CONTACT INFORMATION:
View contact information...
STATEMENT OF QUALIFICATIONS
Senior Piping Designer with 35 years experience in facilities layout.experiance with estimating projects, manpower forecast, checking of projects industrial and commercial plants. Projects including FPSO ships, off-shore platforms, compressor stations, mine sites, refinery layout, skid designs, plumbing (HVAC), Pharmaceutical, and Glove Box design. Various software packages including Autocad 2007, Microstation, Cadpipe, CadWorxs 2007 Plant, CadWorx P&ID 2006, Rebis (Bentley), Navis 2007 and various Flow Programs.
EMPLOYMENT HISTORY
1/09 to 4/09 SR PIPING DESIGNER (BentleyXM)
Anvil Corp.– Bellingham, Wa.
BP TAR projects –Piping lead. Various plant expansion includes, heater, coolers,contactor piperack, are some of areas of responsibilities. Duties include 3-D piping layout, model tie-ins at existing facilities,
1/09 to 6/08 SR PIPING DESIGNER (BentleyXM)
Ch2mhill– Bellingham, Wa.
BP TAR projects –Piping lead. Various plant expansion includes, heater, coolers,contactor piperack, are some of areas of responsibilities. Duties include 3-D piping layout, model tie-ins at existing facilities,
3/07 to 5/08 SR LEAD PIPING DESIGNER (BentleyXM)
Pearl– Denver,Co.
GHC Emirates Iron Steel factory –Piping lead. CO2 plant expansion includes, stripper, contactor piperack, plate exchangers are some of areas of responsibilities. Duties include 3-D piping layout, model tie-ins at existing facilities, manpower hours, schedule,change orders and building specs for Rebis XM
9/06 to 3/07 LEAD PIPING DESIGNER (Cadworx)
Ventech– HoustonTx.
Indus Refinery –Piping lead. Piperack, Flare area & vacuum tower are areas of responsibilities. Duties include 3-D piping layout, to model tie-ins at existing facilities, building specs for Cadworx,
12/05 to 9/06 LEAD PIPING DESIGNER (Cadworx)
Kochpartners– Tyler,Tx.
Wynnewood Refinery –Piping lead. Hydrotreater & vacuum tower area.Responsibilities include 3-D piping layout in office & field assignment to locate tie-ins to existing facilities, client interface at field location, construction support and project controls support.
Cadworx,
4/05 to 11/05 LEAD PIPING DESIGNER (Cadworx)
Peregrine Group– Lakewood Co.
Black Hills Exploration –Piping lead. Espinosa canyon Amine Plant, 15MMSCF treating plant and compressor station. Responsibilities include 3d piping design, iso extraction, client interface at field location, construction support and project controls support.
Harrison Western- Piping Lead Encana Hunter Mesa, Rifle, Co. Water conditioning plant
Piping layout, pipe supports, BOM, field coordination for construction. Cadworx,
9/04 to 4/05 LEAD PIPING DESIGNER (Cadworx)
Jacobs– Lakewood Co.
Suncor –Piping lead. Hydrotreater, 50,000 BBL treating plant and compressor station. Responsibilities include 3d piping design, iso extraction, client interface at field location, construction support and project controls support.
Water conditioning plant, Piping layout, pipe supports, BOM, field coordination for construction.
Cadworx,
5/04 to 8/04 SR. PIPING DESIGNER (Cadworx)
Intergrated Flow Solutions– Tyler, Tx.
Lead Piping designer on an ammonia injection project for Santee Cooper, consisting of storage tanks, building layout, piping, rack layout, P&ID, line list & other project requirements.
RANDALL K. SALINAS
Page 2
8/02 to 4/04 LEAD PIPING DESIGNER (Cadworx & Rebis)
Petrofac – Tyler, Tx.
Modular piping project for Petrobras on an 180K bbl per day FPSO. office assignment
Consisting of piping work for Process, utilities, drains, instrumentation and deluge in a cadworx model. Field work consisting of coordinatating & documentation of all field and office modifications to piping, structural, instrumentation &electrical. Other respondsibilities included piping specs, as-built dwgs.for all disiplines, weld procedure, manpower forecast,
.
10/01 to 6/02 LEAD DESIGNER (Cadworx)
Harris Group – Denver, CO
Compressor Station Layout, Pipeline facilities, schedules and manpower forecasts
Power plant layout; main gas compression utilities,B.O.M., ISOS
Cadworx
LEAD DESIGNER (Propipe & Cadworx)
1/00 to 09/01 Trigon-Sheehan – Denver, CO
9/87 to 1/88 Compressor Station Layout, Pipeline facilities, schedules and manpower forecasts
Piping design for natural gas process facilities
SENIOR PIPING DESIGNER (Propipe & Cadworx)
4/99 to 5/99 ForeRunner Corporation – Lakewood, CO
6/98 to 1/99 Various pipeline and compressor stations projects
SENIOR PIPING DESIGNER (Propipe)
Stone & Webster - Englewood, CO
10/97 to 5/98 Senior Designer on various projects including Rocky Flats and Savanna River
Equipment layout and Checking
11/85 to 3/86 Piping Designer on Pawnee Power Plant Project and Sinopec International Refinery
Expansion.
1/97 to 10/97 SENIOR DESIGNER (Propipe & Cadworx)
Rapley Engineering – Englewood, CO
Various compressor station projects and Pharmaceutical facilities
6/96 to 1/97, SENIOR PIPING DESIGNER (Propipe)
3/95 to 4/95, Bateman Engineering, Inc. - Lakewood, CO
7/92 to 11/93 Piping Lead on Lurgi Gold Project, Acid Plant Layout, Piping Layout, Vessel O&E
Various Oil & Gas refinery projects
11/95 to 5/96 SENIOR PIPING DESIGNER (Propipe)
Jacobs Engineering - Denver, CO
Various Oil & Gas Refinery projects, Syntex
9/94 to 2/95 SENIOR FACILITIES DESIGNER (Propipe)
Behrent Engineering Company - Wheat Ridge, CO
Senior CAD facilities designer on various projects including, Chiller
Relocation at DIA, Lithium Dust Glove Box design for Santa Fe Engineering,
Coors Bottleline 6.
1/94 to 5/94 SENIOR PIPING DESIGNER (Propipe & Microstation)
10/79 to 2/81 Kilborn International, Inc. - Englewood, CO
CAD piping designer for various mining facilities. (Propipe)
View contact information... |