Objective: Seeking a challenging position as an Instrumentation QC Inspector, Supervisor, Field Engineer.
Career Summary:
An Instrument & Electrical Inspector/Supervisor with 15 years of extensive experience in the field of Inspection, Engineering, Construction, Hook-up, Commissioning and Certification of various kinds of Plants such as Petrochemical Plant, Desalination Power Plant, Sewage Water Treatment Plant, Oil & Gas Pipeline, Methanol Plant, LNG Plant, Offshore Platform, FPSO, Refinery Oil & Gas, and Pharmaceutical Plant.
Employment:
Prosafe Production
Mechanical Completion Instrumentation
FDPSO Azurite (1st in the world)
October 08 to January 09
Duties & Responsibilities:
Assigned in Mechanical Completion System Walk down in Vessel, Engine, and Topside Module Utilities.Prior for Precom.
Sonangol Pesquisae Producao
Sr. Instrumentation Technician
Angola-Block-4/05
November 07 to June 08
Saipem FPSO S.p.A.
FPSO Gimboa
Duties & Responsibilities:
Presently assigned in Commissioning Department reviewing all necessary requirement in preparation of Loop Dossier. These are required during Pre-commissioning to Commissioning stage for Topside Module and Vessel Side. In charge instrumentation commissioning materials receiving and distribution.
Petroleo Brasileiro S.A. Petrobras
Electrical/Instrumentation QC Supervisor
Espirito Santo Basin
March 06 to November 07
Saipem FPSO S.p.A.
FPSO CIDADE de VITORIA
Duties & Responsibilities:
Currently assigned to work at GPC Yard "Vetco" and ADYARD "Weir" for five modules, such as Water Injection Sulphate removal, Water Treatment Sulphate Utilities, LP/HP Separation, K.O. Drums, and Flash Gas Compressor and Gas Dehydration.
I coordinate with the contractors regarding their daily planned activities; I also up-date the changes in the drawings as per the actual instrumentation, electrical, fire and gas systems.
During Integration phase in Dubai Dry my task are to monitor and supports engineering drawing like vendor package equipments. In sail away phase Dubai Dry dock to Espirito Santo Basin Vitoria Brazil my job task are to continue balance work and modified design during Integration phase. In close loop check of instruments by commissioning my involvement are providing technical details of instrument and modified wiring termination.
Saipem – Hyundai Consortium
Electrical/Instrumentation QC Inspector
Western Libya Gas
November 04 to January 06
Saipem Sabratha Offshore Platform
Duties & Responsibilities:
I had been assigned to work at offshore hook-up of Integrated Main Deck, Flare & Vent System, Jacket, Living Quarter and Helideck Area, coordinated and controlled Hook-up engineers in accordance with project requirement, updated daily job card progress and provided reports as required, updated engineering drawings for changes prepared and cleared punch lists, and provided materials requirement for punch list item.
Electrical Equipment Including Cabling a)Inspection of all equipment, switchboards, distribution boards for correct installation.
b)Insulation and continuity testing of cables including the correct use and installation of cable glands.
c)Earthing (proper electrical grounding) checks for continuity and resistance.
d)Battery installation checks.
e)Lighting and socket outlet checks.
f)Heat tracing installation checks.
g)Inspection of cable and cable tray installation.
h)Confirmation of identification tags on cables and equipment.
i)Preparation of test records and reports.
j)Monitoring progress report and status of check and test sheet in WINPCS.
