Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #86187 next resume »»
CONTACT INFORMATION:
View contact information...

GOLDEN EAGLE REFINERY, Martinez,California 2001- present
Project Manager
* Managed engineering, procurement and field construction activities performed by an E&C firm. Projects comprised of a new 23,500-BPD Naphtha Hydrotreater, new 250,000 Lbs/Hr Boiler unit, new splitter unit and associated tie-ins during early turnaround phase.
* Completed the installation and start up of the new 600 Lb boiler to support steam demand during early turnaround phase.
* Selected the Hydrotreater Licensor.
* Worked with the contractor and operations personnel to define onsite and offsite scope of work.
* Approved the design basis document.
* Evaluated capital and operating costs for various process options.
* Selected plot locations for the Hydrotreater and the Boiler units. Performed an economic evaluation on each location.
* Attended design reviews and approved PFD's, P&ID's and Plot Plans.
* Completed the blast study for the new Hydrotreater. Evaluated the hydrotreater blast impact on adjacent buildings and units.
* Obtained Air District and Land Use permits for the new units.
* Approved design data sheets and bid-tabs.
* Reported project progress to management.
* Selected and negotiated with sub-contractors.

AMOCO CHEMICALS, Houston, Texas 1997- 2000
Lead Project Engineer
* Managed engineering, procurement, cost and scheduling activities on the $300 MM grassroots Prairie Rose Alpha Olefins project, Alberta, Canada. Managed the work performed by an E&C firm.
* Approved process and mechanical data sheets.
* Approved equipment specifications and bid-tabs.
* Approved the design basis document, PFD's, P&ID's and Plot Plans.
* Approved FEL estimate, scope of work and discipline drawings.
* Worked with Amoco and contractor personnel in developing a project schedule.
* Ensured compliance to Amoco specifications.
* Completed a number of studies to reduce project cost.
* Participated in a Hazop study involving a 150 P&ID's.
* Approved purchase orders.
* Attended the contractor weekly progress meetings.
* Brought about consensus between Amoco specialists, operations and contractor personnel prior to proceeding with work.
* Trained other Amoco project engineers on the Alfa Olefin process and held weekly training sessions.

TRANSAMERICAN REFINERY CORPORATION, Norco, LA 1995 - 1997
Project Manager
* Managed engineering, procurement, field construction and start up activities performed by multiple contractors. Projects comprised of utility and offsite projects associated with all the refinery units. Installed new pump stations, pipelines, clarifiers, deminilarizers,storage tanks, boilers, deaerators, air compressors, piperacks, unit interconnect piping, heavy haul roads, Barge and ship dock facilities.
* Coordinated the work performed by multiple contractors
* Approved process design and sizing basis for each utility plant.
* Developed and negotiated a contract document.
* Developed preliminary estimates for project funding.
* Approved project budget and schedule.
* Approved contractor estimates and proposals.
* Chaired design review meetings with contractor and refinery personnel.
* Approved key drawings and documents.
* Approved payment to the contractors.
* Obtained management approval on project funding.
* Competed a number of projects within budget and schedule.
* Made weekly progress reports to management.
* Implemented the OSHA process safety management and the EPA risk management plans.

