-FRADE ) TOP SIDE
INSTALLATION, COMMISSIONING AND START UP OF GE-NUOVO PIGNONE LM 2500 – TF 39.
Installation of Main skid on Gimbles, assembly of Inlet duct, Combustion duct and Exhaust duct, Filter house, mineral oil and synthetic oil coolers skids, liquid fuel console, fire suppression skid, synthetic and mineral oil mist eliminator, rundown tank, waste heat recovery unit, fuel gas treatment skid, gas treatment skid and deluge skid, overhead enclosure lifting hook, beam and 'A' frame on two modules for four engines.
3) KENTZ CASPAIN
AZERBAIJAN
PCWU PLATFORM
Mech. Tech. 28.01.07
to
29.07.07 CLIENT: – BP – AOIC ( PCWU PLATFORM)
Alignment, Commissioning and start up of Rolls- Royce RT – 62 GG mineral oil pump, synthetic oil pump, gas and liquid fuel skid, water injection pump, MOL pump, cooling medium circulation pump, Flash gas and export gas compressor, Booster pump, Methanol and Glycol pump package, sea water lift pump etc.
4) EURO MACHANICAL
ABU DHABI CLIENT – DUBAI PETROLEUM COMPANY
CM, OM, PM & Overall of Reciprocating/Centrifugal pumps, metering pump, screw pump & vertical turbine pump. Reciprocating & Centrifugal Gas compressors and screw compressor. Fin fan Blowers (Radial & Axial). Gas Turbines: GE Frame-3, Rolls Royce AVON, Cooper Power Turbine, Solar Saturn and Centaur (Gas Fuelled & dual Fuel), Diesel Engines & Fire pumps.
a) Dubai Petroleum Co. S.W. & Fateh Oil Field (Offshore) Mech. Tech.
14.02.05 to 27.12.05
b) GASCO-BUHASA Mech Tech.
15.01.05 to 10.02.05
25.02.06 to
15.05.06 CLIENT – ROLLS / COOPER / ELLIOTT
Change over of Rolls-Royce Gas Engine and replacement of Seal and bearing of compressor (76-5B4 & Elliott)
CM, OM & PM of Reciprocating / Centrifugal pumps, compressors, Fin fan & Blowers, Gas Turbines, Stripper
Re-boiler, Liquid drier and Methane Stripper feed pump.
c)
d)
e)
f)
g)
h)
I)
j)
k)
l)
m) GASOCO HABSAN
MUBARAS ISLAND
Offshore
ZIRKU ISLAND
Offshore
DUGAS
DUBAI PETROLEUM CO.
Offshore
GASCO HABSAN
RUWAIS FERTILIZER
AL WASIT POWER
PLANT, SHARJAH
GASCO BUHASA
ADGAS (DAS ISLAND) Offshore
RUWAIS REFINERIES Mech Tech.
03.10.04 to
30.10.04
Mech. Tech.
18.05.04 to
14.06.04
Mech. Tech.
25.01.04 to
15.03.04
Mech. Tech.
04.01.04 to
09.01.04
Mech. Tech.
11.11.03 to
23.12.03
Mech. Tech.
05.09.03 to
16.10.03
Mech. Tech.
07.10.01 to
29.10.01
Mech. Tech.
31.05.01 to
29.06.01
Mech. Tech.
21.05.01 to
29.06.01
Mech. Tech.
08.04.01 to
20.05.01
Mech. Tech.
24.04.99 to
15.05.99 CLIENT - NUOVO PIGNONE
Semi major and hot gas path of GE frame - 5 (twin shaft) and major overhaul of gas turbine GE frame - 5 (twin shaft)
Maker: NUVO PIGNONE
CLIENT - MJB
Semi major and hot gas path of gas turbine frame - 5
Maker: HITACHI (GE)
CLIENT - ZEDCO (MJB)
Major overhaul of gas turbine frame – 6, including bull gear and auxiliaries' gearbox.
Maker: GE
CLIENT - WELLUBE
Hydratighting and bolt tensioning of static equipment
CLIENT - KELLOGS BROWN & ROOT
Major overhaul of gas turbine frame - 3 & RT 56 power turbine Repairs and maintenance of horizontal pumps, diesel engine and rotating equipment installed on platform.
Maker: GE FRAME 3 & RT 56 ROLLS ROYCE
CLIENT - MJB
Major overhaul of gas turbine frame - 5 (twin shaft)
Maker: NUOVO PIGNONE
CLIENT - WOODGROUP
Repairs, Overhaul and pressure testing of safety vv, relief vv, globe vv, gate vv, control vv, butterfly vv, plug vv & NRV.
EMC PROJECT
Installation & alignment of gas turbine frame - 9.
Maker: ALSTORM.
CLIENT - GASCO
Servicing and Overhaul of compressor, fin fan coolers, horizontal and vertical pumps and gas engines.
CLIENT - ADMA
Bolt tensioning and hydratighting of H2S pipe lines, static equipment i.e. coolers, condensers, various type of valves and columns, etc.
CLIENT - WOODGROUP
Repairs, Overhaul and pressure testing of safety vv, relief vv, globe vv, gate vv, control vv, butterfly vv, plug vv & NRV.
