CONTACT INFORMATION:
View contact information...
Career Objective
To find a challenging position to meet my competencies, capabilities, skills, education and experience.
Age: 36 Years
Date of Birth: 2nd February 1973
Nationality: Indian
Marital Status: Married & having two kids
Highlights: Over 16 years of wide and varied experience in the area of engineering consultancy for Design and Detail Engineering for Oil & Gas, Offshore / Onshore, Refinery, Petrochemicals, Alumna Plant, Pipelines, Gas Processing & LNG projects. I am fully conversant with all types of Process Control & Instrumentation design and detail engineering, familiar with international standards & codes for instrumentation engineering and practice. Detailed Job description and responsible in the area of Instrument, Control System & Telecommunication is given below:-
Summary: Designing / Detail Engineering
„« Designing and Checking of Inst., Control System and Telecom Drawings / Documents.
„« Excellent experience with SPI-INtools software modules: i.e., Instrument Index, Wiring, Hook-ups, Loop Diagram, Instrument Spec, Process Data, Browser module etc.
„« Very Good understanding of SPI-Intools for setting-up, supporting projects and customization of Reports.
„« Excellent experience in preparing I/O list for DCS, PLC/ESD & Fire & Gas.
„« Excellent experience in detail design of project: i.e., Instrument Index, Cable block diagrams (PCS/PSD, ESD/F&G), System block diagram, Bill Of Material (MTO), Installation Standards (Impulse tubing & piping hook-ups), Wiring Hook ups, air supply hook-up, Cable Schedule, Instruments Location Plan, Cable duct/tray/trench routing, Tube tray routing, F&G/ESD layout, Fusible Plug location Layout, analyzer shed location finalization, inst. road crossing (IRC), Instrument Air supply Distribution scheme, Level Sketch Design, Functional Schematics, Loop Diagrams, Interconnection Diagrams, Ladder (logic) diagrams, Point Data Base, DCS Graphics, panel front layout of various pipeline jobs, panel arrangement in control room etc.
„« Excellent experience in preparation of various Control Room layouts(Inside): - Control Room Layout, Channel base layout, Signal cable layout, Power cable layout, Earthing layout, Signal /Power Cable tray layout, MCT Layout.
„« Power cable size calculation, power supply distribution scheme (120VAC, 24VDC), cables and cable glands estimation, control room cable entry (MCT Frame) size calculation.
„« Sizing Calculation of Control Valve, Orifice Plates, Pressure Safety Valves using Instru Calc Sizing Program.
„« Preparation of Data Sheets & Specifications for Pressure/Temp./Level Gauge, Field Instruments (transmitters, switches), Orifice Plates, Control Valve, Pressure Safety Valves etc.
„« Vendor data document (DCS, IPS, FGS) Review & Engineering for Construction.
„« System Block Diagram for VHF/UHF Radio, LAN Network, PA/GA System, Ship to Shore Telephone/ESD communication system, Hotline Telephone system, CCTV System, Equipment Layout of Telecom i.e. Speaker Layout, PA/GA Layout, Telephone/ Hotline & CCTV Layout.
„« Excellent interpersonal communication skills and working effectively in multi-cultural environments to ensure coordinated design.
„« Familiar with international standards. ISA, API, BS, NFPA, ISO etc.
„« Also attended the Factory Acceptance Test in Singapore (Hardware test, Software test & integrated FAT) for DCS, IPS & FGS systems.
„« Also Very Good Experience of PDMS/PDS modeling for the Inst. Cable Tray, Junction boxes location, Local Panels and Instrument location (offline) etc.
Team Leader Qualities
„« Preparation of project execution schedules and coordinating with various disciplines.
„« Excellent Manpower estimation/management of the project.
„« Excellent Communication, Co-ordination & execution skills of any sensitive, difficult and highly complicated projects.
„« Maintaining project documentation until the commissioning of the project.
„« Excellent supervision of medium to large team of designers of the Project.
