Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83135
next resume »»
CONTACT INFORMATION:
View contact information...
Marital Status: Single
Nationality: Nigerian
Date of Birth: 8th April 1979
Diving Licence: - Full UK Licence
WORK EXPERIENCE
1. October 2008 – January 2009. Gleeds Management and Construction Consultancy Tunbridge Wells Kent UK.
Position: Quantity Surveyor
* I assisted in managing costs on a wide variety of new building projects and structures, such as residential developments, schools, offices and factories.
* Responsible for undertaking costs analysis for repairs and maintenance of projects
* Actively involved in carrying out feasibility studies, risk and value management, cost control, tenders and contract documentation.
* Identified, analysed, and developed responses to commercial risks
* In charge of writing progress reports, evaluation of completed works, arranging for payments while ensuring that health and Safety regulations are met at all times.
2. June 2008 – September 2008 GLEEDS (PFI/PPP sector Gleeds Management Services Limited) London UK
Position: Project Manager
* I functioned as a Project Manager within GLEEDS PFI department over a four month period during which I worked with a team of three Project Managers on the 'Building School for the Future' scheme for Kent County Council in Maidstone (KCC),
* I was responsible for managing area data sheets of the drawings, room data sheets, ICT part and LCT
* I liaised with sub-contractors on behalf of KCC to ensure accurate drawings, schedules, tools, as well as Health and Safety issues are properly designed and carefully followed.
3. January 2006 – July 2008 Gleeds Management and Construction Consultancy Tunbridge Wells Kent UK.
Position: Quantity Surveyor
* Assisted in establishing client's requirements while undertaking feasibility studies of projects
* Prepared early stage budgets and detailed cost plans while performing risk and value management
* Advised my employer on various procurement strategies and ensured proper communication is achieved with the procurement department when requesting quotes
* Prepared tender and contracts documents including bill of quantities. I also ensured cost control processes where in place before, during, and after all projects
* Tasked with preparing cost plans for tender
* Actively involved in the establishment of financial control systems
* Excellent working within allocated budgets and still achieving expected results.
* Proficient in providing advice on contractual claims and variations
* Developed skills in problem analysis and report writing
* I have been involved in tendering and valuation of local contracts on different projects
* I have carried out extensive work on major projects in new buildings and fit outs in London and South East England. These ranged from £2million - £18million.
* I was tasked with the pre-qualification of suppliers, the creation of bidder's lists and the preparation of contractual terms and conditions in the preparation of tender documents.
4. Oct. 2000 – Aug. 2005 Lexibus Engineering Group, Rivers State, Nigeria.
Position: Project Manager
* Actively involved in Residential and Commercial land development projects.
* I designed the schematics for a Storm water project which involved dividing the storm water shed areas, calculation of maximum and minimum flow rate, determination of the storm drain pipe sizes and slopes, surface water drainage slopes as well as determining locations of the storm drainage inlets.
* Street design: determined elevations of centreline curb & gutter and back of walkway; designed gutter slopes to ensure storm water flow. Sewer and waterline design: determined locations, slopes and connections; decided fire hydrant and manhole locations. Street lights location and design.
* I worked with a team of Contract Administrators in the preparation of Contract Documents for an upcoming major phosphate production project in Port Harcourt.
* I was tasked with the preparation of an Environmental Impact Report (EIR), construction of water pipeline, pumping station, treatment plant, and various ancillary buildings and facilities Improvement and plan checking for various Public Agencies.
5. Jan. 2000 – Aug. 2005 Lexibus Petroleum Services Limited, Port Harcourt, Rivers State, Nigeria.
Position: Offshore Project Surveyor
* Responsible for Barge move survey support services for (OCIP project), ExxonMobil (Nig.) Unlimited.
* Survey support for Pipe Trenching project (BTIP) for Shell Petr. Dev. Company (SPDC) East, Nig
* Involved in creating survey support for underwater Pipeline inspection Services for ExxonMobil
* In charge of site survey operations for Chevron Texaco (Nig) Ltd.
* Involved in survey support for soil sampling operation for ExxonMobill Producing Unlimited.