5) GRANDI LAVORI FINCOSIT, DOHA - QATAR
Barges: Luca & Caromandal Marine Mech.
08.06.02 to
05.06.03 Maintenance and repairs of Deck machineries, Diesel engines, Cranes, equipment fitted on towers & winches etc.
6) K.S.R.C., KUWAIT
Ship Repairs - Barges and Oil filed services. Underwater Marine Fitter
03.06.99 to
15.07.00 Overhaul maintenance and repairs of propeller (C.PP. fitted and Z type) and shaft, Rudders, Engines, vertical and horizontal pumps, various types of valves, compressors, Deck machineries. Overhaul repairs and testing of rotating and static equipment and machineries in supply to refineries (K.O.C.)
7) GOLTENS, DUBAI
Ship Repairs - Barges & Power Plant Services Mechanic
09.05.94 to
03.10.98
22.06.89 to
10.08.90 Repairs, overhaul and maintenance of Diesel Engine two stroke in line i.e. BNW, MND, STORK, MISTUBISHI etc. Four stroke in line and v - shape from 3 to 16 cycle. Maker: Volvo Penta, Caterpillars, Scam, Detroit, Wartsila, etc. BOILERS (in supply to AL-BORG) repairs and installation of Boiler mountings, headers, fire tubes, burners, economizers, etc. Repairs of propellers and shaft (C.PP. fixed and Z-type). Deck machineries i.e. windless, anchor chain, anchor, winches, cranes, hatch covers, heat exchangers, coolers, turbo chargers (two stroke engines) horizontal and vertical pumps, cargo pumps, various valves (safety vv, relief vv, globe vv, gate vv, butterfly vv) compressor and turbines.
8) SAUDI OGER LTD.
SAUDI ARABI Mech. Main Power Plant
23.12.91 to
22.12.92 Maintenance, repairs, operation and synchronizing of Diesel Engine and Generators
Maker: SCAM.
SAFETY TRAINING COURSES a) H2S / Breathing apparatus 1. Task Risk Assessment b) Helicopter Underwater training escapes 2. R.T.C. – 2
c) Personal Survival Techniques 3. Manual handling d) Elementary First Aid 4. Performing Authority e) Personal Safety and Social Responsibilities 5. Working at height f) Fire Prevention and Fire Fighting
PREVENTIVE AND CORRECTIVE MAINTENANCE, OVERHAULING HAS DONE IN THE FOLLOWING EQUIPMENTS.
1. CENTRIFUGAL PUMP (SINGLE STAGE, HORIZANTAL)
MAKE: UNION, KSB, GOULDS, EBARA
Carried out six monthly Pm such as pump case bearing oil draining flushing and refilling, coupling alignment checking and correction, Mech-seal leak checking, and flushing with corrobil, rinsing of seal flush line, bolt tightness checking, pump and motor bearing temp taken after run test.
Complete overhauling to dismantle the internals, checking shaft trueness, shaft sleeve, wearing, bearing, lip seal, and assemble with new parts, mechanical seal installing, setting and commissioning the unit.
2. MULTISTAGE CENTRIFUGAL PUMP (HORIZANTAL, BARREL AND SPLIT CASE) MAKE: KSB, SULZER BINGHAM SERVICE: CRUDE OIL, BFW.
Six monthly maintenance such as bearing oil flushing and refilling, flushing of mechanical seal with corrobil, coupling alignment checking and correcting within the specified tolerance, and other corrective maintenance like replacement of thrust bearing and tandem seal.
Overhauling complete pump such as rotor removal, impeller, wearing checking and replacing, thrust bearing fixing, rotor centering, tandem seal fixing and aligning with engine.
3. VERTICAL TURBINE PUMP:
MAKE: WORTHINGTON, PEERLESS, PEABODY
SERVICE: SEA WATER LIFTING:
Complete overhauling to remove the bowl assembly from its position, dismantling the bowl, checking rotor shaft bent, replacing impeller and case wear rings, "O" ring and assembling the bowl. Checking intermediate shaft straightness, water lubricated rubber bearings, spiders, replacement of parts if necessary. Erecting bowl assembly with raiser pipe, intermediate shaft, muff coupling. After pedestal bolting, placing the thrust bearing, centering of rotor, coupled with motor and finally commissioning the unit.
4. ELECTRICAL SUBMERSIBLE PUMP (ESP)
MAKE: WORTHINGTONSERVICE: SEA WATER LIFTING
Complete overhauling job such as removing the rotary unit bowl assembly, dismantling and checking the parts condition like bearing clearance, wearing clearance, replacing parts and making clearance as per manual and fixing the unit in position and commissioning.
5. RECIPROCATING PUMP (TRIPLEX, QUANTAFLEX)
MAKE: URACA, PERUNI, CASO, NIKKISO
SERVICE: NH3, CRUDE OIL, GYCOL.
Preventive and corrective maintenance like crankcase oil draining and refilling, coupling alignment checking and correction, checking main and big end bearing clearance, replace if necessary, plunger changing, renewal of packing, suction and discharge valves replacement and other jobs in lube oil circuit.
