POSITION TITLE SR. PROJECT CONTROL ENGINEER OIL & GAS
ORGANIZATION BELLELI ENERGY SRL
LOCATION SHARJAH FZE DUBAI ( UAE)
CITIZENSHIP INDIAN
CONTINUOUS SERVICE in Gulf SINCE 2002 OVERALL EXRIENCE MORE THEN 8 YEARS
PASSPORT NO. E-911---- ISSUED FROM INDIA
MARITIAL STATUS MARRIED
Technical Qualification:
Mech. Engineering: Jamia Millia Islamia New Delhi India
Major Subjects: Power Plant, Estimating Costing & Design, M/c Design, and Fluid Engg.
Management Qualification:
Pipeline Construction management (NICMAR INDIA)
SIGNIFICANT INFORMATION
LANGUAGE SKILL: ENGLISH, HINDI, URDU, PANJABI, ARABIC,
SOFTWARE SKILL: PRIMAVERA-P3, P5 ENTERPRISE, P6 PROJECT ENTERPRISE V.6.0 AND PM+
KEY TECHNICAL SKILL: PLANT PIPING, OIL STORAGE TANKS & PIPE LINES EPC PROJ.
Mission Tasks
Establish and manage effectively a planning and progress control system in order to support the Project Manager's decision-making process and allow him to complete the project according to the internal baselines and in compliance with the contractual dates and requirements. Ensure any deviation from plan is promptly spotted, analyzed, final time impact is estimated, and the effect of corrective actions taken is monitored. Create a schedule awareness atmosphere among all project participants.
PROJECTS EXPRINCE: OIL & GAS, POWER PROJECTS FUEL FARM,OIL TERMINAL BULK STORAGE TANKS, DISTRICT COOLING (CHILD WATER PIPE LINE) AIR PORT JET FUEL PIPE LINE,
COMPANY: BELLELI ENERGY S.R.L – FZE
Task Role: Sr.PROJECT CONTROL ENGINEER (Office)
Period: July 2007 to Present
Duty and Responsibilities
Direct support to site in a range of task Engineering, Procurement, Construction, Man Machine & Material coordination with engineering and procurement sections. Ensure that all engineering Design / Drawing & Material deliver at site with set time (schedule) frame.
Coordination meeting with consultant / client at a regular interval.
Fallow up with sub-contractor of insulation and painting for Piping & Structure.
Develop Tender Schedule
Develop EPC Base Line Schedule with help of concern construction manager.
Develop the Project Summary schedule for execution team.
Review and analyze CONTRACTORS Scheduling and planning documents (procedures,…)
Monitor progress and control Project activities
Identify potential delays, analyze and issue proposed corrective actions as required
Prepare the Project Planning documents
Elaborate monthly progress report OBSERVATIONS ON ACTIVITIES AND MISSIONS:
Liaise with Cost control Leader and other project packages to define progress measurement.
Ensure HSE responsibilities are adhered to and understood
Ensure Project files are accurate and up-to-date.
Document and feedback lessons learned.
Ensure timely update of all Project systems including planning and costing
Ensure that clear and achievable targets are set for all phases of the project and that these are contained in the planning system etc.
Raise Project Change Requests as appropriate to the project and ensures that these are clearly understood and reviewed (approved or unapproved)
Allocate appropriate tasks and work scopes to the Discipline engineering team.
Advise Project Manager early of any potential priority issues or workload issues Endeavour to encourage and motivate the team.
Preparation of Planning and Progress Control System works effectively, progress status and completion forecast are soundly assessed and reported; in particular: - Monitor progress measurement is properly applied and information flow is correct and complete; -
Assist the PCM in the Project Status Report preparation;
Responsible participates to the coordination meetings (internal or with the Client whenever opportune);
Project Type: ABU DHABI CRUDE OIL PIPLINE PROJECT HABSHAN TO FUJAIRAH
CLIENT: CHINA PETROLEUM ENGINEERING & CONST.CORP. (CPECC)
COMPANY: BELLELI ENERGY S.R.L
Task Role: Sr. PROJECT CONTROL ENGINEER (Head Office)
Period: March-2009 to date
Project Execution & Construction for 10 Nos. Crude oil floating roof tanks Size
(110M Dia X 20 M HT.)