* Provide Pipelying survey operational support for Chevron Texaco (Nig) Ltd.
* Responsible for all 8" Pipe Field Maintenance Services FMS for ExxonMobill Producing Unlimited.
* Supervised the construction of Phase II Gas Turbine (SCPP) at SPDC Industrial Area.
Setting out of drainage pattern
Cable route setting out operation
Levelling operations within the facility
Turbine engines and panels Installation task
Setting out of foundations and retaining walls
* Managed Computations and Map making using MicroStation software (CADD)
* Lead process piping and plant layout designer / 3D cad modeler/piping checker/Drafting QA/QC
* SHELL FORCADOS YOKRI INTEGRATED PROJECT (Onshore and Offshore interphase). Nigeria
* SHELL UTAPATE FIELD DEVELOPMENT PROJECT. (Subsea pipeline study/drawings) Nigeria
* SHELL KOLO CREEK RUMUEKPE PIPELINE 20" x 33 Km. (River and roads crossings) Nigeria
* Preparation of PDFs, P&IDs (PEFS/UEFS)
* Preparation of 3D plant and piping model to issue plot plans and equipment layouts
* Piping General Arrangements. Including piping and equipment sections and piping details.
* Piping isometrics and BOMs annotations and generation. Piping spooling for fabrication.
Piping design for turbine and compressors including structural steel supports.
* Provide 3D models, sketches and drawings to assist the skids manufacturers with fabrication.
* Lead trainer for 20+ local Nigerian drafters and 6 local Nigerian piping designers with 3D Rebis software.
* Lead designer for the preparation of Technical Tenders. Inspection of the Plant, Piping, Structural, Equipment of facilities and projects such as:
EIU SHE Revamp project.
ExxonMobil (5 offshore platforms) Nigeria
Bonny flow station project.
Shell SPDC (30,000 bbl/day flow station) Nigeria
Cawthorne Channel Project.
Shell SPDC (5 flow stations and utilities) Nigeria
Idu Field Gas Recovery and Plant Revamping.
NAOC Agip (flow station, pipeline and utilities) Nigeria
* Involved in Pipeline Routing 12" MP Between Bagi To Ibewa Alinmen for Elf (Nig) Ltd
* Responsible for As-Built Survey of 30MW Gas Turbine Facilities.
* Detail of Ibewa Production Centre for Elf (Nig) Ltd
* Supervised the pipeline Route 12" HP from Bagi to Obite Alignment (Part 1& 2)
* PI/FP Survey of SPDC SCPP (Gas Turbine 3) Site (SPDC)
* Plan and Profile of Pipeline for NAF Base Refuelling Facilities for Aero Contractor (Nig) Ltd.
* Involved in the Construction/Burial of 2" PVC Water-Pipeline for SPDC.
6. Dec. 1998 – Jan. 2000 Niger Delta River Basin Development Authority (NDBDA) Rivers State, Nigeria.
Position: Project Planner
* I was in a team of professionals in the delivery of a feasibility study in the regeneration of Port Harcourt town. This included the design, drafting and processing of full set of plans for two 36-inch diameter potable waterline projects.
* I was responsible for the preparation of Engineer's Cost Estimate, Technical Specification, Bid Documents and Storm Water Pollution Prevention Plan (SWPPP).
* Reviewed civil plans outlined for the project execution.
* Applied all the instructions and specifications stipulated for the project execution in order to take advantage of available resources allocated.
* Reported on a weekly basis, civil works progress and on site tests on a monthly basis to be addressed in the staff meetings.
* Coordinated the civil works scheduled for each week.
* Verify incoming supplies allocated to the project ensuring the quality standards.
* Civil work output analysis.
* Evaluated the personnel under my supervision.
* Monitored civil works accomplished on a regular basis according to closing dates for each work site of the project.
* Coordinated maintenance activities and routines related to equipment used.
* Recorded all information as detailed as possible related to asphalt mixture controls and pre-mixed concrete placements.
* Verified the compliance of quality standards and procedures for activity releases with respect to each of the work sites of the project.
