Oct. 08 to Present Washington Division URS, Houston, Texas 77042
Working as a Supervising Discipline Engineer on project for Chevron to develop the Piceance basin in Colorado to produce gas from on shore wells. The project involves routing gas from wells to well pad where gas is processed before being piped to a central processing facility for separation, drying and then compressed to ship to customers via pipe lines. I have a team of engineers and designers to help me with the instrumentation, controls and communication part of the project.
The group is responsible for selecting, sizing and specifying field instrumentation, control room hardware which consists of Allen Bradley, Programmable Logic Controllers (PLC) and communication hardware consisting of media converters, fiber optic patch panels, Ethernet switches, repeaters and panels.
We are generating documentation for field construction such as loop drawings, wiring diagrams, location plans, cable schedules, logic diagrams, updating P&ID's and writing controls narrative to facilitate programming of PLC.
I am providing technical consultancy, client coordination, meeting with vendors, progress reporting to management to ensure project is within budget and on schedule.
March 2006 to Oct. 2008 S&B Engineers, Houston, Texas 77087
Worked as the lead engineer on Chemical and Petro-Chem projects.
My last assignment was to lead a team of engineers to provide detailed design on a refinery expansion for Shell Motiva in their facility at Port Arthur, Texas. I am responsible for all Instrument and electrical work for the Sulfur block consisting of 3 Sulfur Recovery Units, 3 Tail Gas Units, 2 Amines recovery units, 2 Sour Water Stripping Units, loading facility and a Tank Farm unit.
Finished detail design engineering package on a marine vapor recovery project for Citgo refinery in Corpus Christi
I also did the front end loading (FEL) work on a $100 m Tail gas unit for Citgo refinery in Lemont, Illinois.
Prior to above assignment I did instrumentation and electrical work on a boiler feed water upgrade for a local plant in Houston.
I also wrote specifications for analyzer house with chromatographs for a chemical plant in Hobbs, New Mexico.
Mar. 2000 – Mar. 2006 CDI Engineering and Kelly Technical, Houston, Texas
Assigned to Dow Chemical plant in Texas City, Texas. I worked as a Senior Process Automation Engineer. I worked working with control room instrumentation primarily Honeywell TDC-3000 control system, Triconex safety shutdown systems, I am responsible for all phases of the project from project definition to final commissioning and start up.
Prior to Texas City assignment, I was at Bayer plant site in Baytown, Texas working as a senior PCS Engineer to handle Instrumentation, Analyzer and Electrical projects. I worked on several projects in units namely TDI, Coatings, Polycarbonate and Bisphenol (BPA). I was responsible for the execution of projects from conception to start up.
This included cost estimates, selection, sizing and specifying field and control room instrumentation (Fisher "Provox" and Siemens Moore "APACS" system), Safety-Instrumented system (Siemens Moore "Quadlog" system), Analyzers for gas monitoring (Phosgene, CO and Chlorine), waste water-monitoring system, (CEMS) analyzers.
Mar. 1990 – Feb.2000 Senior Instrumentation / Electrical Engineer
Wynn Corporation & Chem-Kon Engineering Svcs,
Houston, Texas
Assigned to Lyondell Chemical Co. (formerly ARCO Chemical Co.) in Bayport, Texas to work on an instrument retrofit project to change existing pneumatic controls on a propylene oxide unit to a Honeywell "TDC-3000" DCS control system and also utilized a "Triconex" TMR system for emergency shutdown system. I worked thru the completion of the project; I was the primary liaison between the owner and contract engineering firm. I was involved with the detailed design at the contractor's facility that included review and approval of engineering drawings, configuration and data base development and factory acceptance test. This was followed with construction, commissioning and hot cut over activity at the site.
For small capital and expense plant projects I was directly responsible for sizing, specification, selection and recommendation of field instrumentation, control valves, relief valves and process analyzers.
Jul. 1988 – Mar. 1990 Senior Instrumentation / Electrical Engineer
Project Associates, Friendswood, Texas
I was assigned to Hoechst Celanese, Clear Lake plant in Bayport, Texas. I handled wide variety of Instrumentation projects in Esters and Ethyl Acrylate units. I worked directly with the design group and provided review and coordination of P&ID's, detail design, generating instrument specifications, control system hardware selection, provided assistance during commissioning and start up phase of the projects.
Mar. 1978 – Jul. 1988 Senior Staff Specialist Control System
CDI / Stubbs Overbeck & Associates, Houston, Texas
I worked on several electrical and instrumentation projects for refineries and chemical plants. Clients included Union Carbide, Texaco, Arco, Goodyear, Monsanto and Ashland Chemical. Worked with all facets of instrumentation and typical responsibilities included project cost estimates, selection, sizing and specification of field and control room instrumentation with special emphasis on distributed control systems namely Honeywell "TDC-3000" and Fisher "Provox" systems. Provided controls for boilers, distillation columns and general process equipment.
Worked on Ethylene unit, Hydrocracker, Sulfur Recovery unit, Ethanol and Carbon Black plants.
Jun. 1977 – Mar. 1978 Electrical Project Engineer
Dynamic Engineers, Joliet, Illinois
I was contacted by my previous employer who had landed another project with the General Foods, Maxwell House coffee plant in Houston. Having enjoyed my previous assignment I accepted a position with the company again and worked on project to install a dual fuel system (oil / gas) for equipment such as heaters, dryers, roasters etc, I was supervising a team of designers and draftsmen to generate an engineering package. My responsibility was to provide client liaison, do field survey, checking and approving design drawings. My other activity with this assignment was to work as a business development manager to generate engineering work for the company to establish a local office in Houston.
Mar. 1975 – Jun. 1977 Associate Design Engineer
Dow Chemical Company
My first assignment was to work on a poly ethylene plant in Colombia, SA. I handled the electrical work and stayed on the project until the construction package was issued. On the project, I did design work on 13.8/4.16 KV substation and 13.8/0.48 KV distribution transformer substation, plant grounding system, underground feeder system, motor controls & lighting, cable schedule, schematics drawings, instrumentation and communication system.
I also worked on a Vinyl Chloride facility in Fort Saskatchewan, Canada.
On this project I provided I designed electrical facility, switch gear building, handled power distribution, lighting, instrumentation wiring diagram for Fisher AC2 line of analog instruments and interfacing with EMC Controls computer.
Oct. 1973 – Feb. 1975 Electrical Engineer
Dynamic Engineers, Joliet, Illinois
I worked at the General Foods, Maxwell House coffee plant in Houston on a Sanka expansion project. This assignment included designing a 40 feet long graphic control to monitor and control process. I was developing elementary diagrams from process flow sheets, single line diagrams, plan drawings for power distribution and lighting. I stayed on the project during construction phase and later provided assistance during start up and finally got the drawings updated to "As Built status" before issuing them to the customer.
Honorable Activities & Training
Registered Engineer, Texas # 42193, Past President ISA Clear Lake / Galveston chapter. Presented papers at "JAIPCC" symposium at University of Houston and at "IMEKO" world congress meeting in Prague, Czechoslovakia. Honeywell TDC-3000 school, NEC training, Fisher, Samson and Valtek valve sizing training seminar, Fisher "Provox", Unit Operation Controller school. Numerous training sessions, courses and seminars to upgrade technical skills.
References:
Will be provided
View contact information... |