CONTACT INFORMATION:
View contact information...
SUMMARY:
Thirty years of instrumentation and electrical design experience with special skills in the following areas:
* Process Analyzers * MicroStation V8 * AutoCAD R2007 * SmartPlant Instr V7
* Power Distribution * DCS & PLC * Motor Controls * Grounding
* Process Instr * Intools * Lighting * Fire Detection Systems
* Documentum * SAP
EDUCATION:
1997 Puffer-Sweiven, Stafford, TX - Micromotion & Control Valve Sizing Seminar
1994 ISA Show, Houston, TX. - Process Control Seminar
1994 ISA Show, Houston, TX. - Process Safety Management Seminar
1980 Gilbert Associates, Inc. - Fundamental Wiring & Block Diagram Course
1978-1979 Penn State University, Berks Campus, Reading, Pennsylvania
Majoring Course: Electrical Engineering Technology
EXPERIENCE:
3/2009-7/2009 Instrument/Electrical Designer – Taylor & Hill, Houston, Texas.
Assignment: 3/2009 to 7/2009 – Ineos – Chocolate Bayou – Work order Projects
9/2007-12/2008 Instrument/Electrical Designer – Southwest Design Services, Houston, Texas.
Assignment: 9/2007 to 12/2008 – Bayer – Baytown, Texas – Duties include use of Intools Ver. 7.
9/2006-9/2007 I&E Design Supervisor – L-Con Engineers and Constructors, Houston, Texas.
9/2003-9/2006 I&E Design Group Leader – Chemic Engineers, Hitchcock, Texas.
10/2000-9/2003 Instrument/Electrical Designer – S&B Engineers, Houston, Texas.
Assignment: 7/2002 to 9/2003 – GBBiosciences - Houston, Texas
Assignment: 10/2000 to 7/2002 – Solvay Polymers – Deer Park, Texas – Duties included Fire alarm system for gas turbines.
3/92 – 10/2000 Control Systems Squad Leader - CDI Engineering Group, Houston, Texas.
Assignment: 2/98 to 4/99 - Huntsman - Pasadena, Texas
Duties included: Lead I&E Designer in all phases of instrument and electrical design for plant, to include Utilities DCS upgrade with ABB Taylor MOD300.
Assignment: 7/95 to 2/98 - Monsanto. - Chocolate Bayou, Alvin, Texas
Duties included: Lead I&E Designer in all phases of instrument and electrical design for plant, to include specification of all instruments on Eastman Sorbic Spray Granulation Project.
Assignment: 12/93 to 7/95 - Miles Inc., Baytown, Texas
Duties included: Power & Control Systems Design, To include installation design for process analyzers.
Assignment: 3/92 to 12/93 - Lubrizol, Deer Park, Texas
Duties included: Revamp poly unit, to include installation of new GE MCC's with load monitoring linked to ABB-Taylor DCS system.
9/91 - 3/92 Instrument/Electrical Designer - Gulf Interstate Engineering, Houston, Texas.
Duties included: Electrical and instrumentation design for gas transmission compressor and metering stations, to include the use of AutoCAD in a UNIX environment.
CHARLES J. SHEIDY Page 2
2/91 - 9/91 Instrument/Electrical Designer - G.A.S. Technical, Houston, Texas.
Assignment: M.W.Kellogg Co., Houston, Texas.
Duties included: Electrical and instrument design of Mobil petro-chemical facility in Beaumont, Texas, to include use of Intergraph's Microstation.
10/90 - 2/91 Instrument/Electrical Designer - Bay Technical Design, Inc., Pasadena, Texas.
Duties included: Electrical and instrument design of petro-chemical and paper mill facilities, to include use of AutoCAD.
6/89 - 10/90 Instrument/Electrical Designer - CDI Corporation - King of Prussia, Pennsylvania.
Assignment: 6/89 to 10/90 - The DuPont Company - C&P Engineering - Newark, Delaware.
.
9/87 - 6/89 Instrument/Electrical Designer - The Byrnes Group, York, Pennsylvania.
Assignment: 2/88 to 6/89 - Hershey Chocolate USA - Hershey, Pennsylvania.
Assignment: 9/87 to 2/88 - Hanover Industrial Machine Co. - Hanover, Pennsylvania.
4/85 - 9/87 Instrument/Electrical Designer - United Technical Associates - Reading, Pennsylvania.
Assignment: 8/86 to 9/87 - Armstrong World Inc. - Lancaster, Pennsylvania.
Duties included: Design of control schemes for floor and ceiling tile manufacturing plants, to include program writing for Allen-Bradley PLC2/05 using UPDOC software, selecting electrical hardware, and layout of MCC's.
Assignment: 4/86 to 8/86 - Spotts, Stevens & McCoy, Inc. - Reading Pennsylvania.
Assignment: 11/85 to 4/86 - M&M/MARS, Inc. - Elizabethtown, Pennsylvania.
Assignment: 7/85 to 11/85 - CertainTeed Corp. - Bluebell, Pennsylvania.
Duties included: Electrical and instrument design for fiberglass batt insulation manufacturing plants, to include use of "INTERGRAPH" CADD software on VAX based "Interact" terminals.
Assignment: 4/85 to 7/85 - Wagner Associates - Reading, Pennsylvania.
Duties Included: Electrical design and drafting of the IBM Hudson Hills Research Center, to include fire alarm, P.A., tele-com, lighting, and power distribution.
2/84 - 4/85 Engineering Technician - General Battery Corporation, Reading, Pennsylvania.
Duties included: Assisting in the design and building of an automated battery assembly pilot plant, to include instrument calibration and laboratory testing of prototype D.C. storage batteries.
6/83 - 2/84 Instrument/Electrical Designer - Volt Technical Services, Jenkintown, Pennsylvania.
Assignment: Abar Corporation, Feasterville, Pennsylvania.
Duties included: Developement of control schemes for vacuum furnaces.
12/81 - 6/83 Maintenance Electrician/Mechanic - Empire Steel Castings, Inc., Reading, Pennsylvania.
Duties included: Electro-mechanical trouble-shooting on molding machines, induction furnaces, arc furnaces, and overhead cranes.
7/78 - 12/81 Instrument/Electrical Designer - Gilbert Associates, Inc., Reading, Pennsylvania.
Duties included: Electrical and instrument design of nuclear and fossil power plants and "As Built" Documentation at "Three Mile Island" nuclear power plant.
View contact information... |