Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #82818 next resume »»
CONTACT INFORMATION:
View contact information...

November 2007 – Present
J.Ray.McDermott, Batam Fabrication Yard
Offshore Deck & Jacket Fabrication.
Project: North Belut Deck & Jacket Fabrication, Su Tu Vang Deck & Living
Quarter Deck Fabrication, Skid Way & Bulk Head, Arthit Deck Fabrication

Shop Engineering & Project Engineer for Bulkhead & Skidway ramp
Responsibilities:
- Part integrity fabrication before stacking up.
- Customer satisfaction to their target project productivity
- Small unit fabrication module fabrication lead
- Prepare the skid for Deck building
- Preparing foundation / Skid for Jacket & Deck Building
- Preparing Lifting up, Jacking up & Load up for Jacket & Deck Building

September 2006 – October 2007
PT. Rekayasa Engineering
Project: Construction Engineering Task Force in PT.Badak LNG, Bontang, East Kalimantan
Engineering Section in Project Department.

Civil Engineering & Construction
Responsibilities:
- Design calculation for Buildings, Pipe Rack, Pipe Stanchion, Pipe sleeper, Miscellaneous Equipment foundations, Jetty, Retaining wall, Slope stability, Concrete structure reservoir, Erosion control, Roads, Drainage and Infrastructure
- Engineering package for bid process
- Field Engineering Design, Front End Engineering Design for Construction
- Engineering design & review details to increase the ease of construction / installation and maintain drawing register controls for the project.
- Prepare technical documentation for tender process and assist the procurement department in the technical evaluations. Set and control bill of quantities and cost estimate (including supplies and construction execution plan / installation method).

August 2006 – March 2005
PT. Radiant Hypar Engineering, Bontang Site, Indonesia
Project: Security Master Plant, PT. Badak LNG, Bontang, East Kalimantan
An Engineering Procurement Contractor project for gas Plant. This Project were to make secure of all activities of LPG & LNG processes in Zone 1 (Critical & Restricted area) from all kind of human intrusion and sabotage disturb. New roads, building, mechanical instrument & electronic equipment also add in this project, costly almost 120 Billion Rupiah.

Site Manager
Responsibilities:
- Technical and commercial proposal management supervision
- Construction management and supervision
- Preparing project execution plan
- Check list Drawing Planning Construction in field
- Evaluating and expediting subcontractor's proposal
- Arranging material and finish good stability parameter and schedule
- Site execution leader & coordinator
- Check review technical specification submitted by owner
- Check and review design to site execution job
- Solving technical problems in wells
- Value engineering prior to budget and cost efficiency supervision
- Promotes safety awareness and environmental consciousness and complies with all applicable safety and environmental procedures and regulations, etc.

February 2005 – March 2003
PT. Radiant Hypar Engineering, Pertamina Cilacap Refinery Site, Indonesia
Project: LPG & Sulphur Recovery Plant
An Engineering Procurement Contractor project for refinery. Is the project where the crude oil will be processed within the existing plant then transferred to this new project, and separate the LPG and the sulphur trough an equipment (Merox=Mercaptans Oxidations). This project was US$ 22 Million and joint operation with Siemen Engineering

Site Civil/Structure Engineering
Responsibilities:
- Civil Field Engineering Design when field design change to considering optimum inter-discipline impact
- Design calculation for Pipe Rack, Pipe stanchion and Pipe Sleeper.
- Design calculation for Retaining wall, slope stability and erosion control.
- Design calculation for Buildings and shelter.
- Design calculation for Roads (Rigid and Flexible pavement) also drainages.
- Design calculation for miscellaneous Equipment foundations
- Design calculation Road and Drainage.
- Supervising execute & Supporting Construction as follow as design
- Coordination with related other discipline (Piping, Machinery, Electrical, Instrument, Static, etc.)
- Compiling Data, Reporting & Coordination with Engineering team project to make decision / justification to solve engineering problem at site
- Review Shop Drawing (submitted by Pertamina)
- Review (review, clarification / witness, approval) Material (submitted by Sub Contractor)
- Technical clarification with Client, Vendor / Sub Contractor, Monitoring Civil - Document / Drawing status & Expediting to Client for review / approval
- Issue Field Engineering Changed Sheet