* Carried out the daily schedule related to concrete demand to accomplish weekly project targets.
* Supervised the administrative personnel appointed to the project.
* Civil project reporting with respect to civil scheduling, materials allocated, supplier's performance and work progress ensuring the compliance of quality standards.
7. April. 1997 – Dec. 1998 Eko International Bank (Building and Engineering Department) Lagos, Nigeria.
Position: Building Engineer
* Managed, directed and administered the international sales effort for a large national plumbing and waterworks supply company which included sales and invoicing, purchasing, inventory management and administration, letters of credit negotiation.
* I opened new markets and negotiated exclusive agreements with sub contractors and suppliers. I was solely responsible for managing the site activities to fulfil the project target with ensuring that all installations are according to standards and specifications.
* I was involved in monitoring and supervising of onsite works including labour force and subcontractors.
* Ensured accurate drawings and quantities of material are on hand and carefully followed to maintain standards and achieve target. I was also responsible for the daily preparation and update of site progress reports.
* I openly communicated with other departments for any variations or modifications of works which led to other additional responsibilities as a QS Engineer.
* I designed and processed full sets of plans of 60% and 90% submittals for a Traffic Calming Project. I effectively managed the role of a Construction Manager for a Street Improvement Project and got involved in preparing Engineer's Cost Estimates, Technical Specifications and Bid Documents.
8. Nov. 1996 – April. 1997 H F P Nig Ltd Civil and Building Engineering Contractors Lagos, Nigeria.
Position: Trainee Quantity Surveyor
* I was directly responsible for all aspects of supply and delivery on site, a case in point was the supply of 200KM of Medium voltage transmission line, this included electric poles, cables, hardware and accessories.
* I was solely responsible for supply and delivery logistics, this role involved the coordination of suppliers, plant inspections, ship chartering, loading and off loading responsibility, the hiring of cranes, trucks and barges for the movement of equipment to various locations. I ensured all equipments and tools required were delivered on time and within budget, which positively affected the overall project completion timescale.
SCHOOLS ATTENDED
1. 2005-2006 MSc Project Management for Construction, University Of Brighton, Brighton UK. Accredited by the Chartered Institute of Building (CIOB) & Royal Institute of Charted Surveyors (RICS). Emphasis on human resources management, construction law, contract procedures, construction technology, procurement method, cost and financial analysis, benchmarking in construction Introduction to project management techniques in construction, including organizational structures for project delivery, construction contracts and documents, cost estimating and bidding planning and scheduling, cash flow analysis, project tracking and control, introduction to construction processes: excavation and site works, foundation layout, concrete form design, concrete, steel, timber, and masonry construction; project planning, scheduling, and control; construction safety.
2. 1999-2004 BEng (Hons) Civil Engineering, Federal University of Technology Minna, Niger State. Accredited by the Nigeria Institute of Engineers.
3. 1995-1997 OND Building and Quantity Surveying, Federal Polytechnic Ado-Ekiti, Ekiti State. Accredited by the Nigeria Institute of Building (NIOB) & Nigeria Institute of Quantity Surveying (NIQS).
PROFESSIONAL MEMBERSHIPS
* Charted Institute of Building (CIOB) United Kingdom.
* Association of Project Management (APM) United Kingdom.
* Royal Institute of Charted Surveyors (RICS) United Kingdom.
* Institution of Civil Engineers (ICE) United Kingdom.
SPECIALISMS SKILLS
Benchmarking, Cost Management, Life Cycle Costing, Project Management, Risk Management, Value Engineering
COMPUTER SKILLS
Auto CAD, Arch CAD, Pertmaster, Primavera, Prince2, SAP, MS Office and MS Projects
HOBBIES
Tennis, Foot Ball, Swimming, Travelling & Listening to Music.
REFERENCES
Will be provided on request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 5701 to 5750 of 10926)
Go to Search Parameters...
Brief Description
Good team player, ability to work with minimal supervision and to contribute optimally to the achievement of the organization's goals
REsume for Petrophysics or Geoscience Tech
Survey Engineer 10 Years Experience in Land Surevy
Registered Professional Engineer with more than six years of work experience in the areas of Field Engineering, and Construction Management.