Interaction / Support to site construction team, site meeting with client and consultant.
Responsible for Engineering Approval.
Responsible for EPC Schedule / Engineering & Procurement Reports.
Job Duties Description:
* Direct support to site in a range of task Engineering, Procurement, Construction, Man Machine & Material.
* Engineering and procurement ensure that all engineering Design / Drawing & Material deliver at site with set time (schedule) frame.
* Coordination meeting with material supplier at a regular interval with procurement department.
* Organize and follow-up supervision of the works performed by the construction on site,
Make sure milestone activity is perform without any delay.
* Developed level fourth construction progress monitoring / and measurement sheet with respect to project Contract requirement.
* Developed invoice progress sheet according to mile stone payment weitage.
* Updating monthly progress planning packages included Primavera Schedule, Progress Measurement sheet for Engineering, Procurement and site construction activity.
* Updating invoice / payment sheet concerning earned progress.
* Developed monthly progress report and monthly client presentation report.
* Attending all projects meeting and minutes recording for milestone event.
* Reporting to project manger and project control manger prepare level one report for higher management.
* Controlling site labors and expenditure.
* Responsible to monitor construction team utilizing proper resources as planned.
* Analysis bi weekly on whole projects events to save the cost.
Project Type: OFFSHORE ASSOCIATED GASES PROJECT PAKAGE-1 (ADGAS)
CLIENT: TECHNIP-ABU DHABI (MEPI)
COMPANY: BELLELI ENERGY FZE
Task Role: Sr. PROJECT CONTROL ENGINEER (Site / Office)
Period: Jun 2007 to March-2009
Develop base line schedule respective discipline Mechanical Piping Electrical. Instrumentation and Steel structure pipe rack (PARS)
Break down schedule up to construction level
Develop Construction fabrication and erection database/ progress measurement & monitoring system
Prepared construction and erection presentation highlighted work progress through slide show.
Prepared and released Fabrication and erection progress report to client bi weekly
Develop catch plan for detail activities sheet to achieve targets dates.
Developed and release monthly progress report during monthly work carried out Activates such as Fire Proofing, Structure erection pipe fabrication and erection Installation of cable tray & Instruments, valves etc.
Carry out resource requirement to ensure milestone and targets dates achieved with in schedule time (Resources Planning)
Supervision & monitor daily routine work Activity such as piping fabrication in inch Dia and balance diameter to achieved,
Monitor steel structure erection & assembly Activities ensure work carried out with schedule.
Project Type: PETRO RABIGH IWSPP & POWER & DESALINATION
(ARAM CO) K. S. ARABIA
COMPANY: CONSOLATED CONSTRUCTON COMPANY (3 CCC)
Task Role: PLANNING ENGINEER (Site / Office)
Period: July 2005 to March-07
Preparation of base line schedule respective discipline, civil mechanical. Electrical. Instrumentation and associated work.
Break down schedule at construction level
Preparation construction progress monitoring & reporting package.
Provide direct support to planning manager on a range of tasks such as routine calculation preparation of charts etc. with in a set period.
Carry out under supervision routine work such as material take / qty. set the resource with accordance to work productivity. Carry out and arrange a sequence of all engineering specification standard / drawing accordance to project procedure.
Project Type:
PDO S.N.GAS PLANT & ASSOCIATED FACILITIES (LNG) SAIH RWA OMAN
US$ 400 Million Project, for Petroleum Development Oman, (PDO)
Best Project - Petroleum Development Oman Engineering Conference
The plant has a capacity of 20 million cubic meters of gas a day. Construction was completed in less than three years with an exemplary safety record
Engineering Procurements Construction Commissioning & Start-up of Plant
COMPANY: Snc-Lavalin Oman
Task Role: Jr. PLANNING ENGINEER (Site)
Period: March 2003 to April 2005
Job duties: schedule controller, all phase progress measurement –up to plant start.
Nature of job:
Civil: control & substation building & plant roads
Steel structure, fab.painting, & erection.