Computer Literacy
Skill Level Years practiced
„« INtools ver.6.0 & 7.0 (Browser/Inst Index/Wiring/
Hook-ups/Loop Diagram/Specs/Process Data) Expert More than 6 years
„« MS Access 2003 & 2007 Intermediate More than 3 years
„« AutoCAD Rel.11, 12, 14, 2000-2008 Expert More than 15 years
„« Microstation - ver.J/7.1.1 & 8.0 Expert More than 5 years
„« Foundation Field bus Technology Expert More than 5 years
„« MS Office 2000,2003,2007(Word, Excel, PP) Expert More than 12 years
„« Plant Design System - EE Raceways (3D) ver 7.2 Intermediate More than 5 years
„« Smart Plant Review(SPR) Ver 5.1(PDS Review pkg) Expert More than 5 years
„« PDMS-3D Model Design (Equipment, Cable Trays,
Multi Disciplinary Support (MDS) ver.11.5&11.6SP4 Expert More than 5 years
„« AVEVA Review Ver.6.4 (PDMS Review Pkg) Expert More than 5 years
Professional Qualification / Education:
„« Degree of Masters in Computer Applications (MCA)
December 2005: Indra Gandhi National Open University, New Delhi, India
„« Advance Diploma in Computer Applications (ADCA)
December 2003: Indra Gandhi National Open University, New Delhi, India
„« Degree of Bachelors in Computer Applications (BCA)
December 2003: Indra Gandhi National Open University, New Delhi, India
„« Diploma/Certification in Programming practice & Techniques in SAD, FoxPro, CPD
July 1999: APTECH Computer Education, New Delhi, India
„« Diploma/Certification in AutoCAD Rel.14 - 2D Drafting
March 1999: CADD Centre Training Services(Autodesk Training Center),New Delhi, India
„« Diploma/Certification in DOS, Windows, MS Word, Excel, PP, MS Access, LAN, CPD
December 1998: APTECH Computer Education, New Delhi, India
„« Diploma/Certification in Instrumentation Engineering (on Job, Oct 1994 - Oct 1995)
October 1995: National Council of Vocational Training, Engineers (I) Ltd, New Delhi, India
„« Diploma in Draughtsmanship (with Distinction)
July 1993: Industrial Training Institute, Uttar Pradesh, India
„« 12th (Senior Secondary with Physics, Chemistry, Mathematics, English)
May 1991: Uttar Pradesh Board, UP, India
„« 10th (Higher Secondary with Science, Maths, English, Biology) with first division
May 1989: Uttar Pradesh Board, UP, India
Languages: Language/Level Reading Writing Speaking
„« English Expert Expert Expert
„« Hindi Expert Expert Expert
Work History
Oct 2008 SENIOR INSTRUMENT, CONTROL SYSTEM & TELECOM DESIGNER
to Till date: Teknica (UK) Limited, Holborn Tower,137 High Holborn, London WCIV 6PW, United Kingdom
„« In Teknica (UK) Limited, I am Senior Instrument & Control System Designer, presently deputed to the WAHA Oil Company, Tripoli, LIBYA, responsible for all the design & drafting activities of the various project of the WAHA oil / gas fields. Mainly I/O list, Loop diagrams, interconnection diagrams, instrument index, cable schedule, instrument layout, hook-ups diagrams, P&ID updation as per the project requirement, power cable size calculation, database updation/checking in Intools/Access, Junction boxes & Wiring diagrams, AS-Built of the various project (i.e. ES-Sider, Gialo-II, Belhedan Station). I have visited the site for resolving the site queries as well as completion of the as-built project.
Feb 2008 SENIOR DESIGNER (INST., CONTROL SYSTEM & TELECOM)
to Oct 2008: WS Atkins & Partners Overseas, A4 Block, SAIF Zone, Sharjah, United Arab Emirates
Project: RESHADAT RENOVATION AND DEVELOPMENT PROJECT
Client: IRANIAN OFFSHORE OIL COMPANY
„« The Reshadat Field, formerly called Rostam, is located in the Persian Gulf 110kms south-west of Lavan Island. New production (P4), quarters (Q4), wellhead (W4) and flare (F4) platforms. P4, Q4, W4 and F4 will be bridge-linked. A new wellhead platform (W0) to be located south of the existing R7 complex. R7, R3 and R4 to be abandoned. All wellhead fluids will be transferred to P4. At P4, the wellhead fluids will be processed.