Foreman on Oil Jobs
I have been employed by Drilling & Workover organization in Saudi Aramco as a contractor of a service company from July, 1997. As a Materials Coordinator/Expeditor and Project Coordinator include my responsibilities assisting material Advisors at Material Acquisition and Forecasting Unit; coordinat
Pre-commissioning Engineer
Graduate engineer with specialization in metallurgical engineering and professional experience as welding engineer in the fabrication field for the past 10+ years. CEng MIOMMM MWeldI, ASQ-CQE, API 510 pressure vessel inpsector, CSWIP Senior Inspector
Senior level position with EPC company executing large scale infrastructure and industrial projects, where a strong background in contracts, project controls, engineering, and effective communication skills, and a complete knowledge of project management can be used to improve project
application for the post of safety engineer/ safety officer having an experience of 6 years and 7 months of which 2years and 7 months in kuwait approved as a safety officer from koc kuwait and approved as a safety supervisor from knpc kuwait
I am post graduated from I.I.T roorkee and have 3 yr experience in oil and gas consultancy(offshore) after post graduation. I have sound knowledge of SACS, STAAD softwares
Lead Quality Engineer / Inspection Engineer / Welding Engineer
I am a Chemistry graduate having fifteen years experience from petorchemical and ammonia plants. At present I am working as a shift chemist in Saudi International Petrochemical Company. Previously I was worked in Madras Fertilizers Ltd as Senior Lab Analyst. Kindly consider my resume.
I'm an ambitious self-motivated professional,I'm well motivated, I've got a strong desire to succeed, and I'm always ready and willing to learn new information and skills.
I have capitalised a good experience over the past eight years supporting the operation of a major onshore oilfield in Algeria
Overall In-Charge for all Catering Operations at the Installation, Cost & Waste Control, Menu Planning, General Housekeeping for in and out of Accommodation and living Quarters, Providing Laundry Services, Practice of Safe & Environment Garbage Disposal, Mobilizations of crew and job rotation, etc.
Logistics 10+ years experience including: Commercial (Mining) project logistics; Humanitarian aid ; and, Military. Transportation & Distribution management; Warehousing; Purchasing. Fluent in both English and French; and computer literate.
Experienced in analytical techniques in hydrology/hydrogeology. Expert in modeling of ground/surface water using a variety of software. Skilled at managing moderate teams through planning, execution and report writing. Excellent written and verbal communication skills.
Engineer PhD + 8 years experience in fluid flow and flow assurance including research and development with paraffin deposition problems. Extensive experience with modeling and analysis of multiphase flow problems.
I have over ten years in the production field and consider myself a specialist. People skills, technical skills, office skills, and supervisory skills all of which have come about through seasoned experience. What I offer your company is QUALITY!!
Sr. instrumentation engineer with 11yrs of exp in the commissioning, startup and maintenance of petrochemicals and refinery.
I am a 39 year old South African Male seeking employment in the Petrolium/Oil/Gas Field. I am a qualified Fitter & Turner with relevant experience.
8 years of experience in Project planning & Control Management, including Construction engineering, Engineering & Procurement management, Costing & budgeting, Project financial analysis, Subcontracting, billing and progress analysis. Primavera Package for Project Scheduling.
To obtain a position in the offshore oil & gas drilling industry which best utilizes my extensive mechanical skills and background while providing for career advancement. Currently residing in Fort Collins, CO, and in process of relocating to the Houston, TX, metropolitan area.
9 yrs experience in process engineering for Refinery, Natural Gas, Petrochemicals areas, worked on FED,DD projects; de-bottlenecking studies & residual engineering work. techniques of hazard analysis & HAZOP studies. used process simulation software ChemCAD 3.0, HYSIS,PipeSim & Pipephase
Working on campus at Texas A&M University–Kingsville has provided me with a variety of skills and talents. I also have an extensive knowledge of a variety of computer applications. I am always interested and open to further training & I am willing to relocate.