Mechanical: installation of Rotatic & static's equipments, including heavy lift vessel inlet separators vessel, air coolers, heat exchangers turbo expander etc.
Piping (500000 inch, dia)
Electrical: Overhead line from power station to plant substation 20 kl/m, cable laying for well site to plant & inside plant installation of transformer & cabling for pumps blower etc.
Instrumentation:
Foc cable laying well heads site to plant inlet manifold, control room building. & inside the plant installation of jb & instrument for required equipments
(Control room consist of yakogava d.c.s)
Job responsibilities:
Engineering drawings and documents submittal & approval at site
Approved drgs.review and issued to execution construction disciplines / sub contractors.
Develop daily /weekly / monthly engineering deliverable progress report,
Construction activities as follows
Civil work: earthwork, road, and fencing equipments foundations, concrete pits, pipe rack foundation, precast fdn.
Control building & sub-station, and pipe supports & misc.fdn. & roads, & paving.
Structural steel:
Pipe rack & static / Rota tic equipments platforms steel structure fabrication / blasting priming / panting and erection
Piping:
Measurement of piping inch dia, inch meter fabricated pipe spool welding ndt erection. Material duplex stainless steel low temp.corbon steel cs. ss, gre, gi, fabrication / erection and testing/ painting
Mechanical equipments installation:
Vessels / tanks / filters / pumps & skid & special equipments,
Electrical: cables lying inside the plant under ground and above ground lvb / sdb / mdb
Installation of transformers & pole erection
Instrumentation:
Cable lying, installation of junction box's instruments & control panels, testing of instr.
Pipeline:
Row, excavation of trenching, stringing of the pipe & welding, grit blasting & shrink sleeving & lowering, and backfilling
Project Type: Barka Power & Desalination Plant
The natural gas-fired, combined-cycle, $425 million facility to supply 427 MW (net) of electricity and 20 million gallons per day (mgd) of water...
Installation, of Gas turbine 120 Mw (two nos.) one No Steam Turbine 240 MW Erection of Piping for Process and utilities.
COMPANY: Enel Power Oman
Task Role: PIPING / PLANNING ENGINEER (Site)
Period: 2 May 2002 to 5 Feb 2003
JOB DUTIES: Engineering / Planning-Construction scheduling site progress monitoring & schedule update
Material tracking subject to available and new arrival including tanks & vessel skids rotating and static equipments, pumps, boiler cooler, heat exchanger etc.
Login material statements electronically for variation.
Developed daily work progress report.
Piping work. Fabrication, blasting, painting & erection.of pipe spool / pipe supports. & pipe rack structure installation of equipments & structure.
Achieve schedule / target issued by client.
Maintain record for site tool & tackles,
Quantity the pipe-welding joint (inch dia)
Painting surface area erection of steel structure installation of equipments for billing.
Support to quantity surveyor for engineering quantity. As above
COMPANY: Artson Engineering Ltd. New Delhi India (EPCM)
Period: 2000 to 2002
Projects; Panipat Refinery. Aonla oil storage Terminal, Manmad storage Terminal.etc.
Project Execution & Construction for Panipat refinery Crude oil pipeline and Storage tanks Size (110M Dia X 20 M HT.) and interconnected piping.
Engineering approval with Engineers India Limited, procurement of pipes & Steel Plates,
Interaction with site construction team, meeting with client and consultant when required.
Detail Engineering / Estimation of Tanks/ Fabrication drawings for oil storage Tanks / Piping plot plan and Isometrics Drawings.
Job Duties Description:
Direct support to site in a range of task Engineering, Procurement, Construction, Man Machine & Material. Close coordination with engineering and procurement sections. Ensure that all engineering Design / Drawing & Material deliver at site with set time (schedule) frame.
Coordination meeting with consultant / client at a regular interval.
Organize and follow-up day to day supervision of the works performed by the contractors on site,
Make sure no major or important activity is performed without supervision,
Guide the inspectors in their work,
Resolve upcoming problems in relation with contractors personnel,
Assist in the evaluation of the performance of the contractor,
Identify major deficiencies in the performance of the works,
Prepare and take part in weekly progress meetings,
Evaluate the progress of the contractor and potential delays,
Collect and review daily reports of the inspectors compile progress reports,
Review and approve contractors progress reports,
Prepare instructions to the contractors,Issue non compliance certificate to contractors after coordination with Owner, Handling of field queries,
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2051 to 2100 of 10917)
Go to Search Parameters...
