Position Applied For: Mechanical Inspector
Personal Information:
Date of Birth: 02 July 1963 Passport No- SS0015434
Gender: Male Date issue- 28 January 2006
Nationality: Filipino Expiry Date- 28 January 2011
Civil Status: Married
EDUCATION:
B.S. Mechanical Engineering, from Cagayan de Oro University (Philippines)
Year 1981 to 1986
Total years of experience: 18 years
Qualification: Approved Mechanical/Piping Inspector
Aramco Projects
Software skills:
Operating System: MS-DOS, Windows NT.
Other Packages: MS- Word, Ms- Excel, Ms- Power Point.
DRIVING: Having valid License (Qatar & Philippines)
CAREER OBJECTIVES: To obtain challenging position commensurate to my professional experience in a progressive, growth oriented company. To work for organization that recognizes individual abilities, talents and accomplishments.
KEY QUALIFICATIONS
More than twelve years of experience in Construction, Fabrication, Maintenance, Quality in Oil & gas field, Petro-chemical field, Air base Jet fuel transport facilities, Commercial and high rise Building.
Procedure and system in accordance with ISO9001 and ensuring that personnel responsible for quality control aware of maintaining the project specification and these adhered to throughout the project Knowledge of specification codes worked according to project specification, SAES, SAMMS, API, ASME, NACE and can manage and deal with all technical and non-technical staff employed in the project & plants and can deal with client and consultant.
* Well experience in Supervisory aspects of the construction and maintenance industry.
* Familiar with safety regulation.
* Ability to develop, update and maintain in-house technical standard and inspection
Plan
* Familiar with ASME, API, NACE Standards
* Good exposure in ISO 9000 Management system
QUALITY ASSURANCE
Preparation/ Review of Documents
* Contract review to understand the quality requirements and scope of
Inspections.
* Review applicable code of practice.
* Prepare/ review contract quality plan
* Preparation/ review of Pre- Production and post Production documents.
* Preparation/ review of QCP or ITP
* Preparation of Inspection schedule.
* Preparation of NDT requirements and percentage as per recommended specification and code.
* Welding inspection requirements and preparation of NDT plan
* Document control of quality records and inspection test reports
Verification of other documents:
* Raw material mill test certificates are verified and confirmed to the code requirements.
* Welding /NDT consumables and other consumables test certificates are reviewed.
Calibration:
All inspection tools, Test equipment, gauge etc are calibrated and the calibration certificates are
Currently valid.
Documentation & Test pack preparation
* All the results of the inspections and tests are reported on daily basis and the reports are reviewed
And approved to the applicable code and to the customer specifications. Any deviations shall be
Documented and resolved
* Quality records shall be complied in a test pack and submitted for final approval before
Hydro-test testing & commissioning
Effective Quality Control
„« Goods inwards inspections (Dimensional stability, mechanical properties)
„« Sub-assembly and final dimensional inspection to the approved drawing
„« Welding inspection (surveillance checks before, during and after welding)
„« Ensure that all NDT specified are carried out and the reports are reviewed
„« Conduct inspection as per scheduled request for inspection by contractor
„« Prepare punch list for mechanical and piping activities
„« Witness air bubbles leak test, hydro test and review the charts and reports
„« Nonconforming products are identified and rechecked.
„« Co-ordinates with pre-commissioning activities
.
The following are from my experience generally covers in the quality assurance and through
Inspection of
* ASME B 31.3 -Construction of Oil and gas station/chemical plants.
* ANSI ASME SEC V, VIII, API 510 & API 570 -Pressure Vessels fabrication.
* ASME B 31.1 -Construction of power Boiler
* API-653 & 650 -Storage Tanks.
* AWS D1.1 -Heavy structures
* API-1104 -CROSS COUNTRY PIPE LINE AND FLOW LINES "OFF- PLOT"
EMPLOYMENT RECORD:
June 05 2007 TO June 05, 2009: SPIE/IPEDEX Production LLC, Ras-Laffan Refinery Project. Own & Operated by Qatar Gas Company LTD, State of Qatar.
(Finished Project)
Project: Ras Laffan Oil & Gas Refinery
Client: Qatar Gas Company.
Position: Piping Inspector (Client)
Main function:
* Monitor assesses and report construction processes
* Perform Piping quality inspections activities as per Inspection Test Plan on critically
Basis
* Keep Quality field engineer updated with discipline quality issues.
