CONTACT INFORMATION:
View contact information...
. PROPOSED POSITION: Instrumentation Engineer
3. PLACE OF BIRTH: Vishakapatnam,India
4. NATIONALITY: Indian
5. EDUCATION: Graduated from Bachelors Of Electronics and Instrumentation Engineering Department
Periyar University, 2003
DATE OF BIRTH 06-11-1980
7. TRAINING * HSE for Supervisors,PDO,OMAN
* Permit Applicant,PDO,OMAN
* HSE Training with SHELL Standards, OMAN.
- PLC,DCS AND SCADA at TATA HONEYWEL
8. OTHER QUALIFICATION * Design and drafting control systems using AutoCAD
* Computer Literate:
- Windows, MS Office,, AutoCAD 2000
9. LANGUANGE & DEGREE OF PROFICIENCY SPEAK READ WRITTEN
HINDI EXCELLENT EXCELLENT EXCELLENT
ENGLISH GOOD GOOD GOOD
10. E-MAIL: raghuinstrumentation@yahoo.com
Objective:
Excellent opportunity in an esteemed organization with a challenging environmental provides a lot of scope for career development and knowledge escalation.
Engineering Experiences:
* Familiar with Standard and Code (ISA).
* Piping and Instrument Diagram (P&ID) Review and Evaluation.
* Instrument data sheet preparation.
* Instrument Index and PLC I/O List preparation.
* Bill of Material for Instrument Bulk Material preparation.
* Instrument Design and Drafting.
* Engineering Work Package (EWP).
2007, December-now: L&T ELECTROMECH LLC, OMAN
Position: Instrument Engineer
CLIENT: Engineering and Maintenance Contract, Petroleum Development of Oman (PDO)
Responsibilities:
* Engineering Work Package preparation
* Material take off
* Cable Schedule
* Instrument drawings (Block Diagram, General Arrangement, Elementary Diagram, Interconnection Diagram, Instrument Loop Diagram) design
* Instrument drawing index preparation
Scope of work:
The purpose of this project is to provide instrumentation and control system installation for all PDO Interior areas. The scope of instrument and control work generally includes:
1. P&ID and PEFS review.
2. All instrument construction and maintenance activities.
3. Installation of junction box complete with terminal block.
4. Run and terminate signal cables.
5. PLC software programming.
2007- July to 2007 November: Hofincons LLC, OMAN
Client: AL-GHUBRA POWER AND DESALINATION COMPANY SAOG.MAINTANENCE
Position: Instrument Engineer
Responsibilities:
* Engineering Work Package preparation
* Material take off
Scope of Work:
Temporary control systems have recently been installed. The temporary systems were installed when the old SAFE control systems became unreliable and expensive to maintain. The temporary control systems were installed without engineering drawings and documentation, because it was an urgent job with a tight schedule. The scope of work includes:
* Centralize monitoring and control for all Gas Turbines in the new Control Room
* Install 4 additional terminals for control.
* Update and expand the control systems.
* Upgrade the motor controls to the current PTI standard.
* Replace the DC drives on the belt feeders to increase the feed capacity.
* Install a dedicated PLC communication network for each Gas Turbine.
* Prepare Instrument drawings (Block Diagram, Interconnection Diagram, Instrument Loop Diagram, Elementary Diagram and Cable Routing)
* Prepare Material Take Off
* Prepare Cable Schedule
Prepare Engineering Work Package
Check instrument loop and connectivity, cross check the transmitter range with field calibration, review the MMI reading to be the actual / field reading.
* Prepare Commissioning Procedure
* Prepare Cable and Wire List
Assist during commissioning to check cable connection and all analog/digital signals with instrument maintenance
2006, March ¡V 2007, June: CONSTRUCTION DEVELPOMENT COMPANY (CDC), DOHA, QATAR
Position: Instrument Engineer.
CLIENT: QATAR PETROLEUM.QATAR.
Position: Instrument Design Engineer
The purpose of this project is to renovate the old PLC and DCS systems with the new of make Honeywell and Allen- Bradley systems. Scope of work:
* Prepare Instrument drawings (Block Diagram, Interconnection Diagram, Instrument Loop Diagram, Elementary Diagram and Cable Routing)
* Prepare Material Take Off
* Prepare Cable Schedule
* Prepare Engineering Work Package
* Install a dedicated PLC communication network
Prepare Engineering Work Package
Check instrument loop and connectivity, cross check the transmitter range with field calibration, review the MMI reading to be the actual / field reading.
* Prepare Commissioning Procedure
* Prepare Cable and Wire List
Assist during commissioning to check cable connection and all analog/digital signals with instrument maintenance
Check instrument loop and connectivity, cross check the transmitter range with field calibration, review the MMI reading to be the actual / field reading.
2003, JUNE ¡V 2007, February: SRUJANA ENGINEERING, VISHAKAPATNAM, INDIA
Position: Instrument Engineer (E/I Section, Central Engineering Department)
CLIENT: Reliance Power, Jamnagar, India
: TATA Steel, Jamshedpur, India.