Brief Description
DCS system engineering design, configuration, installation & commissioning.
20+ yrs in management and technical consultancy for the international oil and gas industry. Experience in organisation and business process development, change management, management systems and procedures, business performance review and development, HR and training management.
Regional office manager position handling material, transportation, local contracts, housing, food, utilities. Fluent in ARABIC, ITALIAN, SPANISH, ENGLISH, GREEK. Knowledge of Libyan culture, religion, customs, geography, and geopolitics.
Take up Senior Corporate Management Level challenging position with multi-million Heavy industries
Possess over 25 years experience onshore and offshore in the Health, Safety and Environmental Field.
Senior Project Manager with 25+ years of experience in the Oil and Gas industry. Extensive international experience on numerous EPC projects, both Lump Sum and Reimbursable. Excellent track record of delivering projects on time and under budget. i.e. profitable. Long list of satisfied clients.
Achievement-oriented professional with extensive experiences as HR & administrative executive with large exposure in Oil & Gas sector, with a strong background into project/ branch based organisations. Graduate degree and Master's Diploma in Business Administration (MDBA).
Develop and evaluate fire hazard analysis,various types of fire protection/detection and suppression systems, scope development, review of deliverables, identify user interface requirements and project coordination
Polyester, Nylon,extrusion,plant management, manufacturing, sales
Experienced, proficient and highly qualified Senior QA Engineer/Manager, able to provide 30 years of QA and QC experience in a wide range of disciplines within the oil and gas sector. Would consider a long term posting (if possible) in the UAE, Malaysia, Thailand, Singapore, Japan or Vietnam.
Dear Sir, I am looking for a job.Thanks for your email,
Over 30 years in oil and gas pipeline inspection. Welding and NDE CSWIP 3.2 CSWIP RT UT MT + ATTO
Petroleum engineer with 28 years experience. Primarily field exploitation but includes drilling, production, reservoir and facilities. Overseas for 14 years working on properties in Pakistan, Indonesia and New Zealand. Able to work under conditions with little support staff or management supervision
I have a Bachelors degree in Chemical Eng with over 20 years experience in Safety, Chemical Plant Operations and Process Engineering in multi national chemical companies like EXXON, Ciba-Geigy, & Shell. Presently working as Senior Process Safety Engineer with a leading company in Saudi Arabia
M. Tech (Electrical Engineering) Over 17 years experience in Design, construction and commissioning in Oil & Gas, Petrochemilcal and Power plant
32+ years Civil Engineering experience on Public Works, Utilities, Industrial, Commercial and Residential projects. Experienced in streets, highways, water systems, sanitary & industrial sewers, airports, site development, grading, drainage, underground piping and specifications
Drilling Engineer . I worked as a well site-drilling engineer, drilling supervisor, operations drilling engineer, drilling superintendent and promoted to drilling engineer specialist, after receiving PhD in Operations Management
Mechanical Engineer (degree) having over 24 years experience in Planning and Maintenance in large petrochemicals, oil/gas facilities. Specialized in Maintenance Planning and CMMS (Maximo).
I am a qualified Electrical engineer with a vast exposure of more than 21 years in the field of Detailed Engineering ,Operation /Maintenance,Erection/commissioning,Testing etc in search of a suitable job in UAE,Qatar,Oman
Sr. Piping/Hvac Designer with over 25 years of experience with a solid 3D modeling experience mainly in AutoCad. Currently studying Cadworx at home using a tutorial from Cadworx.
Dear sir, I would like to submit my application form for a suitable post of production engineer. Here is my CV below. If you want other document or information, please let me know.
Mechanical/Petroleum Engineer with 20+ years of experience in artificial lift applications encompassing ESP and PCP (mainly Progressive Cavity Pumps). Development of programs to select PC Pumps and automation/controlling of PC Pump Systems based on surface data such as axial load and/or torque.
