Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #78318 next resume »»
CONTACT INFORMATION:
View contact information...

PERSONAL INFORMATION:

Date of Birth: June 28, 1954

Place of Birth: Silay City, Negros Occidental, Philippines

Civil Status: Married

Citizenship: Filipino

Height: 5ft 10inches

Weight: 180 lbs.

Gender: Male

BENEFICIARY: Eruce Lee B. Paez

EDUCATIONAL BACKGROUND:

Tertiary:
West Negros College
Bacolod City, Negros Occidental, Philippines
B.S. Mechanical Engineer
Date Graduated: 1974

Secondary:
Silay Institute
Silay City Negros Occidental, Philippines
Date Graduated: 1970

Primary:
BO. Tanza Elementary School
E.B. Magalona Negros Occidental, Philippines
Date Graduated: 1970

EMPLOYMENT RECORD:

POSITION HELD: Piping Supervisor/Field Engineer

INCLUSIVE DATE: November 9, 2007 to September 27, 2008

LINE OF WORK:

Conducting a piping training program from zero skill up to a skill trainees supervising the assigned work from planning, organizing, leading and controlling.
Performed piping work activities from designing and drawing the piping tie-in to existing pipelines, drawing various structural platform such as: valves operator platform, workshop structure, pipe racks, pipe supports, pipe shoes and guides.
Conducted the technical methods in piping erection, installation, fabrication and hydro testing.
Checking and correcting the pipelines for punch list and unknown repairs.

EMPLOYER:

Consolidated Contractors Company Co. W.L.L. Khursaniyah Gas plant Project Al-Khobar, Kingdom of Saudi Arabia

WORK PERFORMED:

Procurement of materials for sulfur process lines such as: pipes, pipe fitting and I-beams for pipe racks and pipe support for superheated water pipe lines and compressed air pipe lines at train #1 and train #2 sulfur process plant.
Designed, drawing and rectify pipe support for sulfur foam pipe lines.
Checking and correcting pipe lines from sulfur loading to sulfur process plant at train #1, #2, and #3.

POSITION HELD: Piping Supervisor/Field Engineer

INCLUSIVE DATE: July 24, 2006 to July 25, 2007

EMPLOYER:

Contracting and Trading Co. (C.A.T.) Abu Dhabi Branch, P.O. Box 250
Email: catnt@enirates.net.ae
Telephone: 6721626

WORK PERFORMED:

Procurement of materials for Fujairah oil tank farm project such as: pipes, pipe fittings and I-beams (for pipe racks and support).
Designed, drawing for valves operator platform and pipe support for Mussafah Ghq. District cooling scheme project.
Designed, drawing for piping tie-in to existing pipelines for black oil pipelines manifold #3 at Fujairah oil tank farm project.
Conducting the fabrication, installation and hydro testing for 32"Ǿ suction and 20"Ǿ discharge header pipelines at Fujairah terminal phase-V expansion (oil tank farm project).

POSITION HELD: Workshop Supervisor and Compaction Foreman

INCLUSIVE DATE: July 30, 2005 to May 30, 2006

LINE OF WORK:

Supervising of work such as: fabrication and erection of ten tons overhead crane, pipe support, ducting and diesel tank.
Supervision of soil compaction for Doha New Airport Reclamation Area.

EMPLOYER:

International Engineering and General Contracting (I.E.G.) P.O. box 40111 Block #3, 4th Floor Al Jaber Towers Opp. Museum Doha,

WORK PERFORMED:

Compaction of new airport reclamation area.
Fabrication and erection of ten tons overhead crane, pipe support, ducting and oil tanker.

POSITION HELD: Mechanical Piping Foreman

INCLUSIVE DATE: February 18, 2004 to September 27, 2004

LINE OF WORK:

Supervision of piping such as: piping erection, installation and hydrostatic testing.