ABU DHABI NATIONAL OIL COMPANY, Abu Dhabi, U.A.E 1992 - 1994
Senior Project Engineer on the Jar Yaphour Field development project.
* Project comprised of 4 wells, flow lines, 18 inch-36 KM pipeline and grass roots upstream production facilities.
* Managed engineering, procurement and construction activities performed by an international EPC firm.
* Managed liaison and interface with various Adnoc and government organizations.
* Completed the project within budget and schedule.
* Reviewed contractor deliverables with specialists from the engineering development division and project control division.
* Compiled a list of comments to contractor deliverables for implementation and incorporation into design.
* Attended weekly contract and purchase committee meetings.
* Reported project progress to management.
* Evaluated and selected sub-contractors.
* Chaired weekly construction coordination meetings.
* Supervised field supervision and QA/QC teams.
* Ensured compliance to contract document.
* Coordinated pre-commissioning and start up effort.
* Approved change orders.
* Approved payments to contractor
* Approved certificate of completion.
Project Manager on the Madinet Zayed Gas Pipeline Project.
* Managed engineering and field construction activities involving an expatriate supervision team and a construction contractor.
* Project comprised of a 12-inch gas transmission pipeline through desert sand dune terrain, control room facilities, pigging facilities, gas filtration, custody transfer metering and Scada system for remote operation.
* Completed work within budget, 3 months ahead of schedule.
* Evaluated and selected a local contractor.
* Supervised design reviews and chaired weekly meetings.
* Supervised the field construction, pre-commissioning and start up work at site.
* Handed over project documentation to operation personnel up on project completion.
* Ensured compliance to Industry codes, standards and company specifications.

RALPH M PARSONS, Pasadena, California 1991-1992
Lead Project Engineer
* Project comprised of ARAMCO's southern area oil&gas production facilities expansion, Uthmanieh seawater treatment plant expansion and Hawieyah water injection facilities.
* Led the preparation of the $400 Million ER estimate.
* Led the Parson team in preparing the estimate and held weekly reviews with ARAMCO project team.
* Supervised the preparation of the project impact assessment study by a Parson's subsidiary Engineering science.
* Coordinated the work performed by a multiple discipline team of engineers, cost, and schedule and procurement staff.
* Attended weekly project meetings, design reviews with ARAMCO specialist, operations and project team.
* Implemented ARAMCO project team comments into design documents.
* Prepared change orders for ARAMCO review.
* Obtained ARAMCO approval on 50,000 man-hours.
* Resolved conflicts with the ARAMCO Design Basis Scoping Paper (DBSP).
* Ensured compliance to ARAMCO specifications. Obtained approval on Waivers from specifications.
* Prepared sub-contractor bid packages.
* Approved man-hour estimates and discipline budgets.
* Ensured compliance to the project schedule. Reviewed the Primavera level 4 with disciplines and project control personnel.
* Reviewed and approved the construction contractor (LSPB) scope of work.

C.F.BRAUN, Alhambra, California 1989 -1991
Senior Project Engineer on the 335,000-BPD Citgo Refinery upgrading project, Lake Charles, Louisiana. Led the scope development, detail design, procurement, cost, scheduling and remediation permitting activities. Other responsibilities included preparation of construction bid package Documents, followed through with construction to project completion. Work involved expansion and upgrading of Coke unit, Tame unit, Butane handling, C5 treating and storage facilities.

Project Engineer on the Chevron El Segundo Refinery upgrading project. Work included a number of offsite projects involving loading rack relocation, storage and pumping facilities and process modifications. Managed multiple discipline engineering activities. Completed a number of projects within budget and schedule.

Project Engineer for the 1.5 billion/ lbs. per year grassroots ethylene plant for Phillips Petroleum, Sweeny, Texas. Responsibilities included coordinating engineering activities and overseeing the review and analysis of 300 P&lD's. Conducted Hazop Studies, prepared a design hazard review report for implementation and incorporation into design during the detail-engineering phase of the project.

DM INTERNATIONAL, Houston, Texas 1981 - 1988
Project Engineer on the $500 MM grassroots refining and gas-processing project, Adelaide Australia for Santos. Responsible for multiple discipline engineering activities involving supervision of conceptual design, detail engineering, procurement and project control activities.

Equipment Engineer on the $600 MM grassroots gas processing plant Bakersfield, California for Southern California Gas Company. Responsibilities included project-engineering activities, monitoring procurement of capital equipment, specification design, inquiries, bid evaluation of process and rotating equipment.