B.HP.V.Limited, Vishakapatnam, India
Screening Station #8 Hopper Camera
During this tenure the following are my roles and responsibilities:
* Prepare Instrument drawings (Block Diagram, Interconnection Diagram, Instrument Loop Diagram, Elementary Diagram and Cable Routing)
* Prepare Material Take Off
* Prepare Cable Schedule
* Prepare Engineering Work Package
* Install a dedicated PLC communication network
Prepare Engineering Work Package
Check instrument loop and connectivity, cross check the transmitter range with field calibration, review the MMI reading to be the actual / field reading.
* Prepare Commissioning Procedure
* Prepare Cable and Wire List
Building Ladder logics in Allen Bradley PLCs.
I/O trouble shooting.
Usage of GUS and US in Honeywell DCS systems.
Digital and pulse I/O cards.
Foxboro 1/A Series system support software.
Working on Devices as relays, push button. Selectors and Limit switches/
Instrument detailed installation design.
Hook up drawings.
Data sheets.
Installation Drawing.
Assist during commissioning to check cable connection and all analog/digital signals with instrument maintenance
Check instrument loop and connectivity, cross check the transmitter range with field calibration, review the MMI reading to be the actual / field reading.
THE FOLLOWING ARE GENERAL ACTIVITES EXECUTED IN INSTRUMENT PROJECTS:
„« To carry out routine, shutdown maintenance of all types of instrument located at different equipment/unit like-gas lift compressor, bulk separator, test separator, inlet manifold, and glycol observer, gas conditioning unit, heat exchanger and turbo expender.
„« To carry out one yearly process safe guarding and instrument maintenance without any deferment including fire and gas system
„« To carry out one yearly production flow metering maintenance.
„« To carry out preventive/corrective maintenance of final control element system. Like ESDV and control valve.
„« Participated as a lead engineer in fault finding and trouble shooting of all type problems.
„« Having good knowledge to understand of all types of drawings like-C&A, FLD, TRIP&ALARM, SIGNAL LOOP DIAGRAM, HOOKUP and PEFS.
„« Comply with safety, MCP, Quality and standard to carry out maintainenance of any type of instrument.
Oil field
„« Participated as lead instrument engineer in Gathering/Production station and refinery in and acquired knowledge as under
„« To carry out routine/shutdown maintenance of all types of instrument located in different unit and equipment like-Bulk separator, inlet manifold, Surge tank dehydration.
„« Gas booster compressor, gas injection compressor, Flare, Drain vessel, Gas lift compressor, Water injection pump, Deep water disposal pump, shipping pump, Skim tank, and high pressure oil production well head.
„« To carry out all types of instruments located in refinery like-SUR, DHDT, CDU/VDU, CCRU, Ammonia Plant, HGU, LPG bottling Plant and VBU.
Construction
„« Participated as lead instrument engineer in construction responsibility of different project.
„« Review of received material as per engineering data sheet.
„« Reading and understanding of all types drowning to execute the work as per quality, understand and procedure like-PEFS,Signal loop diagram, Plan drawing, engineering data sheet, cable schedule and trenching details lay out, hook up, and FLD,junction box termination details, panel termination details.
„« Pre installation calibration check and pre commissioning loop check.
„« Glanding and termination.
„« Commissioning assistance to the commissioning team.
„« Preparation of as built drawing and test pack sheet.
„« Construction, installation and commissioning of 175 nos of high pressure production well.
„« Construction, installation and commissioning of different compressor like-G/C, GBC and SRC.
„« Installation of different type's pump, like DWD water injection pump, shipping pump and booster pump.
„« Commissioning of centrifugal and reciprocal type compressor including electrical driven diesel driven and solar type compressor.
Experience in control Automation system
„« Safeguarding:-HIMA-PLC, HONEYWELL-FSC, YOKOGAWA-PRO SAFE PLC.
„« Field Control:-YOKOGAWA-STARDOM CONTROLLER.
HONEYWELL-TDC-3000.FOXBORO-SPEC-200.EMERSION-DELTA-Vwith FOUNDATION field bus control system.
„« Condition Monitoring:-SKF-VM-600.BENTLY NAVEDA-3500
„« Equipment handled:-Multifunction calibrator, Decade resistance box, Dead weight tester.
Pressure calibrator:-Fluke, Ametek, Druck, Rostor.
Loop calibrator:-Fluke, Rosemount.
Communicator:-275/375.
„« Instrument Handled
Level >Level TX, Level switch, Level gauge.
Pressure>Pressure Tx, Pressure Switch, Pressure gauge, DP TX and Dp gauge.
Temperature> Temp.Tx, Temp gauge, Temp switch, RTD
Flow>Flow TX, flow switch, Flow meter-Vortex, Electromagnetic, Turbine, BS&W, MFM.
RTU>V-Monitor, Hydrill.
Fire Gas system>H2s detector, heat detector, UV detector, BGU, Ultrasonic leak detector, Smoke detector, Uv/Ir detector.
C.V, ESDV, Limit switch, Vibration, Key phasor, vibrometer, and proximity sensor of different make/model
Personal Profile:
Martial status: Married.
Nationality: Indian.
View contact information... |