EMPLOYER:

Hyundai Engineering and Construction Co. Ltd. P.O. Box 753991-111 Assaluyeh, Islamic Republic of Iran

WORK PERFORMED:

Erection and installation of mechanical pipelines at on sure gas plant facilities.
Hydrostatic testing and re-instatement of mechanical pipelines at offshore oil rig platform south pars development phases (SPD) #6 and #5

POSITION HELD: Mechanical Piping Gen. Foreman

INCLUSIVE DATE: July 15, 2002 to August 12, 2003

LINE OF WORK:

Supervision of piping activities in all areas of responsibilities.
EMPLOYER:

Mohammad Al-Mojil Group (MMG) P.O. Box 11, Dammam, K.S.A. 31411
Telephone: 8421111

WORK PERFORMED:

Fabrication/installation, hydrostatic testing of pipelines for Khuff condensate oil refinery at Rastanyra, K.S.A. and Jueg EO/EG plant (petro chemical plant) at Jubail, K.S.A.

POSITION HELD: Mechanical Piping Supervisor

INCLUSIVE DATE: September 21, 2001 to November 28, 2001

LINE OF WORK:

Supervision of mechanical piping activities at:
Kapeo Phils. Co.
Dong Won Ahe Co. Ltd.
Dong Won Engineering Co.
Kephilco Thermal power plant

EMPLOYER:

Flour Daniel Pacific Inc.

WORK PERFORMED:

Dismantling of element ¡V re-cladding, removal of insulation, casing removal and removal of elements
Replacement of element¡XElement installation,casing insulation, full welding and re-cladding, pro testing was performed as per specifications.
Fabrication and installation of 40,000 gallons crude tank vessel. Fabrication/installation of accessories pipe lines

POSITION HELD: Piping Foreman

INCLUSIVE DATE: Jan. 08, 1996 to July 19, 1996

LINE OF WORK:

Offshore Constructions of Mechanical pipelines/Structural Platforms for Oil Wells Oil Control Platforms.

EMPLOYER:

ARAMCO¡XSponsored by: AGAP ARABIA, LTD.

WORK PERFORMED:

Monitoring Meiscor (Sub-contractor) daily activities for Sendet Bar Plant pipeline installation and equipment tie-in.
Rectifying all failures due to faulty material and/or workmanship as per piping spec/piping general requirements.
Tracking down installed quantity/punch list materials.
Assisting Meiscor (Sub-contractor) in performing hydrostatic testing for acceptance

POSITION HELD: Piping Foreman

INCLUSIVE DATE: Dec. 6, 1992¡XDecember 14, 1993

LINE OF WORK:

Lekhwair Oil and Gas Facilities.

EMPLOYER:

BROWN and ROOT MID EAST, L.L.C

WORK PERFORMED:

Supervising the constructions of mechanical pipelines, Pipe,support,instrument tubing, hydro-testing and Functional test from oil well heads to riser for oil well Platforms.
Supervising the construction and modifications of elevated access platform for well heads.
Supervising the installation of electrical equipments such as: transformers, fiber optic box, cable trays and brackets for oil control platform.

POSITION HELD: Mechanical Piping Foreman / Supervisor

INCLUSIVE DATE: October 16, 1991¡XApril 30, 1992

LINE OF WORK:

Erection of 350 Megawatts/Unit Steam Power Plant.

EMPLOYER:

MITSUBISHI HEAVY INDUSTRIES, LTD. Az-Zour, Kuwait

WORK PERFORMED:

Fabrication/Installation of small and large bore stainless steel pipe as per Dwg. Spec. for Sulferox Chemical Plant.
Erection of large bore carbon steel pipe from bulk separator vessel trim to pipe racks (tree units).

POSITION HELD: Piping Foreman

INCLUSIVE DATE: Dec. 13, 1984 to Aug 8, 1985

LINE OF WORK:

Coal Mine Conveyor System.

EMPLOYER:

ENGINEERING EQUIPMENT, INC. (EEI)

WORK PERFORMED:

Scheduling/distribution of activities to my subordinates
Report any deviation from the constructions dwg.
Report progress of work in terms of installed quantity and no. of men utilized.
Controls materials, tools and equipment being used for the accomplishment of work.
Enforces company rules and regulations and safety.

POSITION HELD: Piping Foreman

INCLUSIVE DATE: April 23, 1983 to Feb. 14, 1984
LINE OF WORK:

MWSS ¡V Pump Lift Sta. Rehabilitation.