QC Geophysicist for 2D Seismic Reflection data acquisition. Geophysicist for data acquisition processing & interpretation of Seismic Refraction. Resistivity data acquisition processing and interpretation for water investigation Familiar with computer packages
Registered Occupational Emergency Nurse . 30 Years experience in Industrial Mining and Oil Industry Nursing. At present working as an Oil Rig Medic Nurse In Angola. Also Trained as Diagnostic Radiographer and Gold medal, Instructor in First Aid, Resuscitation and Medevac.
I AM EXPERIENCED ELEVEN YEARS IN OIL AND GAS, SR.PRODUCTION OPERATOR ONSHORE AS WELL AS OFFSHORE IN MULTI NATIONAL COMPANIES. I AM LOOKING FOR A BETTER APPORTUNITY,PRIOR FOR ME JOBS POSTING 28/28.
Extensive experience in the sales and marketing of crude oil and finished products. Worked for 4 years for an energy trading company in the USA, Votex Investments, Inc. Educational background includes a MSc in International Business from the London School of Economics.
Included in body & contact information.
hydraulic technician/fitter
32 years of international and domestic deep water, jack-up barge and land rigs,in drilling, completion and workover in field operations.
23 years of experience as a supervisor in drilling, completion and workovers on and offshore.
COMPUTER GEOLOGIST Databases, GIS & 3D Modelling Project & Quality Management
I am a female Geologist. I obtained my Msc from Oxford Brookes University, and am computer literate.
Petroleum Engineer with MBA in Finance (University of Houston). Willing to be relocated to Colombia (South America). Native Spanish Speaker.
• Management Experience and extensive knowledge of the Latin American business environment. • 5 Years Sales & Marketing Experience in South America for Mineral and Oil Exploration surveys for Aerodat Inc., (1995-97), Scintrex Ltd. (1998-99) and Fugro (2000).
I am looking for a job in the petroleum industry. I have a B.S. degree in petroleum engineering. I have over 11 years of experience and training related to petroleum engineering. Most of my experience was as a mudlogger. I am very interested in an office position relating to formation evaluation.
Objective to work as shore base support for drilling operations on land/offshore drillling units.
Looking for Field Engineering position.
My first 5 years of experience covers TURN KEY Project Management / Estimation / Execution-Supervision / Installation, Water Trials, Commissioning, Maintenance, Trouble Shooting, etc. & last 7 years in Piping Design & Eng.
I have worked on all sizes of rigs since 1983 and have gained a lot of down-hole experience in directional, horizontal and under-balance wells.
Bachelor Degree in Metallurgical and Materials Engineer in Brazil. I have 2 years experience working with quality inspection in a maintenance Company for Oil/Gas Industry, also 4 years of experience in laboratory on materials testing and characterization.
25 years experience in Planning/Project/Detailed Engineering of Oil and Gas Plants, Petroleum Refineries and Petrochemical Plants
CFD (Computational Fluid Dynamics), Multiphase/Multi-component flows, Fluid Flows, FSI (Fluid Structure Interaction), ASI (Arbitrary Sliding Interfaces), Heat Transfer, Thermal engineering, Design/development, Combustion, Chemical/Reaction Kinetics and Chemical simulation, PhD, Mechanial Engineering
Total 6½ of years experience in the field of power plant and GOC in various projects. Preparation of GA and preliminary piping layout with Design principles, creation and review of P&ID’s, Review of vendor information, review of contracts with respect to system description, highly proficient using I
Automation Engineer, I have worked in different company for electronic devices and actually in Oil and Gas field us an engineer automation for DCS and Safety syetems, for more details Plaise see my CV here.
I have first aid & WHIMIS certificates, as well as CWB tickets in SMAW 1GF, 2GF and flux core 1GF.
B.Sc Computer Sc,MBCS,MCPRN,MBA(In View), Oracle Database Admin, Microsoft Office 2003 & 2007 Suite, Unix, User, System ad Application Support, Data-Center Administration
First
Prev
101
102
103
104
105
106
107
108
109
110
111
112
113
114
[ 115 ]
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com