* Provide expertise to PMT/ Contractor team to avoid/resolve quality problems.
Duties: Review documents and inspect incoming piping materials (pipe, valves, fittings, etc.) to insure conformity with project specifications and international code and standards. Review / verify that welding inspection has been performed and joints have been released prior to hydro test. Check that dimensions and alignment tolerances of the piping systems are as per project specifications. Perform surveillance to check compliance with piping erection procedure including alignments, torqueing, cleanliness, etc. Performs walk down / line checks of piping system for verification of punchlist completeness before and after mechanical completion. Review completeness of piping test packages prior to testing Hold/Witness hydro test. Complete and endorse inspection records. Maintain interface with the contractor to ensure that all project procedures and specifications are met. Hold/Witnessed flushing activities. Identify non-conforming piping products or activities and initiate non conformance reports and corrective /preventive action reports.
March 05 2007 To June 04 2007: Al Jaber Energy services (AJES), OGD-III Bechtel Eastern Company Ltd Project, Habshan, Abu Dhabi, and UAE
Project: Onshore Gas Development ¡VIII project
Client: Bechel Eastern Company
Position: QA/QC Piping Inspector
Duties: Responsible for the inspection testing and witnessing in construction of underground non metallic piping activities, ensuring that personal responsible for quality control are aware of and maintaining the project specification and that they are adhered throughout the project, managing the construction activity and quality of the project. Main tasked is to control construction material, Inspection of incoming material in line with client's requirements and approved specification. Conduct testing as per approved Inspection and Test Plan (ITP), maintain records including logs of all QA documentation, initiate project continuous improvement initiatives and ensure safe instruction will be implemented at site.
June 2001-March 04 2007: National Engineering Services & Marketing Co Ltd (NESMA), Al-Khobar, Saudi Arabia
1.) Project: Tanker Transport Offloading Facilities, Thumrait Air-base, Sultanate of
Oman (US Army air base facilities)
Client: United States Army Corps of Engineers.
Date: November 2005 to March 2007
Position: QA/QC Engineer
Nature of work, procure supply and installation of facilities including of 6.0 KM pipeline for transporting of jet fuel from offloading area to US airbase storage tank. I am working as QA/QC Engineer, I am responsible for mechanical, Hvac's and piping inspections ensuring that all aspect conforming to project specification, including fit-up, full welding for piping, pump erection, various mechanical equipment and storage tank. Had an excellent experience in implementing PWPS & PQR as well as the project specs and international standard and codes. Notify client for daily inspections, hold/witnessed hydro testing for piping systems. Carried out all NDT requirements, and assisting third party to perform MPI, PMI, PT and x-rays for piping. Interpret x-ray film results and clearing all rejection prior to hydro test. Prepare test packages. Carryout Inspection in accordance with ITP, Prepare daily welding reports as well as monitoring weld joints rejection and have it rectified accordingly to avoid delayed. Prepare final turn over of documentation to the client.
2.) Project: Juaymah Tie-in Project, Rastanura Saudi Arabia
Client: Saudi Aramco
Date: May 2005 to November 2005
Position: Mechanical/Piping Inspector
Review scope of work/contract, prepare test packages, receiving inspection for all mechanical and piping system materials, review mill test certificates conform as per purchase order request, assist NDT to comply project percentage requirement, review test packages and ensure all NDT were cleared prior to hydro test, witnessed mechanical erection pump alignment, ensure all materials were in good condition as well as preservation to prevent corrosions, Notify client for daily inspections, hold/witnessed hydro testing for piping systems, pumps/tanks final alignment Carried out all NDT requirements, and assisting third party to perform MPI, PMI, PT and x-rays for piping. Interpret x-ray film results and clearing all rejection prior to hydro test. Prepare test packages. Carryout Inspection in accordance with ITP, Prepare daily welding reports as well as monitoring weld joints rejection and have it rectified accordingly to avoid delayed. Prepare final turn over of documentation to the client.