„« Reshadat project, I was Lead Designer, responsible for all the design & drafting activities of the project, following were the main responsibilities: -
Instrument Index, Wiring, Loop diagram, hook-up assignment in Intools, Cable block diagram (DCS/ESD/F&G), Cable Schedule, Instrument/F&G layout, PAGA layout, Telecom Layout, Wellhead Control Panel design, I/O list, power consumer list, power cable size calculation, Control room layout design, Hook-ups (Piping/Tubing/Air supply/Hydraulic) preparation in AutoCAD, & co-ordination with the client & other project personnel to resolve the queries/comments. Also completed all Instrument Cable tray, Junction Boxes, Local Panel, Instruments (offline) in PDMS.
Aug 2006 SENIOR DESIGNER (INST., CONTROL SYSTEM & TELECOMMUNICATION)
to Jan 2008: Technip, Abu Dhabi, P.O Box 7657, NBAD Tower, Khalifa Street, Abu Dhabi, UAE.
Project: ZCSC-DEMOTHBALLING PROJECT (FEED)
Client: ADMA OPCO
„« Demothballing project was an existing offshore 16 well platform, ADMA OPCO revamping this project & integrating with the new DCS, IPS & F&G system, previously it was connected with the SCADA system.
„« Demothballing project I was Lead Designer, mainly responsible for the following activities:
a) Develop Instrument index/database, location plans, loop diagrams, schematics, panel drawings, installation details/Bill of Materials, Cable Schedule, Control room layout, ESD matrix layout, and all instrument drawings, including drawings related to DCS and PLC interface.
b) Perform checking of all discipline deliverables as appropriate to the discipline to ensure they clearly depict the design, meet layout requirements and develop alternate design layouts of systems as required.
c) Ensure good communication and coordination between multi-discipline jobs and with plant engineers, clients and field contractors.
Project: CLP Ph-4 LNG LOADING & STORAGE QG-II DEVELOPMENT PROJECT (OFSHORE + ONSHORE - DETAIL ENGG)
Client: QATAR GAS
„« QG-II CLP Phase-4 (LNG) project is additional phase of CLP (LNG) project, in this phase QG-II has introduced 1 Berth, 1 tank (capacity is 140000m3), four compressor, 2 LNG skid & 1 BOG skid with the foundation field bus Instrumentation facility.
„« QG-II project, I was Lead Designer, responsible for the following main activities:
a) Provide guidance/assistance to I&C designers on the project b) Interface with project, client personnel and other disciplines to ensure coordinated design.
c) Prepare estimates, schedules and perform man-hour, manpower requirements.
d) Preparation of Instrument Index, Wiring, Loop Diagram & assignments of Hook-ups in SPI-INtools.
e) Design Input to PDS operator for locating the Instruments, Junction boxes, cable trays & local panels.
f) Preparation of following different types of MTOs:
i) Wiring MTO ii) Piping MTO iii) Tubing MTO iv) Cable Tray MTO v) Installation MTO
vi) Cable Gland MTO vii) MISC MTO
g) Preparation of Hook-ups (Process/hydraulic/Tubing/Wiring/ Analyzer) based on piping class & service.
h) Maintaining Project files, till the commissioning the project, also leasing with other discipline to develop design.
i) Production and Checking of all Instrumentation & Control System and Telecommunication Design Documents/Drawings.
j) Review the PDS progress for Instrument & Telecom using Smart Plant Review (SPR 5.1)
k) DCS/IPS/FGS & Fiscal Metering (LNG/BOG) vendor document review.
l) I had attended Factory Acceptance Test (Hardware/Software/ Integrated) in Singapore (Emerson/Invensys) for the DCS/IPS/FGS system & for Fiscal Metering System (BOG/LNG) in Alderly, Jabel Ali, Dubai.
m) I had visited the Site (Ras Laffan, Qatar) for resolving the site queries.
n) Review constructability, operability and safety in design.
o) Assist in training junior-level Designers in various procedures.
p) Perform quality checks and verification of compliance to standards for all instrumentation related drawings issued for construction.
Jan 2004 SENIOR DESIGNER (INSTRUMENTATION & CONTROL SYSTEM)
to July 2006: Engineers India Limited, 1, Bhikaiji Kama Place, Ring Road, RK Puram, New Delhi, India
Project: GREEN FUEL EMISSION & CONTROL PROJECT (DETAIL ENGG.)