EMPLOYER:

ENGINEERING EQUIPMENT, INC. (EEI)

WORK PERFORMED:

Structural erection and installation of BSPI transfer tower.
Assembly/installation and alignment of BSPI transfer transfer mechanical accessories.
Structural/mechanical installation and alignment of four Drive Sta. Unit
Belt frames and conveyor tail Sta. Installation/alignment.
Belt frames roofing installation/alignment.
Functional testing. Service and maintenance.

POSITION HELD: Piping Foreman
INCLUSIVE DATE: Feb 14, 1984 to June 9, 1984

LINE OF WORK:

Oil Rig Platform.

EMPLOYER:

BROWN and ROOT INTERNATIONAL, LTD. Abu-Dhabi, U.A.E.

WORK PERFORMED:

Demolition, lay outing, sheet pile installation, rebars fabrication/installation.
Forms fabrication/installation.
Dewatering, conc. pouring, structural roofing installation.
Installed sanitary service pipelines and 6" „w D.I.P. exhaust pipeline.

POSITION HELD: Pipe fitting Trainer/Interviewer

INCLUSIVE DATE: July 8, 1981 to March 18, 1982

LINE OF WORK:

Manpower Development Program.

EMPLOYER:

ASIA INTERNATIONAL BUILDERS CORP. (AIBC)

WORK PERFORMED:

Designed/fabricated/assembled self-invented pipe bender machine.
Installed/fabricated spools/pipe support at offshore.
Hydro-statis testing of pipe lines.
Fabrication of as per Dwg. Specs.

POSITION HELD: Training Supervisor

INCLUSIVE DATE: Jan. 15, 1981 to July 7, 1981

LINE OF WORK:

Manpower Development Program.

EMPLOYER:

CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS. (CDCP)

WORK PERFORMED:

Teaching theoretical and practical method of pipe fittings.
Fabrication and piping system importance to industrial plant. It includes the usage and functions of pipe fittings.
Basic hand tools, equipments and job safety.
POSITION HELD: Piping Foreman

INCLUSIVE DATE: Aug. 18, 1980 to Jan. 14, 1981

LINE OF WORK:

Water filtration Plant MWSS-Balara.

EMPLOYER:

CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.

WORK PERFORMED:

Teaching piping system/fabrication of pipe fittings, trade mathematics and advance techniques of piping fabrications/installation.
Develop zero skill trainees to become full skilled workers.

POSITION HELD: Piping Leadman
INCLUSIVE DATE: June 14, 1980 to Aug 18, 1980

LINE OF WORK:

Sugar Refinery Construction ¡V BUSCO.

EMPLOYER:

CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.

WORK PERFORMED:

Fabrication/installation of polyvinyl chloride plastic(PVC) pipe line at chlorination house.
Replacement of damaged 24" „w and 36" „w D.I.P. bell and spigot type.
Replacement and repair stirring paddle exhaust mud.

POSITION HELD: Piping Leadman

INCLUSIVE DATE: May 4, 1979 to April 5, 1980

LINE OF WORK:

Thermal Power Plant Bo. Malaya (M-2 Project).

EMPLOYER:

ENGINEERING CORPORATION OF ASIA (ECCO-ASIA)

WORK PERFORMED:

Fabrication/installation of 24" „w carbon steel pipe.
Line/pipe support from screen house up to condenser.
Installation of pipe line from vacuum pan, crystallizer to centrifugal basket.
Erection of syrup tank as per DWG spec.
Hydro static testing/functional test.

POSITION HELD: Piping leadman

INCLUSIVE DATE: July 2, 1977 to April 20, 1979

LINE OF WORK:

ATLAS MINING CORPORATION ¡V CICG SUPPLIED.

EMPLOYER:

Copper Mining Plant Construction Cebu City

WORK PERFORMED:

Installed 8 feet „w circulating water pipe line from screen house up to condenser.
Installed large and small bore pipes/support from dearator, boiler feed pump sailing water, high pressure heat, economizer inlet header, turbine and condenser.
Installed large and small bore pipes/support from gland condenser to low pressure heater (four units).

POSITION HELD: Tinsmith/Welder

INCLUSIVE DATE: May 15, 1977 to June 27, 1977

LINE OF WORK:

Car plant.