February 2003 – May 2002
PT.Bangun Cipta Kontraktor
Project: Jetty 16000 DWT for Semen Bossowa Maros
Jetty port for Extension Cement Bossowa site Fabric in Batam island. Concrete Construction with Steel pipe pile foundation with hydro drill barge method & bulking instrument with pipe stanchion line from Portland milling

Site Civil/Structure Engineer
Responsibilities:
- Design calculation of Jetty which consist of concrete structure supported by Pre-stress Concrete (PC) piles for 16000 DWT of ship.
- To provide technical advised to all civil engineers about designation of Marine Construction & Buildings in associated to all discipline engineers
- To provide technical advised to all civil engineers about designation of all other above equipments in associated to all discipline engineers
- Check and review design to site execution job
- to make develop and improvement the planning, scheduling & estimating of the site execution
- Preparing project execution plan considering with marine construction & weather condition
- Preparing planning of manpower, equipment, & efficiency work method
- Identify, develop, implement & monitor improvement program & initiatives for the all activities in area of responsibility

April 2002 – February 2001
PT. Subur Aneka Sarana, Batam Island, Indonesia
Project: Orchid Bussiness Center, Shop houses & Workshop. Is the one of the most bigger trade center in Batam island, and blocking area system management for trading activity.

Site Manager
Responsibilities:
- Site inspection and coordination
- Preparing project execution plan & supervision concept
- Arranging material and finish good stability parameter and schedule
- Calculation of building materials, equipments and man powers
- Monitoring of activity in site, planning, scheduling & estimating to considering optimum cost impact
- Reporting progress to owner
- Monitoring all sub contractor work
- Check list Design Drawing Planning Construction in field

January 2001 – February 2000
PT. Swadaya Graha, Gresik, Indonesia
Project: Extension Factory Eternit Gresik, East Java
Branch factory of Cement Gresik, to produce roofing material (Eternit), This factory has a system which the remainder from incendiarism lime cement to use for main material. Those materials have to impression and pressing system

Site Engineer
Responsibilities:
- Check & Review Detail design Engineering for Industrial Engineering considering optimum inter-discipline impact
- Preparing work method considering minimum cost impact & efficiency
- Team leader & site coordination
- Check and approval test and commissioning of contractor
- Control schedule and man power of contractor
- Review Shop Drawing (submitted by Sub Contractor)
- Review (review, clarification / witness, approval) Material (submitted by Sub Contractor)
- Design calculation for building include concrete / steel structure.
- Design Architectural and material specification includes Roof, Ceiling, wall, floor, exterior, and other facilities

January 2000 – February 1999
Indonesia Transportation Department with PT. Nada Construction
Project: Runway construction & Paved Shoulder Phase II Adisumarmo Airport Surakarta
This project to achieve additional long & broaden for runway, In order that runway can be serve the plane that most bigger before. With the Spider Net (jarring laba-laba) concrete & soil stabilization method, because the soil existing is trace of swamp soil.

Site Engineer.
Responsibilities:
- Check & Review Detail design Engineering for Runway construction, include the soil stability
- Civil Field Engineering Design when field design change to considering optimum inter-discipline impact
- Check & review calculation design of final Engineering
- Check list Drawing Planning Construction in field
- Compiling Data, Reporting & Coordination with Civil Engineering Head Office Project to make decision / justification to solve engineering problem at site
- Review Shop Drawing (submitted by Sub Contractor)
- Review (review, clarification / witness, approval) Material (submitted by Sub Contractor)
- Technical clarification with Client, Vendor / Sub Contractor, third party
- Monitoring Civil - Document / Drawing status & Expediting to Client for review / approval
- Issue Field Changed Sheet

January 1999 –September 1997
PT. Asia Makmur Ampel. Solo, Indonesia
Project: Ground Reservoir 4000 m3 & Pipelines for Drinking Water
This project is use to catch the water from spring water before going in to purifier process. With concrete construction half ground & pipe stanchion & pipe sliver dia 20", include the valve instruments system.