AMOCO INTERNATIONAL OIL COMPANY, Kharg Island 1976 - 1981

Facilities Project Engineer on the 200,000 BPD onshore - offshore production facilities for Amoco International Oil Company at Kharg Island. Facilities comprised of offshore production fields, production platforms, floating production systems, onshore plants, storage, and pipeline and loading facilities. Completed engineering and construction on a number of projects involving expansion and modification to surface and downhole facilities. Supervised various engineering and construction activities in the field.

PERSONAL: Single, US Citizen, Excellent Health, Multiple Language Capability, available for travel and relocation to domestic and international assignments.

References: Available upon request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 251 to 300 of 10907)Go to Search Parameters...
Brief Description
Sr Piping Designer Oil & Gas 3D model
Project management
20+ years experience in Surveying
Senior Planner with more than 20 years experience in Oil & Petrocehmical Industries
Qualified professional Project Manager and licensed US chemical engineer, with 32 years oil and gas and refined products production and processing facilities, pipelines, stations and terminals.
Piping Engineer/Designer
About twenty years' professional experience as a Commissioning and as Front line Operator in LDPE plant in RIL & LLDPE Plant in YANSAB with strong educational background and training.
Presently working as Drilling Manager with Transocean started up the project in India for 5 Jackup rig for ONGC along with Tony Flynn who was than our GM -Integrated services in May 2006. Direct responsibility is managing T12 and JTA ( 300' Jackup)on day to day coordination, planning and execution
AutoCAD drafting, Drawing, Painting (Acrylic, Oil, Water Color), Airbrushing, Faux Finishing, Murals, and Computer Graphics /Illustrations. Software: Adobe Illustrator, Adobe Photoshop, Adobe Streamline, Adobe 3D, Flash, Fractal Painter, Quark Xpress, Microsoft Word, Power Point and various scanning
Instrumentation, Control and Safety Systems Design Engineering - Projects
A Professional Engineer with over 18 years' experiences in Process Control Systems for the design, development & implementation of process control applications, oil storage, movement & blending applications and process training simulations. Extensive knowledge in Honeywell Distributed Control System
(Maintenance with Procurement Exposure)
Initial four (4.0) years of Detail Design experience is in the field of Civil and Structural design of various Multi storey Buildings, Bulk drugs (Ranbaxy Module 5), Auto Industry, Chemical industry, Oil & Gas, Captive Power Plants, Machine Foundations, including Sub & Super structures for various i
Instrumentation and control engineer and instructor Phd neural fuzzy modelling and identification, optimization using genetic algorithms
21 years experience in corrosion engineering, monitoring and applying corrosion mitigation strategies to oil/gas/petrochemical industry. Detailed experience in cathodic protection (CP), pipeline integrity, chemical treatment, corrosion monitoring, coatings and corrosion/mechanical damage assessment.
21 Years Experience of Process Engineering in Refinery/Oil & Gas
A geologist currently working with a major oil companies, specialized in reservoir characterization, formation evaluation, operation geology and geosteering in clastic reservoirs. Develop expertise while working in Australia, Saudi Arabia, North Sea, India and several other international projects.
To be fair to everybody. Shared gain knowledge¡¦s and experienced for the benefits of all and to obtain a position with a progressive company that will utilize my experience, broaden my Knowledge, and offer opportunities for advancement.
Possess a career that spans for over 25 years within the Oil & Gas, Construction, Operation and Maintenance and Manufacturing Industries, performing contract formation and administration work.
Specialised in the design and structural engineering calculations for high integrity mechanical handling systems up to 25,000 tonnes SWL.
26 Years land and project management experience
Oil & Gas Volume Professional
B.E(chemical from dharwad karnataka)
Free! 19 years experience in Production Engineering, Production Operations, workover and service rigs for Artificial Lift equipment, operations supervision and administration.
CHEMICAL ENGINEER HAVING TWENTY FOUR EXPERIENCE IN PETROCHEMICALS MANUFACTURING