EMPLOYER:

DELTA MOTORS South Super Highway

WORK PERFORMED:

Installed large bore pipes/support from cell units to ball Filter.
Installed large bore carbon steel underground pipe line from thickener No. 5 up to disposal area.

POSITION HELD: Pipe Welder

INCLUSIVE DATE: Nov. 22, 1976 to May 12, 1977
LINE OF WORK:

Raw Sugar Mill Construction ¡V BUSCO.

EMPLOYER:

CONSTRUCTION DEVELOPMENT CORP. OF THE PHILS.

WORK PERFORMED:

Assembled chassis of basic utility vehicle (Toyota Tamaraw) using riveting machine, Jigs and Arc welding machine.

POSITION HELD: Welder

INCLUSIVE DATE: Jan. 13, 1976 to July 28, 1976

LINE OF WORK:

Shipyard and Repair.

EMPLOYER:

EL'NOR SHIPYARD Mandaue City, Cebu

WORK PERFORMED:

Fit-up/full weld of pipe line fro vacuum pan up to crystallizer.
Production welds of pressure vessel (dearator).
Production welds of chimney (smoke stack).
Erection/fit-up and full weld pipeline from ball mill up to pump house.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 401 to 450 of 10917)Go to Search Parameters...
Brief Description
Twenty (20) years professional experience executing multi-million dollar projects in both domestic and international locations, acting as Owner representative in project controls and business management on major EPC, Lump Sum Turnkey and Joint Venture projects supporting Oil projects
A dynamic professional with over 2 decades (25 years) of rich experience in Project Machinery Planning & Execution, Erection & Commissioning, Maintenance, Quality Assurance, Process Enhancements and Man Management.
ArcGIS 8.x/9.x, ArcGIS Server, ArcObjects, Virtual Earth, C#, VB.NET, ASP.NET, VB6
Control & Instrumentation Engineer
Design Expert, Team Leader, Hardworking, Cost Control, Result oriented Instrumentation Engineer who can work on FEED/DD projects with equal proficiency.
Research & Development, Formulation, Manufacture, Maintenance, Project work
Over 16 years of wide and varied experience in the area of engineering consultancy for Design and Detail Engineering for Oil & Gas, Offshore / Onshore, Refinery, Petrochemicals, Alumna Plant, Pipelines, Gas Processing & LNG projects. I am fully conversant with all types of Process Control & Instrume
Skilled technician expert in Installation, Commissioning, Start-up and Maintenance over machines and equipments for Petrol, Pharma, Chemical and Oil&Gas sector.
WELL COMPLETIONS AND TESTING ENGINEER
engineering-mechanical-management- oil & gas
Professional Engineer in corrosion, NDT, and failure analysis with 14 years experince
Skill Structural Designer with 20+ year of experience
Senior Manager educated to Bachelors degree in Welding Engineering with over 20-yrs of experience in the Oil/Gas Industry
22 years experience in engineering,construction,fabrication,installation both onshore and offshore for refinery, Petrochemical, Oil & gas, LNG and power plant
Bachelor of Civil Engineering with Professional Designation
Long skills for work-over & completion well site supervisor , coiled tubing & snubbing too
Electrical / instrument designer
PDS and Smart Plant, Auto Plant(3D), Microstation, AutoCAD, MS Excel, Word etc.
Experienced Well site & Ops Geologist. Adaptable, strong inter-personal & communication skills, multi-disciplinary team worker. Follow up Operations Geology activity for Operated & Non-Operated assets, supporting Drilling & Completion. Can work independently with minimal supervision. B.Sc, Geology
Industrial Eng. with master degree in HSE. Title obtained: HSE eng. Specialist
Financial Accounting, Costing, Budgeting and Project Accounts
Positions - Project Manager, Project Control Manager, Planning Manager and Director in the area of process simulation, predictive control and risk. Hands on, onshore plants (oil, gas), aluminum, ammonium nitrate, offsite and utilities, offshore platforms and pipelines. Capex from $100M to $5Billion
A production/well completion engineer with over 20 years experience in Canada and overseas
Drilling Financial Controller responsible for all drilling expenditures
15 plus years of Rig and Merchant Naval experience with good administrative and communication skills as a Radio Officer/Purser/Fleet Administrative Officer on board foreign going vessels and rig. Have good experience in handling chopper program, boat program, material movements, crew changes, crew t
I have Very good Experience in the Petrophysical Operation, Studies and Well reservoir Survillance. Have experience in QC/QA of integrated studies. Have leadership experience