Site Manager
Responsibilities:
- Develop optimum plan & actual execution integrating related regulation, standards, and codes including safety, constructability, operability, and maintainability to considering optimum cost impact
- Calculation of material, man power & equipment
- Preparing & review schedule of project, and execution plan
- Monitoring material and equipment
- Reporting progress to owner
- Preparing project execution plan, manpower, equipment, work method comparing with the plan progress

August 1997 – December 1996
PT. Duta Graha Indah, Jakarta, Indonesia
Project: Mega ITC, Cempaka Mas./Y.276
Is the big modern market combining with hotel & modern parking areas. 8 floor, 3 floor in the bottom of ground level.
Structure Supervisor
Responsibilities:
- Check and review additional work was submitted by contractor
- Preparing project execution plan.
- Check & review Drawing Planning Construction & execute in field
- Approval the work was submitted by contractor
- Approval the material and schedule was submitted by contractor
- Check and approval test and commissioning of contractor
- Control schedule and man power of contractor

November 1996 - October 1995
PT. Wahyu Nugraha, Semarang, Indonesia
Project: Road Overlay, for Jl. Barito, Semarang
An Procurement Construction Company who execute for the local governance projects. Road overlay for the 20 km asphalt road, including the facilities. New road construction with flexible & Rigid pavement method, sign lamp, street lamp, drainage, box culvert, bridge, walk way, road median & road marking.
Management Project Control
Responsibilities:
- Controlling of man power & material schedule compare with planning schedule
- Monitoring of actual site even activity progress in site
- Reporting progress to management
- Internal meeting & Coordination Civil Engineering & other discipline
- Review Vendor Data Sheet
- Review Existing Data / Document / Drawing from Client
- Prepare Requisition
- Prepare / Calculation MTO

