1. Experience: Daewoo NIG. LTD. NIGERIA
Name of project: GBARAN UBIE OIL&GAS Project. NIGERIA
Job Title: Welder GTAW-SMAW: SS, CS, And Duplex SS
Service Period: Oct 16, 2008 until now
Job Description: Gymnastics before safety toolbox meeting
Job division from supervisor to every crew. Prepare welding equipment, fit up check before weld of pipe. Turn on purging gas by the argon infusion for SS and Duplex SS. Keep out my weld product from defect.
2. Experience: PT. McDermott Indonesia. BATAM.
Name of project: PTTEP ARTHIT Central processing PLATEFORM Batam Fabrication and Thailand Offshore field.
Job Title: Welder GTAW-SMAW: SS, CS, And Duplex SS.
Service Period: August 18, 2006 until April 24, 2008
Job Description: Toolbox safety meeting, prepare welding equipment after accept job order from supervisor/foreman. Check pipe before welding with the procedure. Turn on purging gas by the argon for infusion and use Sandvik 2209-filler wire for duplex SS pipe, ER 80 S NI-1 for Carbon steel OK 7018-C1 for SMAW
Preheat 40 C minimum temperatures for Carbon steel only.
Safety training (MSTS) combined sea survival, fire fighting & first aid. Weld at offshore field, Shongla-Thailand ARTHIT PLATEFORM.Lived in DB 26, work at LQ - Plate form and wellhead. Keep out of my weld product from defect, bring about company ordinance.
Reason of Leaving: Contract Complete
3. Experience: PT. Nippon Steel. BATAM.
Name of project: TOTAL SISI NUBI Central processing PLATEFORM
Job Title: Welder GTAW-SMAW: SS, CS.
Service Period: May 23, 2006 until August 07, 2006
Job Description: After briefing about safety & quality, weld pipe SS, CS at fabrication spool shop, prepare welding equipment and preheat the pipe joint before to weld.
use LB 7016 & LB 7018 arc electrode, TGS 50 wire root of Carbon steel.
316 L filler wire for stainless steel and use argon gas for purging/infusion.
Reason of Leaving: Contract Complete.
4. Experience: PT. Mc Dermott Indonesia. BATAM.
Name of project: PTTEP ARTHIT Central processing PLATEFORM
Job Title: Welder GTAW-SMAW: SS, CS, And Duplex SS.
Service Period: August 18, 2006 until April 24, 2008
Job Description: Toolbox safety meeting, prepare welding equipment after accept job order from supervisor. Check pipe before welding with the procedure.turn on purging gas by the argon for infusion and use Sandvik 2209-filler wire for duplex SS pipe, ER 80 S NI-1 for Carbon steel OK 7018-C1 for SMAW
preheat 40 C minimum temperatures for Carbon steel only.
Keep out of my weld product from defect and bring about company ordinance.
Reason of Leaving: Contract Complete
5. Experience: PT. Truba Jurong. Eng
Name of project: Cilacap 2 x 300 MW Coal Fire Steam Power Plant Project
Job Title: HP 1 GTAW-SMAW: CS. Boiler Welders
Service Period: February 28, 2005 until Dec 28, 2005
Job Description: After briefing about safety & quality, Prepare welding equipment and preheat the pipe joint before to weld. GTAW-SMAW alloy steel (A-335 P91) use the filler metal TGS-9Cb / CM 9 Cb
LB 7018 arc electrode, TGS 50 wire root of carbon steel, weld pipe 2"CS at fabrication spool shop and assemblies panel of boiller.
Reason of Leaving: Contract Complete
6. Experience: PT. Mc Dermott Indonesia. BATAM.
Name of project: FPSO CONOCO project, JVPC CPP VIETNAM Project.
Job Title: Welder GTAW-SMAW: SS, CS, And Duplex SS.
Service Period: December 05, 2003 until January 29, 2004
Job Description: Toolbox safety meeting, prepare welding equipment after accept job order from supervisor. Check pipe before welding with the procedure. turn on purging gas by the argon for infusion and use Sandvik 2209-filler wire for duplex SS pipe, ER 80 S NI-1 for Carbon steel OK 7018-C1 for SMAW
preheat 40 C minimum temperatures for Carbon steel only.
Keep out of my weld product from defect and bring about company ordinance.
Reason of Leaving: Contract Complete
7. Experience: PT. Profab Indonesia. BATAM.
Name of project: Vessel Fabrication of CONOCO Project
Job Title: Welder GTAW-SMAW: CS, INCONEL
Service Period: July 30, 2002 until January 29, 2003
Job Description: Toolbox safety meeting, prepare welding equipment after accept job order from foreman/supervisor. Welding plate and pipe with the procedure.
Keep out of my weld product from defect and bring about company ordinance.
Reason of Leaving: Contract Complete
8. Experience: FORMOSA HEAVY INDUSTRIES TAIWAN. R. O. C
Name of project: Mailiao Power Plant Project.
Job Title: Welder GTAW-SMAW: CS,
Service Period: February 05, 1998 until February 25, 2000
Job Description: Toolbox safety meeting, prepare welding equipment after accept job order from foreman/supervisor. Welding plate and pipe with the procedure.
Keep out of my weld product from defect and bring about company ordinance.
Reason of Leaving: Contract Complete
9. Experience: PT. Truba Jurong. Eng
Name of project: Tambak Lorok Power Plant Project. Semarang,Central-Jawa
Job Title: Semi Skill, QC Crew
Service Period: March 15, 1996 until February 03, 1997
Job Description: Toolbox safety meeting, abreast and work with leader, welding report and help QC fit up; help inspection with panetran/MT PT.
Reason of Leaving: Contract Complete
Interest/hobby: Reading, sport, music and traveling