STUDY: Msc in Oil Processing Technology and Petrochemistry, University of Ploiesti, Faculty of Oil Technology and Petrochemistry, 1988-1994
Main courses: Distillation Columns, Separation Processes, Thermo Catalytic Processes, Heat Transfer Processes, Reactors in Oil and Gas Industry, Oil Physics and Chemistry, Heaters in Oil and Gas Industry, Mechanical Equipments in Oil Industry.
CURRENT POSITION: Process Commissioning/Start-up Engineer Specialist-Escravos, Nigeria
LANGUAGES: English-fluent, French-fluent, Spanish-fluent, Romanian-native
ABILITIES: Computers skills-Microsoft Office (Word, Excel, PowerPoint, VISIO), Adobe Acrobat and Reader, Internet Explorer.
Data Base: PATHMAKER, STARS, PROARC, DOCUMENTUM.
Permit to Work System (General Work, Hot Work, Confined Space Entry, Excavation), Risk Assessment, Job Safety Analyze.
DCS: Yokogawa Centum 3000, Emerson, Honeywell PKS.
COURSES: Process Simulator of Centum CS3000-Amec Spie Oil & Gas Servicies/ IPEDEX-2004, Process Simulator Honeywell PKS (Process Knowledge System).
SUMMARY: I have 22 years extensive experience in Process leading position on Oil and Gas Industry, Refinery and Petrochemical, with major companies: Chevron, BP, Technip, JGC (Japan Gas Comp.), HHI (Hyundai Heavy Industries), filling various positions like Process Commissioning/Start-up Engineer Specialist, Process Operations Consultant (Team Leader), Commissioning Engineer, Area Superintendent, Process Engineer, Shift Supervisor, DCS Operator. The past years involved in pre-commissioning, commissioning, start-up, and continuous operation of the following units: Gas Plant, Oil and Gas Separation and Reinjection, Syngas, Water Treatment Units, C5/C6 Isomerisation, Naphtha Catalytic Reformer, Naphtha HDS, Diesel HDS and Kerosene HDS.
CAREER HISTORY
2008, September-to present
PROCESS COMMISSIONING/ START-UP ENGINEER SPECIALIST
HYUNDAI HEAVY INDUSTRIES/CHEVRON-ESCRAVOS, NIGERIA
Increase the total capacity of the Escravos Gas Plant from 318000 Nm3/hr to 759000 Nm3/hr by installing a new gas and liquids processing train (Train 2) and upgrading the existing Train 1 facilities.
Type of Plant: GAS PLANT Facilities: Slugcatcher, MP Separator, Dehydration Units (TEG Dehydration and Mole Sieves), Turbo expander, De-ethaniser, Debutaniser, Stabilizer Column, C5+/Condensate Degassing System, Sales Gas Compressors, GTG's, Hot Oil System. Cryogenic Process configuration is the proprietary SCORE (Single Column Overhead Recycle) process licensed by Ortloff Engineers Ltd.
Provide a high level engineering experience in the successful resolution of Gas Plant operational problems; provide continuous advice/direction to contractor and management on technical inquiries on all operational issues. Write/assist in developing procedures to conduct performance test for new plant equipment upon start-up. Assist with conducting tests, gathering data and verifying results. Implement strategies to improve Commissioning and Start-Up. Provide key interface with QA inspectors like a MC, Pre-commissioning and Commissioning, and Start-up specialist. Monitors Contractor's disciplines engineers (Process Engineers and Technicians etc) to ensure that A, B and C Check sheets are accurately completed and are submitted in a timely manner to the project database administrator to meet handover dates.
2007, June-to 2008, September
PROCESS OPERATIONS CONSULTANT (TEAM LEADER)
CHEVRON/ EXXON MOBIL/KAZ MUNAYGAZ-KAZAKH NATIONAL OIL COMPANY-TENGIZ, KAZAKHSTAN
12MMT/year oil production OIL & GAS PROCESS FACILITY
Type of Plant: Crude Separation and Stabilization, Sour Gas Compression, Gas Treating and Amine Regeneration, Gas Plant, Sulphur Recovery Unit (SRU), Tail Gas Treating, Cogen, Steam HP, MP, LP. Facilities: HP and MP Separators, Desalter, Crude Stabilization Column, Sour Gas Compressor, Dehydration Units (Mole Sieves), Turbo expander, De-ethaniser, Depropaniser, Debutaniser, Propane Dehydration Unit, Propane Refrigeration Unit, H2S Removal (Amine System-UOP Technology), Claus Heaters, Tail Gas Treatment, Sales Gas Compressor (Siemens Steam Turbine), Propane Compressor (Siemens Steam Turbine). System used in CCR-Honeywell PKS (Process Knowledge System).
Leading a group of various disciplines leads (electrical, mechanical, instrument, engineering, construction and process), in order to accomplish the scheduled tasks. Coordinate work driven by priorities agreed to by Construction Engineers and AOC, communicate these priorities with Discipline Leads for alignment checks and work planning,
Identifying critical equipment and writing or reviewing Commissioning Procedures, giving updated information to AOC (Area Operations Coordinator) for completed activities and other that may impact schedule dates by end of the day/night shift. Preplanning work for permit isolation and LOTO.