View contact information...
«« previous resume next resume »»
Search Results (Resumes 7651 to 7700 of 10903)Go to Search Parameters...
Brief Description
Objective: It is my objective to become a contributing member of your company and further my knowledge and become a great asset to your company. I have experience with people and different countries and Cultures and plan on furthering my knowledge and skills with your company.
Process Engineer with 6 years professional engineering experience in offshore oil&gas industry on fixed & floating installations and gas terminals. Experience covers Conceptual and detailed design of equipment, debottlenecking studies, process simulation, plant modifications & Flow Assurance
Helicopter view, fast analysing, creative in finding solutions, mind setter for safety
LARGE AND STRATEGIC PROJECTS MANAGEMENT - BUSINESS AND OPERATIONS MANAGEMENT
Mechanical Engineer,masters in Engineering Design,CATIA V5,SOLIDWORKS
Qualification: Diploma In Civil Engineering(3Years), Over 11 years experience in Land surveying, the majority of which has been spent gaining experience of Surveying works using modern surveying equipments and Surveying software.
B-GAS LEVEL II PAINTING INSPECTOR.MORE THEN 15 YEAR EXPERIENCE IN INSPECTION FIELD.
2D and 3D cad applications - upstream and downstream experience
12 Years experience in civil engineering, design, procurement, construction & supervising of particular relevance to the project are as follows :
10 Year Experience, 5 years Implementing SAP FI/CO and BW / BI / Netweaver Solutions for Banking, Manufacturing, Sea port industry, Maintaining SAP BW Solution for Oil and Gas Industry
Heavy Equipment Operator to include Mobil Cranes, Crawler Cranes, Overhead Cranes, Forklifts, and Tractor/Trailer
Quality control, Inspection, Installation/erection of pipes and piping components, HVAc, HSE, Computer literate
DCS and instruments el.engineer.International experience.Experience in Chemical,mainly in Pulp and Paper (equipment-similar to used in Oil&Gas,Cement,Fertilizers,etc)Industry
My skill set includes Embedded systems,RTOS,vxworks,microcontrollers,embedded linux,device driver development(Block and Non Block),I2C,SPI,En50221,IEC,CAN,SAE J1939,Modbus,Canalyser,CAPLE scripts,embedded linux(2.6 kernel),MicroC OS,windows mobile os(WM6.1)
I have extensive experience in coal analysis, material distribution systems, combustion systems, power generation and all associated chemical processes
Mechanical Engineer with expereince in AutoCAD 2000, Piping, Welding, Installation and Erection Works, Production Plainning, Supervision
6 years experiance in Air seapration Plant
Mapping Specialist
B.Tech in Electronics & Instrumentation, working on under water hydrographic equipments
Looking for a MWD career
Skills: Tally, Daceasy, ATG (KSA), Digitek (KSA), Windows / MS Office & Tools etc.
Management skills & can drive a forklift
Handling of Benzene,O-xylene,Ethylene,Panel operation (SCADA),Jetty operation and ship Unloading
Scheduler, Primavera P3E & Expedition
Land surveying relating to boundaries, design, construction, and mapping.
Jouryneyman Millwright - Alignment Specialist - Lazer, Reverse and Rim& Face. I have installed and rebuilt steam and gas turbines, crushers,conveyors, ball and sag mills, tower mills, pumps, compressors, blowers.
I am a BS Mechanical Engineer who had served primarily as a Senior Fire Protection-Applications and Design Engineer for around 17 years plus and 5 years as an Occupational, Health and Safety practitioner in a petrochemical industry with a primary function as Fire Safety Engineer. My specialty profe
Business planning, estimating, planning and scheduling, cost control and reporting, contract management, earned value, productivity monitoring, claims disputes and resolution, lean construction, high level presentations, multi tasking, meeting deadlines, and creating win-win situations.
Diploma in Chemical Technology working with BJ process and pipe line services as an operator having precommissioning and commissioning exp
Documents Controllers / Project Administrator
I have completd my Master's Degree in june 2005, previously I had B.com Degre, I am fully knowledged about the administrative techniques
Computers, customer/technical support, java, php, internet, web-design
A metallurgy n materials engineer with 3.5 years of experience in the field of Metallurgy, QA, Heat Treatment and Inspection & Testing. Worked with various international standards viz. ASTM, ASME, NACE, EN ISO and DIN, also well versed with customer specific standards like Aramco, Shell MESC etc.
Testing, Maintenance and Troubleshoot of Electrical,I.T.I in an Electrician
I have sound knowledge and hands-on experience in Pipe Inspection and Standard gauging practices. OCTG's, pup-joints, couplings, cross-overs and making-up of connection ends is my specialty. I will always deliver anytime and anywhere i am called upon and always keep abreast with latest technologies.
20 years of experience (Eight year in Gulf) in varied discipline of Engineering i.e. Quality Control and Assurance, Inspection and Expediting, Piping Specification, Material Handling equipments & system specification, Shutdown maintenance Inspection, Construction Site Inspection(Piping,PV)
Over Three & half years experience in System Administration, Network Administration & System Management in Multinational Software Company & Industry. Good interpersonal skills, ability to work well and hard with multidisciplinary teams, got maximum exposure in MS Windows Systems Administration
Have 10 years experience in oil and gas / petro chemical process area, Hydrotreaters, Delayed cokers, Vacuum distillations, Frac. towers, Strippers vessels, etc.
Like learning something new. Almost 4 years experience in oil&gas and pharmaceuthical device company. Familiar with standards API, GPSA, ASME, NFPA, and program Hysys, Pipesim, Pipephase, Chemcad, Flaresim.
BS of Petroleum Engineer, with a Waterflooding Postgraduate of 2 years, I work with Ecplise and Grid, I made my own project by my own.
Mechanic, mechanical fitter, maintenance, vehicle mechanic, heavy mechanic, diesel mechanic
Chemist (BSc.) Analyst with a broad technical knowledge combined with outstanding leadership ability and creative problem solving skills in both strategic and tactic areas
My Graduation (B.Sc.) is in Mathematics and post graduation(M.Sc.) is in Oceanography. I have one year expereince in the field of Oceanographic research. Also I have cruise expereince of more than one month. I have basic skills in data processing and anlysis, Fortran Programming and other graphics .
Programmer
Fully qualified Project Manager for International Engineering projects
I am piping engineer having experience of three and half years. I have done piping stress analysisin CAESAR II software. I also have 3-D modelling exposure.
B.SC.Mech.Eng., Welding Eng., Project Manager
Skilled MSc ME, specialization Control Systems and Mechatronics
Proven track record of ten years in Senior Management pertaining to broad base Logistical Support, Marine Control, Supply Chain Management, Procurement, and Warehousing fields I have met exacting deadlines of delivery ensuring continuum of multi-million contracts.
1 year experience in CAD package - Unigraphics NX at General Motors.
First   Prev   151   152   153   [ 154 ]   155   156   157   158   159   160   161   162   163   164   165   166   167   168   169   170   171   172   173   174   175   176   177   178   179   180   181   182   183   184   185   186   187   188   189   190   191   192   193   194   195   196   197   198   199   200   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com