Geoscientist
Honor degree in Mechanical Engineering form UK and have gained more than twenty five years experience in the fields of major sub-sea assets management, assets integrity, offshore operations, projects and contracts management, inspection, maintenance and marine related projects.
Marine Pilot/ Mooring Master/ Loading Master
Sr. Technical Writer with Software, O&G expeience, PMP Cert
Materials Controller/Warehouse Supervisor/Logistics Supervisor
Multi skilled engineer, Technical Advisor, Mud Engineer
15 years Mechanical Engineer within Oil / Gas & refinery industry, inclusive 5 years maintenance experience; 5 years for nuclear power project; P.Eng of APEGGA, Canada
Can perform both technical work and sales work involving oil/gas industry more specifically as an advisor, planner, support or salesperson.
Drilling Engineer – DCWO planning, programming, engineering, operations evaluation, performance analysis; deep HPHT gas wells, high deviated, ERD and horizontal oil wells, sidetrack wells; land operations; harsh desert (Middle Asia) and arctic (Siberia) environment; English-Russian-Slovak
Over thirty years of experience in major US and International design/build facilities programs where responsibilities have included senior-level Project Management, Construction Management, Engineering and Design Management, equipment selection, installation and start-up. P&L responsibility for all
Senior Mechanical Engineer experienced in detailed mechanical / thermal / process and E&I design of Fired Heaters, Reaction Furnaces, Reformers, SCR’s WHRU’s, Boilers, Incinerators, Flares and associated ancillary equipment. Very strong E&I, DCS / PLC & BMS skills.
By working 17 years in the field of petrochemical field, I experienced all kinds of key projects like FCCU, Hydro-cracking unit, Hydro-treating unit and have expert ability to do piping static and dynamic stress analysis. Also I have five years working experience as a mechanical engineer in refinery
35 years of experience in the process industry working for engineering firms, equipment manufacturers, chemical company
I am proficient in researching title and court records, including but not limited to conveyances, mortgages and other indexes, along with curing said title when needed. I am able to determine from said title or records mineral and/or surface ownership in Louisiana, Mississippi, Alabama and Texas.
Conducting a piping training program from zero skill up to a skill trainees supervising the assigned work from planning, organizing, leading and controlling. Performed piping work activities from designing and drawing the piping tie-in to existing pipelines, drawing various structural platform
Twenty years of professional experience in, design, consultancy, construction and maintenance, covering a broad range.
25 years of experience in construction, installation, commissioning, testing and maintenance of Electrical, Electronics and Instrumentation equipments and controls in Petrochemical Industry
Have more than 20 years experience in Piping Design and Engineering including Stress Analysis and Piping Materials Control for various projects in petrochemical plants, refineries and commercial chemical plants. Presently working in Worley Parsons (Colt Engineering Corporation), Calgary, Canada
A challenging position in a result-oriented company that seeks an ambitious Person, where acquire professional skills and devotion towards safety on priority, sharing of knowledge as a learning point and grow with the company in allocated budget and high safety/quality services to the client.
A result-oriented and talented professional with an extensive experience 26 years in the oil & gas industry . Expertise in commissioning, DCS control room operations, oil refining processing , crude oil & gas processing, oil & gas operational environment.
PMS-Planned Maintenance and Spares & Purchase Database administrator and building.
Rig Manager/ Drilling Superintendent/ Drilling Supervisor.
Over 18 years experience in 2D and 3D seismic data processing. Processing land desert and mountain data. Processing experience gained in Geofizyka Krakow Ltd, WesternGeco and CGGVeritas. User knowledge of Unix, Linux , excellent Omega SPS and Tango, basic ProMAX. Good MS Office skills.
Advanced Process Controls, RealTime Process Information Systems, LIMS
First   1   2   3   4   5   6   7   8   [ 9 ]   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com