3.) Project: Duba Marine Terminal Permanent Berth Project, Duba Tabuk Saudi Arabia
Client: Saudi Aramco
Date: April 2003 to December 2005
Position: Mechanical/Piping Inspector
I am involving welding activities, prepare notification inspection to Saudi Aramco inspector (Client). Ensure in implementation of approved PQR, WPS, ITP and project specification. Monitor daily welding activities, hold/witnessed hydro test, pumps and tanks final alignmen. Review NDT results as well as piping x-ray result interpretation. Initiate NCR if found none conforming to the project specification as well as corrective action reports. Attending weekly Meeting, Preparatory meeting, with regard to construction issues & implement remedial thoughts to avoid Project delayed Commissioning and start up. Co-ordination with client for inspection and documents. Preparation of Test packages, and weekly Contractor Quality Control Report. Maintain field Documents and drawings for quality records. Punch out inspection, Pre-final inspection final acceptance inspection. Make sure the work performed complies with the contractor requirements and quality procedure.
4.) Project: Haradh Gas Plant Project, Haradh Saudi Arabia
Client: Saudi Aramco- Client, main contractor by Technip
Date: September 2002 to March 2003
Position: Assigned as Field Engineer/Piping Inspector
5.) Project: Replacement of Electric Generators, Abqaiq Saudi Arabia
Client: Saudi Aramco- Client, main contractor by Technip
Date: June 2001 to August 2002.
Position: Piping Engineer/Piping Inspector
Duties: Assisting the team leader in Installation/erection for Piping system, Piping supports, steel structures, tanks and related mechanical activities can interpret Piping Drawing Flow diagrams piping detail for supports
Verification of plan and Isometric drawing for possible discrepancies and raised Technical information and have it approved prior to start the job. Perform pressure testing of aboveground and underground piping system, valves, equipment. Tanks and Conduct performance test for equipments and Prepare all test Packages. Initiate NCR for non conformance of the project specifications as well as corrective action reports.
Prepare daily progress report at any point of concern with remedial actions; participate in the planning of maintenance/inspection activities including shutdowns.
Attending weekly Meeting, Preparatory meeting, with regard to construction issues & implement remedial thoughts to avoid Project delayed Commissioning and start up. Co-ordination with client for inspection and documents. Preparation of Test packages, and weekly Contractor Quality Control Report. Maintain field Documents and drawings for quality records. Punch out inspection, Pre-final inspection final acceptance inspection. Make sure the work performed complies with the contractor requirements and quality procedure.
July 1999 to July 2000:
Mohammad Al Mojil Group of Company (MMG)
Project: KEMYA OLIFENS (Petro-Chemical Processing Plant) Al Jubail Saudi Arabia)
Position: Piping Inspector
Duties: Responsible for the inspection and witnessing of construction activities, ensure quality of the project will be implemented, ensuring that personal responsible for quality control are aware of and maintaining the project specification and that they are adhered throughout the project, managing the construction activity and quality of the project. Main tasked was to control construction material, Inspection of incoming material in line with client's requirements and approved specification. Initiate NCR for non conformance of the project specifications as well as corrective action reports, Conduct testing as per approved Inspection and Test Plan (ITP), maintain records including logs of all QA documentation, initiate project continuous improvement initiatives and ensure safe instruction will be implemented at site.
August 1994 to September 1998:
Atlantic gulf & Pacific Co. of Manila Philippines (AG&P)
Foreign Assignment (manpower supplied)
1.) Project: Renovation of Liquefied Natural Gas (Plant Phase 1&2), Skikda, Algeria from September 1997 to 1998.
Client: SONATRACH
Contractor: M.W Kellogg Company
Position: Piping Inspector
2.) Project: Renovation of Liquefied Natural Gas (Plant Phase 3&4), Skikda, Algeria from August 1995 to 1996.
Client: SONATRACH
Contractor: SOFREGAZ ( Societe' Francaise d' Etudes ET de Realisations d' Equipments Gaziers)
Position: Piping Engineer
3.) Project: LNG2 Renovation Project, Bethiua Algeria from July 1994 to May 1996.
Client: SONATRACH
Contractor: Pullman Kellogg Plant Services
Position: Piping Engineer
Duties: Responsible for renovation & maintenance as well as the quality control activities on the project, Co-ordination with client with regards to inspection of activities and in all aspects in addition to this site work execution, planning and implementation of ahead to schedule, Inspection, hold, & release for testing of valves, equipments, Tanks and piping system.
Preparation of test packages, provide and keep all technical documents for final turn-over by the client, supervision in execution of good workmanship standard of the project.