Client: HPCL MUMBAI, INDIA
„« HPCL has increased the capacity of Mumbai Refinery from 8MMTPA to 13MMTPA & established some new units (i.e. NHT+CCR, Isomerisation, Prime G+, NSU, LPG Recovery, SWS/ARU) as well as modification in the old units (i.e. FR APS/VPS, FRE APS/VPS, LR VPS & FCCU etc.).
„« In the GFEC project I was lead designer & mainly involved with Level instrument design for new units as well as old units, Point Database, Electrical Interface details, Instrument Index, DCS/PLC I/O list, Bill of Material, Cable Schedule, Installation/Tubing Hook-ups, Cable/Cable glands Estimation, MCT cable block sizing, Cable Duct/Tray Finalization, Control room layout, Analyzer shelter location finalization, System Architecture Drawing, Instrument Location Drawing & PDMS modeling of the duct.
Jan 2003 SENIOR DESIGNER (INSTRUMENTATION & CONTROL SYSTEM)
to Dec 2003: Engineers India Limited, 1, Bhikaiji Kama Place, Ring Road, RK Puram, New Delhi, India
Project: DAHEJ - VIJAIPUR (42¡¨ LNG) PIPELINE (DETAIL ENGG.)
LUCKNOW- KANPUR PIPELINE (DETAIL ENGG.)
SOUTH-GUJARAT PIPELINE (DETAIL ENGG.)
RSPPM PROJECT (DETAIL ENGG.)
Client: GAIL INDIA LIMITED, ONGC LTD INDIA
„« Dahej-Vijaipur Pipeline is 42¡¨ LNG pipeline & 1600 KM long, Dahej is Dispatch terminal & Vijaipur is Receiving Terminal.
„« South-Gujarat pipeline is Tap-off from the DVPL pipeline.
„« RSPPM project is 28 well offshore project of M/s ONGC, India
„« In the above pipeline project mainly performed, Instrument Index, instruments/junction boxes location plan, Cable trench/tray routing from field to control room, Bill Of Material, Functional schematics, inst. road crossing (IRC), cable schedule, power supply distribution scheme (230V AC, 24V DC), panel front layout of various pipelines, Power Cable size Calculation, installation standards, Tube tray routing, F&G Layout, Fusible Plug location, Fire & Gas Detection System layout, cables and cable glands estimation, control room cable entry (MCT/Pipe Sleeves), panel arrangement in control room, loop schematics, ladder (logic) diagram of south Gujarat pipeline, checking of pipeline GADs. Co-ordination with other departments i.e. General civil, Electrical, Pipeline and Architecture etc.
June 2000 INSTRUMENTATION & CONTROL SYSTEM DESIGNER
to Dec 2002: Engineers India Limited, 1, Bhikaiji Kama Place, Ring Road, RK Puram, New Delhi, India
Project: ALUMINA & LIME HANDLING PLANT, DAMANZODI, URISSA (DETAIL ENGG)
SMELTER EXPANSION PROJECT, ANGUL, URISSA, INDIA (DETAIL ENGG.)
Client: NATIONAL ALUMINUM COMPANY (NALCO), Urissa, India
„« Nalco has an Alumina plant in the Damanjodi, India & Smelter plant at Angul, India, Nalco expand the alumina plant from Ist stream to IInd & IIIrd stream & production will reach 3 times of the previous capacity. In the Smelter plant they added four more bays to increase the capacity.
„« Performed design & detailed engineering activities for the Alumina Plant jobs i.e. Instrument Index, GAD checking, Air supply distribution, control room layout (1CCR & 7CR), Gas Detector layout, instruments/junction boxes location plan, Functional schematics, power supply distribution scheme (230V AC, 24V DC), cable schedule, Cable glands & Plugs estimation, inst. Cable duct/trench/tray routing form field to control room, inst. road crossing, control room cable entry (pipe sleeve or MCT), panel arrangement in control room, installation standards/tubing hook-ups, Bill Of Material, Coordination with various departments i.e. General civil, Electrical, Pipeline, Architecture & structure etc.