Instrumentation a)Calibration checks on field installed instrumentation including shipped loose vendor package instrumentation.
b)Inspection of all equipment, control panels, instrument panels and tubing for correct installation (including correct location).
c)Confirmation of correct identification tags on cables and equipment.
d)Equipment/area compatibility checks-ensure equipment is suitable for the area in which it is installed.
e)Cleaning, pressure and leak testing of pneumatic, hydraulic and instrument signal tubing.
f)Point to point loop checks (instrument power supplies isolated).
g)Installation checks on Fire and Gas (hydrocarbon, H2S) detection and protection instrumentation.
h)Installation and functional checks on HVAC volume control dampers.
i)Function testing of all pneumatic loops.
j)Preparation of test records and reports.
k)Monitor progress report and status of check and test sheet in WINPCS
Petrofac International Limited
Electrical/Instrumentation QC Inspector
Darquain Oil Field Development Iran
January 04 to August 04
Oil Treatment Unit Darquain, Khuzestan Province
Duties & Responsibilities:
I had been assigned to work at O.T.U. and DQ oil rig area and performed inspection for instrument and electrical activities.
a)Prepared and coordinated with the company representatives of ENI for instrument loop dossier and electrical test pack.
b)Prepared excel electronic data file for monitoring of the daily activities such as RFI and construction check and test sheet form.
Chiyoda Snamprogetti & Co. WLL
Instrumentation QC Inspector
Ras Laffan Liquefied Natural Gas Co. Ltd.
July 03 to December 03
Ras Laffan, Qatar
Duties & Responsibilities:
I had been assigned to work at Ras Laffan onshore expansion project in train 3 and train 4 ( the early stages). The areas of responsibility were utilities offsite, sea water intake, process (propane compressor, mixed refrigeration compressor, off gas compressor, oxidation air compressor, and vendor package).
a)Prepared and coordinated check & test certificate to Ras Gas company inspector.
b)Conducted preliminary inspection such as glanding & termination of instrument cable, JB installation, field instrument installation, leak & pressure testing of impulse line and air line for instrument, cable laying prior back backfilled and tray works prior cable pulling, to the sub-con CCC prior to final inspection with company.
c)Conducted material arrival inspection at warehouse and yard, such as cable drum IR test.
d)Monitored and coordinated functional check of DCS by Invesys system.
Foster Wheeler Eastern Private Ltd.
Electrical/Instrumentation QC Supervisor
Schering-Plough R&D Facility
June 02 to February 03
Tuas Singapore Branch
Duties & Responsibilities:
I had been assigned to work at R&D Facility Phase I.
a)Advised the contractors as necessary in the compilation of loop dossiers.
b)Reviewed loop dossiers submitted by the contractor and confirmed that all documentation included therein were acceptable and compliant with loop scope.
c)Issued performance instrument inspection and verification forms to contractors, together with instrument matrix.
d)Received completed loop dossiers to ensure all loop checks records were complete.
e)Updated loop as per system in Q-track database.
f)Prepared loop dossier for documentation in SCCPD and IQ requirements.
g)Monitored BMS functional check by Yokogawa.
Kellogg Brown & Root / Technip
Instrumentation QC Inspector
Qatar Chemical Company (Q-Chem)
January 02 to June 02
Messaied, Qatar
Duties & Responsibilities:
I had been assigned to work at LSTK Ethylene project offsite utilities and process area.
a)Did Final Inspection of instruments as per ITP procedure and system list.
b)Reviewed loop folder attachments prior to pre commissioning activities.
c)Coordinated with sub-contractor Dodsal or within the engineering groups for any deviation and discrepancy in the drawings.
d)Reviewed calibration data sheets, drawings and plans in accordance with the Project Specification, codes and standard.
e)Monitored all instrumentation work progress including witnessing of instrument calibration and signing off certificates.
f)Checked and coordinated with the vendor prior to Site Acceptance Test of the PAGA system.
g)Monitored and coordinated functional DCS for Triconex system.
UTS Kent Engineers and Contractors
Senior Commissioning Instrumentation Technician
Borouge Petrochemical
June 01 to December 01
Ruwais, United Arab Emirates
Duties & Responsibilities:
I had been assigned to work at Ethylene project offsite utilities and process area.
a)Updated instrument data sheets as per priority system.
b)Coordinated to company Bechtel for daily loop checks.
c)Prepared loop dossier as per system.
d)Did as-built drawing after loop checks.
e)Modified field installation as per company requirement.
f)Assisted vendor representative during pre commissioning.
g)Monitored and coordinated functional DCS for Triconex system.
