CONTACT INFORMATION:
View contact information...
SUMMARY OF QUALIFICATIONS:
------------
I am a drilling engineer with 20 years experience of preparing drilling wells programs.
I have very good abilities in selection of bits and drilling fluids, drilling hydraulics optimization, casing design optimization, design and supervision of casing cementing and directional drilling plans. I am proactive to know all new technologies and its applications. All these factors with the objective to perform a succesfully drilling wells. My major goal is the design and cementing liners, getting the better results of primary cementing; this is, obtain the major adherence between casing and cement and formation and cement.
------------
OBJECTIVE:
------------
I want to work in a position as a drilling engineer, where I can apply my experience and knowledge to contribute to optimization of drilling wells, to acquire new experiences in other areas on the base of a proactive attitude for the work in team, to know and to apply new concepts and technologies in drilling wells operations..
------------
WORK EXPERIENCE:
------------
Halliburton, Mexico - Villa Hermosa, Drilling Engineer, Feb 2009 - Feb 2009
Works of drilling engineering in the project Halliburton Mexico – Pemex - Alliance II in Villa Hermosa - Tabasco.
BPZ Exploracion & Produccion, Lima – Peru, Drilling Engineer, April – Dec 2007
Elaboration of drilling engineering programs of fluids, hydraulics, directional drilling, casing and cementing designs for drilling offshore wells in the block Z-1 offshore.
Pluspetrol, Andoas – Trompeteros, Night Company Man, Jan 2005 – March 2007
Supervision of drilling operations of directional wells of 3400 m in the bocks 1AB and 8.
Supervise bits and drilling hydraulics parameters, directional drilling, ran and cementing of casing and liners.
Petrobras, Talara – Peru, Drilling Engineer, Jan 2004 – Dec 2004
Programs of drilling bits, drilling fluids and hydraulics, directional drilling, casing design and casing cementing for the drilling of wells in the block 10. Technical evaluation of competitions for services of bits, drilling fluids, directional drilling and cementing. Determination of drilling costs for Budgets of Investments.
Petrobras, Talara – Perú, Drilling Engineer, Jun 2003 – Sep 2003
Elaboration of instructive procedures for planning and execution jobs in the drilling wells operations of the Program of Management Excellency in the Wells Construction of Petrobras Energy Peru for the filial companies of Petrobras Energy in South America.
Maple Gas, Pucallpa – Peru, Production Manager, June 2001 – December 2001
Management of engineering jobs and operations of petroleum production wells with mechanical pumping in Maquia and Agua Caliente fields.
Halliburton of Venezuela - West IS, Ojeda and Maracaibo – Drilling Engineer, Feb 1998 – Dec 1998
Engineering jobs for Petroleos de Venezuela in their operations of drilling oil wells of 3000 m in the Lake of Maracaibo and 3700 m in areas in earth in West.
Jobs for Pennzoil in Maracaibo. Presage of materials requirement for the Drilling Plan 1999; evaluation of proposals to hire services of casing provision, bits and mud logging.
Halliburton of Venezuela - East IS, Maturin – Drilling Engineer on Site, Sep 1997 – Jan 1998
Supervision of drilling operations of 4400 m depth wells in The Furrial area of the East Venezuela. Supervision of bits parameters and drilling hydraulics, properties control of oil base mud, type S directional drilling control, ran and cementing 9-5/8" casing and 7" liner.
Pluspetrol, Lima – Peru, Drilling Engineer, Aug 1996 – Aug 1997
Elaboration of technical bases and evaluation to hire services of drilling rig, drilling fluids and cementing.
Petroperu, Iquitos and Trompeteros – Peru, Drilling Boss Section, Oct 1986 - July 1996
Responsible engineer of programs of bits, drilling fluids and hydraulics, type S directional plan and casing design, 9-5/8" casing and 7" liner cementing jobs for the directional drilling wells of 3000 – 3800 m successfully drilled by PetroPeru in the block 8.
Evaluation of proposals to hire services of drilling rig, drilling fluids, directional drilling and cementing. Elaboration of presage of materials for Drilling Wells Annual Plan of Petroperu and technical evaluation.
PetroPeru, Iquitos – Peru, Drilling Engineer, April 1983 – Sep 1986
Elaboration of programs of bits, drilling fluids, hydraulics, type S directional drilling, casing design and casing primary cementing for drilling wells of 10000 feet in block 8. Supervision of 9-5/8" casing and 7" liner cementing jobs. Design and supervision of squeeze cementing jobs.
PetroPeru, Trompeteros – Peru, Production Supervisor, April 1982 - March 1983
Supervisor in gathering production facilities and separation equipment of oil, water and gas.
PetroPeru, Lima – Peru, Petroleum Engineer, October 1979 - March 1982
Elaboration of programs of bits, drilling fluids and 9-5/8" and 5-1/2" casing for the drilling oil and gas wells of 1500 m to 2600 m in the Petroperu's block 10.
-----------
EDUCATION & CERTIFICATION:
------------
National University of Engineering - Lima – Peru: Bachelor of Sciences in Petroleum Engineering, Oct 1981
National University of Engineering – Lima – Peru: Petroleum Engineer, Dec 1997
School of Engineers of Peru: CIP 56233 - Petroleum Engineer, May 1998
Society of Petroleum Engineers –SPE 1814987 - Petroleum Engineer, Aug 1987
English language: Intermediate level
------------
ADDITIONAL INFORMATION:
------------
Well Control – Well Control School, WellCAP – IADC, august 2006, Lima
International Well Control Forum - IWCF, Petrex, february 2005, Lima,
Prevention Attacks and Wells Control - CIED, September 1997, Venezuela
DIMS for Windows, PDVSA, September 1997, Venezuela
Modern Well Completions Practices School, Halliburton Services, July 1994, USA
Cementing Oil and Gas Wells, BJ Services, October 1993, Peru
Open and Cased Hole Electric Logs Interpretation, Schlumberger, October 1993, Peru
Cementing Advances, Halliburton Services, December 1992, Peru
Drilling Wells Hydraulics, Magcobar, April 1985, Peru
Cementing and Stimulation Wells, Dowell Schlumberger, March 1985, Argentina
Drilling Fluids, NL Career Center, November 1983, Peru
Oil Wells Logs Interpretation, Schlumberger, July 1982, Peru
------------
View contact information... |