2005, July-2007, May
SHIFT SUPERVISOR
BP AMOCO/ STATOIL/ SONATRACH- IN AMENAS, ALGERIA
30 million Nm3/day natural gas
Type of Plant: GAS PLANT- LPG, Condensate and Residual Gas Facility Production. Among the facilities being handled and monitored are: Common Utilities ( Raw, Utility, Fire, Domestic and Demin Water), Process Utilities ( Plant Air, Instrument Air, N2 generator, oil heaters, flares-LP and HP, burn pit), Slug catcher, H2S and Mercury Removal, CO2 Removal (Amine System- BASF Technology), Cold Box, Condensate Stabilizer, De-ethaniser, Debutaniser, Turbo expander (Mafi Trench), Centrifugal Gas Compressors ( Nuovo Pignone ), Dehydrators, Vapor Recovery Units (Reciprocating Compressors Brotherhood), Export and Storage Facilities (Ebara Pumps), Hot Oil System (Sulzer Pumps), Fire Water Pumps (Caterpillar).
Leader of pre-comm. and commissioning team. Provide leadership to the team of field operators for maintaining smooth plant operations. Give support to the DCS operator and supervisors in doing activities in all sections of the plant. Ensure that all HSE programs and policies are being implemented on site especially PTW, Hazard Identification, Incident reporting, Safety Audits and Emergency response and rescue.
System used in CCR-Honeywell PKS (Process Knowledge System). Member of ERT (Emergency Response Team) like On Scene Commander.
2005, January-2005, June
COMMISSIONING ENGINEER
TECHNIP-SYNGAS PROJECT, NANJING, CHINA
5000Nm3/h CO, 25000 Nm3/h OXO gas, 21000 Nm3/h Hydrogen
Type of Plant: SYNGAS. The process for the production of OXO-gas and Hydrogen is based on Steam and CO2 reforming of natural gas. Consists of the following operation: desulphurization (Comox Catalyst Extrudates), pre-reforming and steam reforming, Heat Recovery, CO2 Removal-Amine System (MDEA) BASF Technology, Cryogenic Separation into H2, Raw OXO-gas and CO in COLD BOX (Air Liquid license), compression of the products and steam generation. For COLD BOX Unit, water and CO2 removal made in fixed bed absorbers-alumina and molecular sieves. Also contains a Washing Column with CH4, Stripping Column, CO/CH4 Separation Column and a Turbo expander. Compressors actuated by Steam Turbine-Ebara.
System used in CCR-Emerson.
Commissioning and Start-up activities like: blowing, flushing the lines, catalyst loading, loop-checks, test runs for rotating equipments (pumps and compressors). Successfully hand-over to the client.
2003, June-2004, December
CONTROL ROOM CONSULTANT
ORGANISATION OURHOUD, ALGERIA
300,000 B/D Crude Separation Plant
Type of Plant: CRUDE STABILISATION PLANT which consist of three trains of separation, desalination and stabilization of crude and associated gases, comprimation in five stages; water treatments: Oily Water Treatment and Albian Barremian Water Treatement; Air Compressors, Inert Gas Package, Potable Water Treatement. Gases comprimation made with compressors Nuovo Pignone and one Booster Gas Lift Compressor (a compressor in two stages actuated by a Gas Turbine).
System used in CCR-Yokogawa Centum 3000, witch consisted on DCS, Fire and Gas System, ESD and PSD Diagrams.
Transferred from JGC to Organization Ourhoud following successful handover of the project to operate the 300,000B/D Crude Separation Plant. Technical writer (SOP, EOP ). OJT (On Job Training) with Algerian board operators.
2002, July-2003, June
CONTROL ROOM SUPERVISOR
JAPAN GAS COMPANY, OURHOUD PROJECT, ALGERIA
300,000 B/D Crude Separation Plant
Type of Plant: CRUDE STABILISATION PLANT
Member of commissioning team, involved in all commissioning activities. Supervise loop-checks from ICS in cooperation with Instrument Team. Prepare Start-up and manage Start-up activities from ICS. Lead and supervise the Plant activity from ICS. On-job training with Algerian board operators. Lead all Performance Tests from ICS.
2001-2002
AREA SUPERINTENDENT
ROMANIAN OIL COMPANY, PETROBRAZI REFINERY, PLOIESTI, ROMANIA
18,000 B/D C5/C6
Type of Plant: ISOMERIZATION
2000-2001
PROCESS ENGINEER
ROMANIAN OIL COMPANY, PETROBRAZI REFINERY, PLOIESTI, ROMANIA
Type of Plant: CATALYTIC REFORMING (WHICH CONSIST IN: RCCU PROCESS 11,000 B/D, NAPHTHA, KEROSENE AND GAS OIL HYDRODESULPHURISER). Employed as part of Coordinating Team in the CATALYTIC REFORMING PLANT (included Gas Oil Hydro Treating Unit, Kero Hydro Treating Unit and Gasoline Hydro treating Unit).
1988-2000
SHIFT SUPERVISOR
ROMANIAN OIL COMPANY, PETROBRAZI REFINERY, PLOIESTI, ROMANIA
Type of Plant: 15,000 B/D GAS OIL HYDROTREATING Manage plant operations to optimize efficiency, in order to deliver the end product to the required specification. Acted as co-ordinate for emergency shutdowns. Supervised the unloading and loading of the catalyst.
1986-1988
PANEL OPERATOR
TELEAJEN REFINERY, PLOIESTI, ROMANIA
Type of Plant: 5000 B/D LUBE OIL PLANT