Technip / Bechtel JV
Instrumentation QC Inspector
Onshore and Gas Development II
July 00 to March 01
Habshan, United Arab Emirates
Duties & Responsibilities:
I was assigned to work at Liquid Sulphur Gas Plant, Offsite Utilities and New Thamama C Manifold.
a)Ensured subcontractors CCC compliance with client and contractor project standard.
b)Had been responsible for the contractor's instrumentation witnesses hold-points.
c)Monitored all instrumentation work and inspection as per RFI in a daily basis.
d)Signed off check and test construction certificate.
e)Conducted system punch list prior final check of mechanical completion.
f)Had been responsible for all the speaker installation inspection for the PAGA system.
g)Witnessed PSV calibration with ADNOC representative.
h)Assisted subcontractor's instrument superintendent and engineers in solving QC related problems.
i)Prepared weekly status report to be submitted to the Quality Control Manager, as required.
j)Monitored and coordinated of SCADA system.
Raytheon Energy Overseas International Inc.
Instrumentation Field Engineer
AMPCO Methanol Plant
December 99 to April 00
Malabo, Equatorial Guinea
Duties & Responsibilities:
I had been assigned to work at the Methanol plant.
a)Provided contraction details to the instrument work group.
b)Taken off instrument air line and impulse material.
c)Assisted Engineering Manager for solving construction discrepancy design and actual situation.
d)Taken-off scope of work for vendor representative in accordance with System List.
e)Inspected instrument material arrives at warehouse and yard.
f)Prepared field sketch if required for field installation and wiring termination.
g)Monitored construction work progress as per system.
h)Coordinated with multi-disciplines if necessary prior to execution of instrument works.
i)Prepared check and test certificates for instrument calibration.
j)Did as-built drawing after installation and cold loop test.
Techint – Saipem JV
Instrumentation QA/QC Engineer
Muglad Basin Oil Development
July 99 to October 99
Port Sudan
Duties & Responsibilities:
I had been assigned to work at EPCC of Marine Terminal Facilities, Pumping Facilities and SCADA Telecommunication System.
a)Assisted vendor pre-commissioning to commissioning of Power Generation Package by Rolls Royce, SCADA, Booster Pump and Shipping Pump.
b)Assisted technical query to the construction group.
c)Installed temporary field installation and wiring termination.
d)Monitored site work progress.
e)Checked and tested cable, field and vendor instrument installation.
Kellogg Algeria Inc. (MWK)
Instrumentation Field Engineer
Enhanced Oil Recovery
October 98 to April 99
Rhourlde El Baguel, Algeria
Duties & Responsibilities:
I had been assigned to work at MWK Engineering and Technical Services for SONARCO enhanced oil recovery project.
a)Provided technical and engineering supports to construction.
b)Checked all drawing, specification, standard and performs material take-off and field purchase requisition as required.
c)Inspected instrumentation and control package / skid, material as per purchase order.
d)Monitored and inspected work assuring quality and punch listing.
e)Checked design drawing against vendor-supplied information for possible discrepancy.
f)Prepared the instrument data sheet, instrument installation detail and field sketches.
g)Revised and did as-built project-associated drawings.
h)Monitored and coordinated Nuovo Pigione functional checks of HP and MP compressor.
Petrocon Arabia Ltd / Mc Connell Dowell
Instrumentation Technical Support
SAMREF DCS Upgrading
September 97 to July 98
Riyadh, Kingdom of Saudi Arabia
Duties & Responsibilities:
I had been assigned to work at the Saudi ARAMCO Riyadh refinery upgrading.
a)Had been responsible for execution and development of engineering design packages for ongoing Saudi Aramco and in-house project.
b)Involved with instrumentation & control system associated with electrical work.
c)Researched and gathered technical information from field site and library.
d)Provided and modified technical information for execution of new DCS control system.