Jan 1999 INSTRUMENTATION & CONTROL SYSTEM DESIGNER
to May 2000: Engineers India Limited, 1, Bhikaiji Kama Place, Ring Road, RK Puram, New Delhi, India
Project: JAMNAGAR - LONI PIPELINE PH-II (DETAIL ENGG.)
MANGLORE HASSAN BANGLORE PIPELINE (HPCL) (DETAIL ENGG.)
VIZAG - VIJAYWADA- SECUNDRABAD (LPG) PIPELINE (DETAIL ENGG.)
Client: GAIL INDIA LIMITED & HINDUSTAN PETROLEUM CORP. LIMITED, INDIA
„« MBPL is multi product pipeline of M/s HPCL, India
„« Jamnagar-Loni is LNG pipeline of M/s GAIL Ltd, India
„« Vizag-Secundrabad is LPG Pipeline of M/s GAIL Ltd, India
„« Performed design & detailed engineering activities for the above pipeline jobs i.e. Instrument Index, GAD checking, inst. Layout, cable schedule, Cable glands & Plugs estimation, inst. Cable duct/trench/tray routing form field to control room, inst. road crossing, control room cable entry (pipe sleeve or MCT), panel arrangement in control room, installation standards/tubing hook-ups, Bill Of Material, SCADA I/O lists of MBPL, Material Take Off. Coordination with various departments i.e. General civil, Electrical, Pipeline, Architecture & structure etc.
Jun 1996 Jr. INSTRUMENTATION & CONTROL SYSTEM DESIGNER
to Dec 1998: Engineers India Limited, 1, Bhikaiji Kama Place, Ring Road, RK Puram, New Delhi, India
Project: GAS CRACKER PLANT (DETAIL ENGINEERING)
ETHYLENE OXIDE / ETHYLENE GLYCOL (DETAIL ENGINEERING)
Client: INDIAN PETROLEUM CORPORATION LIMITED, INDIA
„« Gas Cracker plant set up by M/s IPCL, India in Gandhar Gujarat, India, In this plant Ethylene Oxide/ Ethylene Glycol shall cracked & takes into the various form of the polymer.
„« Performed design & detailed engineering activities for the petrochemical jobs i.e. Instrument Index, instruments/junction boxes location plan (heater area of Gas Cracker also), cable schedule, inst. Cable duct/tray routing form field to control room, control room entry (MCT block), installation standards, Bill Of Material, Air supply Distribution. Coordination with various departments i.e. General civil, Electrical, Piping, Architecture etc.
Feb 1996 Jr. INSTRUMENTATION & CONTROL SYSTEM DESIGNER
to June 1996: Triune Projects Pvt. Limited, 15, Nehru Place, New Delhi, India
Project: HALDIA PETROCHEMICALS (DETAIL ENGINEERING)
Client: HPL INDIA LTD, INDIA
„« Haldia Petrochemical plant set up by M/s HPL in Haldia, West Bangal, India.
„« Performed detailed engineering activities for the above petrochemical job i.e. Instrument Index, instruments/junction boxes location plan, cable schedule, inst. Cable duct/tray routing form field to control room, control room entry (MCT block), Air supply Distribution. Coordination with other departments i.e. General civil, Electrical, Piping, Architecture etc.
Nov 1995 Jr. INSTRUMENTATION & CONTROL SYSTEM DESIGNER
to Feb 1996: Petrotech Engineers (I) Pvt. Limited, 104, Malviya Nagar, New Delhi, India
Project: PANIPAT REFINERY PROJECT (DETAIL ENGINEERING)
Client: INDIAN OIL CORPORATION LIMITED, INDIA
„« Panipat Refinery was a grass root refinery of IOCL, India. In this plant there are various units i.e. CDU/VDU, Merox, HCU, H2, VBU etc.
„« Performed instruments/junction boxes location plan, cable schedule of VBU unit, instrument index updating of CDU/VDU, HCU, and H2 units.
Oct 1994 TRAINEE INSTRUMENT & CONTROL SYSTEM DESIGNER (APPRENTICESHIP, NCVT)
to Oct 1995: Engineers India Limited, 1, Bhikaiji Kama Place, Ring Road, RK Puram, New Delhi, India
Project: PANIPAT REFINERY PROJECT (DETAIL ENGINEERING)
Client: INDIAN OIL CORPORATION LIMITED, INDIA
View contact information... |