6. METERING PUMP:
MAKE: MAC FARLAND, PULSA FEEDER, TEXTEAM, STONEBOR
SERVICE: CHEMICAL INJECTION, DEMULSIFIER.
Complete overhauling of pumps in liquid side, plunger-packing replacement, suction and discharge valves cleaning and fixing, crank side oil draining and refilling, commissioning the unit.
7 MECHANICAL SEALS:
MAKE JOHNCRANE, DURAMETTALIC, AND SEALOL.
Removing and installing various types of mech seals like single coil pusher type, multi coil spring pusher type, metal bellow seals and double tandem seal.
8. ALIGNMENT:
Rotating Equipment alignment has done in the following methods.
(i) RIM AND FACE METHOD: If drive and driven shafts have nil float.
(ii) REVERSE DIAL GRAPHICAL METHOD: - If drive and driven shafts have float either or both.
9. CENTRIFUGAL GAS COMPRESSOR: (BARREL, SPLIT CASE)
MAKE DRESSER CLARK, COOPER BESSEMER, ELLIOTT.
SERVICE: SYN GAS, CO2, MAKE UP GAS.
Rotor bundle removal and repair such as opening diagram, Replacing labyrinth and making clearance, assembling and prefixing in the barrel, installing tilting pad journal bearing and thrust disc, rotor centering, axial float checking and correction, inboard and outboard seals (LIQUID FILM SEALS) changing and aligning by reverse dial method. Other jobs in seal oil and Lube Oil system.
10. SCREW COMPRESSOR (INSTRUMENT AIR)
MAKE: INGERSOLL RAND, GARDNER DENVER.
Quarterly and Six monthly PM Jobs such as lube oil filling in the receiver, air filter replacement, Coupling condition, bolt tightness checking, cleaning of radiator tube fins (Lube Oil, Air outlet) and other jobs in the instrument air package unit. Pre filter and after filter checking and changing, desiccant changing in the unit and exhaust muffler cleaning and fixing.
11. FANS AND BLOWERS: (Radial and Axial)
Performed Preventive and corrective maintenance like. Bearing clearance checking, adapter sleeve tightness checking, bearing to Plummer block clearance checking and correction, coupling alignment checking and correction and corrective maintenance like taper sleeve mounted bearing replacement.
12. TURBINES AND ENGINES:
MAKE Rolls Royce Avon (1535) 20 MW
Performed PPM such as crank soak wash, fuel gas nozzles, removing for assisting bore scope, P2 Filter, bleed valves O ring, lube oil and hydraulic filters removal and corrective maintenance job like function test of bleed valves and replacement of bleed valves and other jobs in lube and hydraulic system. Major Job replacement also done as per baroscopic recommendation. Aligning and swapping of nozzles of fuel nozzles for correcting EGT spread. Performed a lead role in major jobs such as "ENGINE REPLACEMENT"
COOPER POWER TURBINE RT 56, DRESSER DJ 160
Experienced in removing and fixing turbine rotor, installing journal and thrust bearings, checking and adjusting end float, checking rotor tip clearance and commissioning the unit
SOLAR SATURN T 1201, CENTAUR GS 4000, 4700- 3.3 MW
(Gas fuelled, dual fuel)
Carried out PPM jobs such as crank soak wash, air intake filters, fuel gas filters, pilot gas filters, lube and hydraulic oil filters replacement, torch manifold, bleed valve, fuel nozzles, removal for bore scope and trouble shooting for the cause of ignition failure, valve sequence failure, fail to start, fail to cranks and rectifying the above malfunctions. Performed corrective maintenance jobs in fuel gas system, servo system, bleeding air system and starting system. Performed lead in major jobs such as "ENGINE REPLACEMENT"
GE NUOVO PIGNONE - GAS TURBINE FRAME 3-5-6-9
Carried out PPM jobs such as fuel nozzles removing for baroscopic, filters replacement in lube oil, hydraulic oil and starting system. Crank soak wash and other corrective maintenance jobs like SRV, GCV replacement, bleed valve, swapping of fuel nozzles, acid washing of lube oil coolers, igniter's replacement. Major overhaul & changeover of gas turbines.
13. DIESEL ENGINE:
Weekly, hourly, top-semi major & major overall of Diesel Engine.
14. GEAR BOX
MAKE: ELECON, PHILADEPHIA, LUFKIN
Complete Overhauling such as gears and bearings replacement lip seal changing, checking backlash and root gap and refilling of Lube oil.
15. BOLT TENSIONING AND HYDRATIGHT
HL-Series bolt tensioner – Ram stroke 13 mm max. Bolt stress 432 n/mn2 (28 tones) No. 805 – 375 N/mn2 (24 tons) No.10 – 342 n/mn2 (22 tons) Max working load 1000 bar.
Sea serpent bolt tensioner – Ram stroke 20-mm. max. Tool operating pressure 1035 bar.
HT-F bolt tensioner - 8-mm. max working load 1170 bar.
Torque wrench – max. Operating pressure 690 bar. Type SDR (Square drive ratchet) DFR (Direct fit ratchet) Tool designed for minimum 12 mm onward.