Kurihara Kogyo Company Ltd.
Instrumentation Design Engineer
Kranji Sewage Treatment Works Phase III
August 96 to September 97
Kranji, Singapore
Duties & Responsibilities:
I had been assigned to work at the Ministry of Environment Kranji and Seletar Sewage Treatment Works.
a)Had been responsible for planning, estimating, establishing budgets and providing technical assistance for construction projects of company.
b)Developed ILD, hook-up drawing, data sheets, location drawing, and prepare cable schedule.
c)Prepared instrument material take-off.
d)Prepared cable routing and tray works.
e)Prepared details for vendor interface cable.
f)Checked and analysed logic control drawing to P&ID requirement.
g)Reviewed vendor IRP drawing as per company requirement.
h)Monitored and checked instrument installation as per hook-up details.
i)Coordinated with the vendor for instrument material order.
Saipem / Snamprogetti JV
Electrical/Instrumentation QC Inspector
Bab-Maqta-Taweelah-Tamama C Pipeline
January 95 to February 96
Abu Dhabi, United Arab Emirates
Duties & Responsibilities:
I had been assigned to work at ADNOC Habshan OGD I, Asab, Bab, Buhasa, Ruwais, Mirfa, Um Al Nar, for SCADA interface.
a)Had been responsible and preparation for QA/QC documentation instrumentation, electrical, cathodic protection, and fire and gas system.
b)Had been responsible for material check arrival at site warehouse.
c)Monitored site works daily activities such as installation of supports, cable tray, impulse line, junction box, marshalling panel, cable laying, instrument calibration, DCS panel installation, and earthing installation.
d)Supervised revamping of field instrument, cable and impulse line at gas compressor.
e)Coordinated and applied work permit in the different areas of responsibilities like GASCO, ADNOC, and pipeline division.
f)Assisted the vendor for pre-commissioning of gas reducing package, fire and gas system and gas compressor.
g)Did Functional test of MOV and ROV.
h)Did Functional test of RTU with different pipeline location.
i)Conducted check and test for cathodic protection system.
j)Prepared details field installation of instrument and impulse line.
Shapadu Engineering / Rekayasa JV
Instrumentation Technician Specialist
Petronas Lube Oil Blending Plant
March 94 to August 94
Tang-ga Bato Malacca, West Malaysia
Duties & Responsibilities:
I had been assigned to work at Petronas lube oil blending plant in instrumentation department.
a)Did supervising of field installation, cable laying, junction box installation, air line and impulse line, wiring termination, and calibration.
Saline Water Conversion Corporation
Asst. Instrumentation Technician
Desalination Power Plant Combine Cycle
December 92 to February 94
Al-Jubail, Kingdom of Saudi Arabia
Duties & Responsibilities:
I had been assigned to work at the Maintenance Power Utilities Department.
a)Conducted preventive maintenance works.
tecno@control
Instrumentation Sales and Services
Instrumentation Supply and Services
April 91 to November 92
Multinational Company, Heavy Industrial Plant & Pharmaceutical Plant
Duties & Responsibilities:
I had been assigned to work with a multinational company regarding their own work requirement.
Trainings & Seminars Attended:
1.Permit to Work System (PTW) @ Saudi Aramco
2.Permit to Work System (PTW) @ ADNOC
3.IDMS for Kellogg
4.Info works for Bechtel
5.Q-Track for Foster Wheeler
6.Good Document Practice (GDP) for Schering-Plough
7.WIN PCS for Saipem
8.Informatics Computer Institute Phil. For Microsoft office, world, windows, excel, & power point, access.
9.Silva Mind Method for Basic Lecture Series 101 Thru 404
10.University of Philippines for Entrepreneurs Basic Course.
11.Don Bosco Research Centre for Skills upgrading in Instrumentation PLC
12.Basic Offshore Safety Induction and Emergency Training @ IDESS Subic Phil. (Certificate valid until 9th day of November 2008)
13.Hydrogen Sulphide Awareness @ IDESS Subic Phil.