34 years experience in Project management, plant construction, commissioning, maintenance, and inspection, with knowledge of Permit to Work systems, experience at man management and engineering levels, and multi discipline supervision. I communicate well on all levels technically & professionally
I have been working for Shell for about 21 yrs now. I joined Shell as a wellsite peterolem engineer in August 1988. Before then I worked for 4 years in Gas and steam electric generating station rising to the post of senior mechanical engineer. I have a Bachelors degree in Mechanical Engineering
Worked as Prod. Sup. /Sr. Prod. operator in FPSO, Gabon/Angola, Al Furat Petroleum Company, Syria, Petroleum Development Oman and Madras Fertilizers Ltd (Urea process plant), India. Have 32 yrs of exp. in operation and commissioning of oil/gas facilities.
Project Controls Engineer, Cost and Schedule, 1984 Civil Engineering graduate
A challenging position as a Geophysicist which will provide an opportunity to use my geophysical skills.
Wide range of experience in Oil & Gas Subcontracts preparation, evaluation and administration.
Revenue, Gas Accountant, Gas Balancing, Scheduling, Marketing
37 years in oil & gas land, seeking contract or perm, willing to relocate
Work Experience. 30 years experience in HR administration in government service, 2 years experience as HR Officer in a political party office and 6 months experience as HR officer in a large oilpalm plantation.
I am a team player and enjoy the challenges every project brings. I am also very capable of independently completing and working on projects alone. I have been involved with a variety of projects, and taken many of them either to IFC or as built stage as required.
Have 20+ years of Accounting experience in refinery, both at corporate and plant level. Held various positions and looked for opportunities to accept additional duties and advancement.
Petroleum Engineer with a solid management experience in Mexico, Latin America, UK and Canada. With specific strengths: leadership, teamwork, customer focus, integrity, marketing and sales and build key accounts. Very good knowledge of PEMEX, Petrobras and NOC's.
Completions/Workovers Operations Manger/Engineer
Over 18 years Oil and Gas experience and have been involved at all levels of conceptual, Front End Engineering, Detailed Design and operational support
Having more than 18 years of working experience as a Wellsite geologist, Mudlogger in Oil & Gas, Geotechnical investigation, Hydrogeology, research & Management. Worked on horizontal, directional & vertical wells for conventional & oilsand coring projects, to examine & describe drill cuttings.
Workover and completion operations engineer
Sr.Staff Geophysicist with more than 35 years of oil industry experience. Generated drilling plays in several basins around the world (Canada, Egypt, Oman, Libya, UAE, Cameroon (Offshore. Structural & Stratigraphic plays. Also overthrust belt experience in Oman & Foothills of Alberta.
Bachelor Science degreed as Civil Engineer with 23 years of professional experience in different job positions in petrochemical, fertilizer, power plant and open coal mine, related with design, engineering, construction and maintenance of reinforced concrete structures and steel structures.
Engineer - Geologist of Oil and Gas Exploration
I would like to apply for a position as Chief Engineer / Maintenance Supervisor with your company where my experience, training and good work habit will be asset to your company. The attached resume covers my 33 plus years of offshore / oilfield / maritime experience as Maintenance Engineer
Astute result-oriented professional with over 28 years of experience (an EPC background with major international contractors, where the work involves execution of a multi-disciplined Engineering Design, Procurement, Construction and Commissioning service especially in OIL & GAS FIELD) in project man
Specialist in Offshore Installation Inspection in Mechanical & Piping
Sr.Planning Engineer / B S Mechanical Engineer / Diploma in Mechanical / Certified PMP / Primavera 3.1, P5E, P6E, MS Project, MS Office
I have extensive training and experience as an HSE QC in land seismic acquisition. My formal education includes a BA in Science and Arts and a Diploma in Srurveying Eng. My HSE Qualifications include a both Diploma in HSE Management and Environmental Management from the British Safety Council .
Piping detail and design
First   1   2   3   4   5   [ 6 ]   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com