CONTACT INFORMATION:
View contact information...
EDUCATIONAL BACKGROUND
1991 – 1994 Senior High School
COURSE DEVELOPMENT
2009 ASME B31.3 Piping Process by DAP Cosultan Jakarta
Profesional Maritim,oil & gas and Offshore Engineering Vocational School & Training " KIAT GLOBAL BATAM "
Module:
1) Basic Application of welding
2) Various of Welding ( SMAW, GMAW, GTAW, FCAW, SAW )
3) Welding Metallurgy Theory.
4) Corrosion, Protection and Coating
5) Welding design
6) Visual / Inspection ( Inspection of Welding Theory, practical and Field Study Tour)
7) ANSI B31.3 ( Chapter I, III, V & VI )
8) Oil & Gas Industries Instrumentation, assembly, installation and inspection
Certification
ASME B31.3 Piping Process Training, certified by DAP Consultan Jakarta Cert.No.DAP.01.2009.KGBS.PP786
PERSONAL STRENGTHS
Excellent analytical.
Enthusiastic and Hardworking to Excellence in Work.
Good interpersonal and communication skills.
Good in supervise of a team.
SKILL & KNOWLEDGE
Computer
Able to operate Microsoft Office Aplication
Mechanical
Good knowledge of piping and pipelines maintenance activity.
Able to supervise of a team for build teamwork, educate, skill and spirit.
Able to identify the abnormal condition of piping equipment.
Understand isometric and all the piping system drawing.
WELDING
Good knowledge of Visual welding inspection.
Hand on qualified for welding process and defect of welding process.
Preparation some welding yard problem for method statement, site query, technical query. Inclusive for material compliance for client specification.
WORKING EXPERIENCE
Nov 2006 - Present CONSTRUCTION COMPANY ( Shipbuilding ), PT. MMI Indonesia, located at Batam, Riau Islands – Indonesia.
Project: 20 system for new building OF SUPPLY VESEL for offshore oil platform supply vessel (mosvold and DNV class).
Position: PIPING Supervisor
Job Description:
Organises and controls the correct performance of the construction and assembly work, assisting the piping engineer in the management for correct performance of the mechanical works ensuring full compliance with safety and quality standards and procedures
Main duties:
Carries out the work in the planned times and costs
Applies the final, procedures approved by the client
Ensures observance of the project specifications
Ensures that safety and quality standards are respected
Prepares and co-ordinates the detailed programmes for the correct management of the works of one's specific responsibility
Supports the piping engineer in solving technical and management problems encountered in the area of responsibility
Manages the technical and administrative documentation of expendable and assembly material
Manages direct and sub-contracted work
Manages human and technical resources, indicating any needs and surplus in good time
Ensures that production quality and quantity standards are observed
Ensures that safety standards are observed and guarantee the quality of the work
Assists with the hand-over of completed works
Measures the works carried out with the Works Director and sub-contractors'
representatives
Supplies the elements needed to draw up the accounts
Assists with the demob of the site (shipment of material and equipment, solution of any outstanding questions).
Check and review Piping Plan, Support Plan, and Penetration Plan.
Check and review Piping Diagram.
Prepare Detail of Support Drawing.
Prepare As Built Drawing.
Make Weekly report to direct project manager.
Nov 2005 – Oct 2006 CONSTRUCTION COMPANY ( shipbuilding), CV.Burangrang located at Batam, Riau Islands – Indonesia.
Position: Piping foreman
Main Duties:
Check and review Piping Plan, Support Plan, and Penetration Plan.
Check and review Piping Diagram.
Prepare Detail of Support Drawing.
Prepare As Built Drawing.
Make Weekly report to direct Supervisor.
To ensure fabrication work is in line with applicable quality, technical standard and company instruction.
To ensure fit up and welding compliance with specification ( AWS D.1.1, ABS grade 60, and Loyds Standard, AICS standard)
To ensure and monitoring welding consumables are correct handling and used refer to the specification requirement.
Interacts with fabrication project team for progress, project problem ( welding defect, NDT fail, material spec, etc) Specification applicable, spec, interpretation)
Carry out material trace ability record and compliance with Company approval and specification and relevant standard.
Undertake visual inspection works of welding to ensure compliance with specification
To ensure all standard implementation in fabrication are compliance.
Review AFC drawing and ensure the last revision was applied at fabrication and erection area.
Review and verify as built drawing and final documentation
Aug 2003 – Aug 2004 CONSTRUCTION COMPANY ( shipbuilding), PT. Toyo kanetsu,located at Batam, Riau Islands – Indonesia.
Position: Piping leader
Main Duties:
Check and review Piping Plan, Support Plan, and Penetration Plan.
Check and review Piping Diagram.
Prepare Detail of Support Drawing.
Prepare As Built Drawing.
Make Weekly report to direct Supervisor.
To ensure fabrication work is in line with applicable quality, technical standard and company instruction.
To ensure fit up and welding compliance with specification ( AWS D.1.1, ABS grade 60, and Loyds Standard, AICS standard)
To ensure and monitoring welding consumables are correct handling and used refer to the specification requirement.
Interacts with fabrication project team for progress, project problem ( welding defect, NDT fail, material spec, etc) Specification applicable, spec, interpretation)
Carry out material trace ability record and compliance with Company approval and specification and relevant standard.
Undertake visual inspection works of welding to ensure compliance with specification
To ensure all standard implementation in fabrication are compliance.
Review AFC drawing and ensure the last revision was applied at fabrication and erection area.
Review and verify as built drawing and final documentation.
Dec 2002 – may 2003 CONSTRUCTION COMPANY, PT.Shiane International, located at Batam
Position: Senior fabricator
Project: Djan De Nul (DJN) logistic batam plant
Mar 2000 – Mar 2001 CONSTRUCTION COMPANY, PT.Elang Sakti Persada, located at Batam
Position: Pipe Fitter Fabricator
Project: Dredging International Asia Pacific (DIAP)
Nov 1999 – Jan 2000 CONSTRUCTION COMPANY, PT.Heat Exchanger Indonesia, located at Batam
Position: Pipe Fitter Maintainance
Apr 1999 – Oct 1999 CONSTRUCTION COMPANY, PT.S H L Marina, located at Batam
Position: Pipe Fitter I
Project: Repair & Shipbuilding.
Jun 1998 – Apr 1999 CONSTRUCTION COMPANY, PT.Truba Jurong Indonesia, located at Lhokseumawe Aceh.
Position: Pipe Fitter
Project: NSO "A" Project field Development PT. ARUN Indonesia
June 1997 – Dec 1997 CONSTRUCTION COMPANY, CV.Muara Dua, located at Batam
Position: Pipe Helper
Project: ARUN LNG Plant, Lhokseumawe Aceh.
View contact information... |