Schools Attended:
I.Don Bosco Technical College
1988 to 1991 Instrumentation Technology
Specialized in Process Control & Instrumentation
II.Makati High School
1984 to 1988 Secondary
III.Makati Elementary School
1979 to 1984 Primary
Hobbies & Interests:
Mountain biking, hiking, collecting tribal handicraft for necklaces and bracelets, body art tattoos, reading books and magazines, gardening, and visiting museums
Personal Profile:
Height:5 ft 7 inch.
Weight:98 kg.
Marital Status:Married
Nationality:Filipino
Languages:English, Tagalog
Date of Birth:30-March-1971
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1051 to 1100 of 10926)
Go to Search Parameters...
Brief Description
20+ Years experience in all aspects of Offshore Oil & Gas Exploration, Construction, Developement & Production. And Onshore Processing. Most recently in Safety & Environment sector.
Snr Completions Supervisor & Well Intervention Supervisor.
Lead Rotating Equipment Engineer / Lead Packaged Equipment Engineer / Condition Monitoring Senior Specialist
40+ years oil and gas drilling experience.
Drilling or Fluid consultant position
Chief Inspector for Pengrowth Corporation. 17+ years of experience in inspection in NDE, Plant enviroment and field. Certifications include CGSB UT II, MT II, API-510, Studying for National Board exam in December.
20+ years in drilling, production and construction in logistics, base management, contracts, purchasing, materials management, working knowledge in French and Spanish and willing to work internationally
valve Inspector,Maintenance Supervisor.Advisor, SME
Experienced Refractory Project Manager / Construction Manager / Consutant
Autocad, Autoplant, Navigator, Navis Explorer, Autoplant Administrator, GTX Rastercad, LFM Modeller/Server, All aspects of Pipe support design, Piping Design Section Leader, Piping codes and standards, MS Access and all windows based software, skilled in all aspects of Piping design & layout.
Piping superintendant with 35 years experience in the oil and gas industry
Operation and Management of Offshore Laboratory
Able to coordinate the entire QHSE aspects of offshore drilling work unit start up, drafting & facilitating training for all offshore personnel.
I have gained a wealth of knowledge in my twenty four years in the oilpatch. I was a contractor for seventeen years and a Construction Consultant ( coordinator) building roads and leases, Pipeline Inspector and Rig move Tranportation Logistics Coordinator.
I have over 25 years experience as a Project Manager in the Marine insustry
Twenty-Plus years experience in the design, development, commissioning and maintenance of Process, Batch and Material Handling Control Systems. Experienced in a variety of industries including Petro-Chem, Food, Power Generation, Offshore Production and Land based Drilling.
Boiler Service Manager
Extensive International offshore experience, with skills and qualifications in the fields of Well site supervision, OIM/Drilling and Wellbore Intervention. Strong focus on QHSE, Team work, Planing, execution and cultural awareness. Experience in both Development and Semi Exploration drilling.
Technician in mechanical engineering
With 15 years piping design and construction experience for onshore/offshore facilities, skidded process systems and topsides for clients such as Shell, Petrobras, MODEC, Petronas, BP, Saudi Aramco, Petrokemya, ExxonMobil, Mutineer & Exeter, CNOOC and Qatar Petroleum.
Rotating Equipment Engineeer with 15 yeras of Experience in Oil & Gas Sector
This is Esmaeil Rezaei from Iran and I have 37 Years old. I was graduated form Shiraz University with M.S. degree in chemical engineering. I have 12 years experience in petrochemical company in Shiraz city.