October 1987 to August 1994:
AG&P-Atlantic gulf & Pacific Co. of Manila (Philippines)
Local Assignment
1. Project: Manila International Container Terminal
Location: North Harbor, Pier 2 Manila Philippines
Position: Mechanical Fitter
Responsibilities: Assemble, lay-out, fit-up, and erection for fire water line, raw water supply line, HVACS, structural structure, performed hydro testing, and commissioning.
2. Project: Makati Commercial Center (32 floor High rise building)
Position: Mechanical Supervisor
Duties: Supervision works for HVAC's, Fire water line and plumbing works. Prepare daily progress report, assisting for testing, commissioning, preparing technical documentation for final turn over with the client.
3. Project: Honiron Fabrication shop Division
Position: Shop Engineer
Duties: Supervision on shop quality control monitoring and inspection to insure that the materials and workmanship conform with the clients specification and approved drawings, Supervise for assembling, lay-out, fit-up, for boiler, structural platforms and piping system, performed hydro testing, Fully aware of client codes and international standards, execute visual inspections, Non-destructive Testing on pressurized vessels, platforms structure steel, piping systems, etc. Provide technical document and keep all the NDT reports that have been performed with satisfactory results, Compilation of all record for reports for final turn over to the client.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 451 to 500 of 10916)
Go to Search Parameters...
Brief Description
Advanced Process Controls, RealTime Process Information Systems, LIMS
PROJECT MANAGEMENT, CORROSION & MATERIALS,INSPECTION & INTEGRITY ENGINEER/MANAGER
More than eighteen years of experience in premium International Oil and Gas Engineering Consultancy Companies within the field of Process Safety, Technical Safety and Loss Prevention.
Mechanical Engineer with expirience in Operation and maintenance. Can operates Forklift and Superstacker (Bureau Veritas Certified), Driving, Computer Literate, Auto cad.
well services, production technology, safety, beam pump
Licensed Professional Engineer, performance oriented, with extensive broad-based experience in multidisciplinary projects. Particular expertise in Instrumentation and Control Systems Engineering for Chemical and Oil & Gas Industries. Supervision of complex detailed Engineering and Procurement.
Highly experienced senior manager in exploration, new ventures, reservoir management and optimization of exploration and production portfolios in conventional oil, gas, and heavy oil. CEO and president level recognition for exploration and reservoir management results.
Engineering Document Management/Control
Reservoir Geologist  To perform characterization Reservoir integrated Studies and reservoir Modeling. Generation and evaluation Geological Prospects and development opportunities. Elaborate Exploitation Plans. Planning (targets) and monitor of Special Wells. Volumetric reserve estimations.
Seeking senior level assignments in Plant Operations, Project Management, Operations & Maintenance and Installation & Commissioning with a reputed organization.
Primavera, MS Project, MS Office, EVMS, Planning
Versatile technology professional with expertise as a Senior Reservoir Engineer and Operations Business Manager. Resourceful problem solver who performs well under pressure. Outstanding leadership, organizational, and communication skills. Granted Top Secret Security Clearance. Analytical.
More than 13 years of multi-international reservoir engineering experiences in gas and oil developments from sandstone and carbonate in land fields and offshore,including different stages of appraisal and development planning & management, well test, reservoir characterization & simulation, economic
SmartPlant 3D/P&ID Application support
I wish to apply for suitable position in the highly motivated & challenging environment. I am having 21 year of experience in different fields of Gas, Petroleum and Chemical industries. Also involved actively involved as an engineering material coordinator. I am having experience in identifying
More than 20 years experienced in project design services which involved mechanical and piping design preparation of conceptual design packages and detailed design packages, specification of pipes, fittings, valves and other specialties. Developed specifications for pumps, steam turbines, tanks, pre
Working as a field operator now. Worked as a pre-commissioning, commisiioning operator and as a chemist also.Pre-commissioning, commissioning activities, start up and shut down activities also.
Project / Commissioning Manager (Bachelors Degree / Professional Registrations)
Have more than thirteen years of experiance in log interpretation
A total of 15 years of professional work experience, (9) years in the Gulf region, of which seven years Were in the oil/gas, petrochemical, power/desalination plant and building construction projects. A Computer literate and proficient in oral and writing English communication skills.