Principal Process/Facilities Engineer and Project Engineer/Manager Bachelor's Degree Chemical Engineering University of Oklahoma 1976 and MBA Studies Registered Professional Engineer American Institute of Chemical Engineers Gas Processors Association
Seasoned professional with extensive and diverse experience in the petroleum industry, looking for a challenging and rewarding operations supervisory position. Interested in either domestic employment or international rotational assignments. Will consider domestic relocation.
Control, Safety Systems and Instrumentation Design / Maintenance / Operations Engineer
EXPERIENCE:Experienced in the design of the following systems: Fiscal Oil and Gas Metering,Offshore / Onshore,Fire & Gas/ESD,DCS, SCADA ,Telecommunication,Compressor Anti-Surge,Subsea Controls,Thruster Controls,Ballast Controls,Dynamic Positioning Systems,Hydroacoustics,Winch Controls.
Pipeline Engineers, Project Engineers, Project Managers
Quality, Health, Safety and Environment Manager
I am expert in pre-commissionnig, commissioning, start up petrochemical plant spcialy in ethylene plant, consruction, field engineer familar with engineering and procurment activity, computer kwnolage, opration ethylene plant
Completion / well services /Intervention Supervisor
design of telecommunication systems namely SDH, DWDM backbone, OTN transmission systems, Microwave communication systems, FTTH systems like GPON, Metro point-to-point Ethernet, PAGA systems, UHF radio, CCTV, IDS systems for Service provider networks, business enterprise, Oil & Gas networks.
Experienced Manager with Land, Marine and North Slope experience
I am Chemical Engineer over 18 years of experience in all aspects of combined cycle chemistry, chemical/water treatment operation, quality control and analytical services as Plant Chemist/ Quality Control Supervisor in co-generation power stations. I am a Canadian citizen and willing to relocate.
I am applying for welding supervisor and i have 15 year experiance in welding
Maintenance, Installation, Comissioning, Calibration, and Design And Documentation.
Manager shift Combined cycle power plant
Drilling Engineer, 10 years experience, hpht experience, Casing design, advanced well design, drilling fluids, directional drilling, drilling software,
I have 17 years of experience and presently working with Saudi International Petrochemical Co (Sipchem). I have got specialized Skills in maintenance planning and scheduling work process control, CMMS SAP R/3 PM module, Primavera P3 / MS project, RCM, Development and implementation of maintenance
Geologist with large experience in oil and gas exploration and development-Offshore experience and TDC unit manager and well site
Certified Welding Inspector (aged 30 years) with more than 10 years experience (Six years in Saudi Arabia having valid Driving License , Singapore & UAE) Oil & Gas / Petrochemical Projects & Semi-Submersible Rigs, Offshore / Onshore Process platforms seeks a challenging position in Inspection Field.
Performance driven procurement and logistics manager offering 14 years expertise in reducing costs while increasing efficiencies in international production and exploration operations. Builds and leads internationally diverse supply chain teams.
3D models PDS, Smart plant Review, PDMS, Autocad, Miicrostation, isometrics, Orthographic Drawing Production
Having 16 years experience in the oilfield, I am a highly motivated, conscientious and experienced professional with a proven ability to work beyond the parameters of the role and to prioritise effectively to meet deadlines.
PRIMAVERA, M.S Office, AutoCAD-2007
Mud Engineer
Total 12+ years of experience (8 Years in India & 4+ Years in Middle East) in Quality Assurance / Quality Control, Inspection and Welding Engineering from Raw Material stage to Final Stage in Fabrication, Construction, during Shut Down / Maintenance, Repair / Renovation work in Oil and Gas, Petroche
Bsc of mechanical engineering 1994, onshore and offshore rigs expernice, joy stick touch screen rigs
Graduate Chemical Engineer with 08 years experience in field of Internal Corrosion and Chemical treament in oil and gas field.
Post Applied for: Planning Engineer / Sr.Planning Engineer (Primavera and MS-Project).
SOFTWARE SKILL: PRIMAVERA-P3 ,P5 ENTERPRISE , P6 PROJECT ENTERPRISE V.6.0 AND PM+
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
[ 42 ]
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com