Experienced Sr Contracts Administrator
Subject: Application for the Post of Geologist
More than 15 years experience in proposal / tenders / bids, presently working in MNC with position of Proposal Team Leader. The company is providing QA/QC services to oil & gas industry. During the last decade I have been improved the present company’s business, with a budget target of 20M€
Experience in commissioning 5MW wartsila diesel engines, underwater mountable Thrusters, marine systems, meeting with owner and class surveyor, technical management of ships, operation and maintenance of marine systems
An Instrument & Electrical Inspector/Supervisor with 15 years of extensive experience in the field of Inspection, Engineering, Construction, Hook-up, Commissioning and Certification of various kinds of Plants such as Petrochemical Plant, Desalination Power Plant, Sewage Water Treatment Plant, Oil &
All level of catering , Laundry, Housekeeping, HSE and Quality
Senior Geologist & Petrophysicist with over 12 years of experience involved extensively in onshore and offshore oil/gas projects (domestic & international).
I am the highly and motivated person with 25 years experience in Petrochemical Company. Since Nov 15, 2002 to present, i am working in Qatar Fertilizer Company as Production Specialist. Previously i was working in Dow Chemical Co. with the last posisiton as Plant Operation and Safety Coordinator.
I am a graduate Mechanical Engineer with over 20 years Oil & Gas Refining industry experience, out of which about 10 years at a AMOCO fuels and lube refinery at India. I am currently working as the Mechanical Design Engineer for a prestigious mega refinery project (world¡¦s largest grassroots refine
Wellsite and Operations Geologist. Speciality correlation and positioning in 3 D using Seismic, logs or limited data
senior geologist
-Experience in O&G BU Management, technology as key driver. Surpassed goals while managing 80000 and 50000 bopd units. -Managed US 5.3 MMUS$/year technical services portfolio in most areas of O&G E&P, for all BU's of PDVSA and partners (Shell, Chevron, Conoco), 94% client satisfaction.
A qualified engineer with over 16 years of experience in production
"Rotating Equipment Engineering Specialist" with 17 years experience in refinery, gas plants, LNG plants and petrochemical plants for rotating equipment maintenance support, diagnostics, troubleshooting, reliability improvement and repair.
EM/MWD/LWD Gamma
I was assigned as Production Technologist for PETRONAS. My assignment mainly in Field Development Project whereby my job scopes are focusing on well &tubing design i.e. well completion design, artificial lift screening/selection & design, Sand prediction & sand control selection,
I am Expert on Reservoir Engineer, my capabiliity can cover whole petroleum engineering
Monitor and supervise partner organization's financial activities, monitor budget utilization, prepare multi-year budget for the organization and project. Conduct workshop/seminar for the partners on administration and financial management as per donors requirement, financial reporting & compliance.
SAP FICO / JVA
Over ten years of experience in the design, troubleshooting, maintenance and optimisation of new and existing facilities including sweet and sour natural gas plants, oil batteries, water injection, water treatment and chemical plants.
Free!
Commissioning, Operation, Leadership skill, able to multi-tasks & can perform under pressure.
This letter is to express my interest for a Senior position in oil & gas Exploration. Based on my skills in Geology and oil and gas Exploration and New Ventures, Experienced Geoscientist, Explorationist and new ventures activities; PhD graduated In Geology (1991), bachelor (structural geology).
Senior Geophysicist with 25 years of experience - domestic (Canada) and international.
Electrician - Canadian journeymen , Instrument Technician - Canadian certification,10 years Supervisory, Startup and commissioning expert. Offshore FPU FSO. PLC Expert/ DCS, Experenced Trainer. High Voltage, protection relay testing, Valve repair, Work exp. in Canada, Libya. Indonesia.
Diagnose and repair engines, transmission and final drive systems including manual and automatic transmissions
Senior Project Material Coordinator, Warehouse Control Management, Procurement & Buyer Analyst, Operation Logistic & Crew Manning Administration and Project Coordinator.
B.Tech Chemical with Refinery,petrochemical Experience
I have over 32 years in the Coatings industry, 22 years as a Coatings Inspector (British Gas/CSWIP BG57012), with 14 years as a Coatings Advisor to ExxonMobil Nigeria. My duties For Exxonmobile included Inspection of all onshore and offshore facilities also new construction projects. Other duties in
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
[ 22 ]
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com