Senior Financial Analyst with a background in IT and Finance. I have experience in JDE world, JDE one world and SAP System Accounting software. I have enhanced my knowledge in SAP, being involved with the system conversion from JDE to SAP at UFA from July 2006 to August 2008.
Experienced exploration/wellsite geologist
Geophysicist position in a oil-field services company. I have more than 18 years of seismic data processing and data management experiences.
Welding Inspector, CSWIP 3.2, ASNT-II Certified, 18 Years working experience in Oil and Gas Industries in various countries.
Has 20 Years Expeierence in various aspect of Control and Automation and last 7 years in Middle East with ABB /Invensys. Has done large projects and several latest DCS/ESD systems such as Triconex,ABB infi90 , Foxboro I/A , Honeywell TDC3000 etc
I am qualified Degree chemical Engineer from the reputed Maharaja Sayaji Rao Uni, Vadodara
I’ve total of Eighteen (18) years experience in the area of Pipeline design and Piping design for oil & gas and petrochemical projects.
Over 30 years and broad range of experience in oil and gas exploration. Bachelor degree Geophysics/ Geology and MSc degree in Geophysics. Worked in most aspects of exploration, such as seismic survey planning, acquisition, data processing, interpretation, AVO, seismic attributesand seismic inversion
M. Sc. & B. Sc. in Computer Science, USA. Detailed knowledge and practical experiences in general maangement, performance management, Balanced Scorecard, and project Management. Having solid background in IT and business communication.
Expertise in gas sweetening, gas compression, gasification process, and U&O facilities.
Over 16 years experience as Electrical Engineer
I have been a Process Engineer for 16 years. My experience includes process design of oil, gas and petrochemical plants and steam and power generation units, expertise in conceptual design, basic design, FEED and detailed engineering, experienced also in optimization and troubleshooting projects.
Over 20 years experience in chemical, petrochemical and oil&gas industry.
B.Sc. Chemistry degree and having 25 years experience in petrochemicals and refinery in process department
Presently working as Sr APC & Opt Engineer in Qatar Petroleum Refinery. A total of 20 years experience in Petroleum Refinery industry (8 years in APC & Opt, 5 years in Technical Services and 7 years in Operations).
I have extensive experience in Oil&Gas industry and EPC, I have extensive experiencey in Rotating Equipments Design and I worked in a refinery in Egypt as the Head of the Rotating equipments for 14 years.
Having achieved many goals in my long career how MECHANICAL ENGINEER, I am interested in continuing my professional horizons by working as a FLEXURAL STRESS AND MECHANICAL PIPING DESIGN AND LEADING MECHANICAL ENGINEERING PROJECT for your respectable company.
To support and promote a positive safety culture.
Procurement/Purchase/Buyer Experience in SAP R/3
To provide technical expertise of piping, mechanical engineering for Oil & Gas, Petrochemical, Power plant. Support to projects management, Supply division and projects controls through all phases of major and minor projects
Process Design Engineer with experience o fEPC contracts in Saudi Arabia. I also have expereince in operating plants, providing plant support. I am currently working as Technical Manager of 20 process engineers, doing small projects execution for Sasol Infrachem Utilities.
Seismic interpreter and reservoir geophyscist with experience in reservoir modeling, geostatistics and rock physics
An experienced Control & Instrumentation Engineer with extensive achievements in leading, designing, executing, and organizing project activities for process industries, e.g. oil/gas refineries, chemical/petrochemical complexes, Power plants, steel and copper industries.
Contract management Specialist
Accomplished PLC, HMI, automation, programmable controls specialist
A Production Engineer with over 25 years of oil and gas field experience in domestic and international operations. Solid record in building project teams in multidiscipline and multilingual work groups. Strengths include planning, organization, and communication.
15 years of experience in PDP/FEED/Detailed Engineering and Construction support in Petrochemical/Chemical industry. Extensive experience with Pressure Vessels (ASME Boiler and Pressure Vessel Code: Sec. VIII, Div. 1/2), Piping (B31.1/31.3), Above Ground Storage Tanks (API 620/API 650)
Chemical process/project engineer, small projects manager
operation manager
I have a wide variety of experience in the field of heavy equipment management (maintenance, operations & repairs) in construction, petrochemicals, transportation, logistics and other related field.
First
1
2
3
4
5
6
7
8
9
[ 10 ]
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com