Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #86757 next resume »»
CONTACT INFORMATION:
View contact information...

EMPLOYMENT HISTORY

Jun 09 – Present Saudi aramco (Futureware)
Senior Drilling Specialist

Working for Saudi Aramco, Dharhan, based in the drilling and workover department supervising the RTOC (Real time operating Centre) monitoring up to 8 wells in real time to observe for drilling/tripping problems. This knowledge is added to the growing data base to provide feed back to the Aramco drilling department encouraging good drilling practices and to improve well planning for future wells.

Mar 09 – Apr 09 Moorland Energy Ltd
Senior Wellsite drilling supervisor

Working for Moorland as a relief Supervisor on a deviated production well at Ebberston Moor, North Yorkshire (onshore). Performing a DST for formation/reservoir evaluation and suspending well using Edeco 28 drilling rig

Mar 09 - Providence Resources
Senior Wellsite drilling supervisor

Working for Providence as a relief Supervisor on a horizontal production well at Singleton well site (onshore near Chichester, Sussex) using Drillmec rig

Mar 09 - Entrac Ltd
Drilling mentor for trainee engineers

Working for Saudi Aramco as mentor for fast track trainee drilling engineers on three well sites in Saudi Arabia

Dec 08 – Feb 09 SPD -Serica
Offshore Drilling supervisor

Based on the Energy Enhancer in the Block 48/16 (North Sea) as Senior Drilling Supervisor. Responsible for operations and reporting direct to SPD rig superintendent
Working on Chablis 48/16b-3 and 3z exploration/appraisal well.

Sep 08 – Dec 08 Total
Offshore Drilling supervisor

Based on the GAII in the Block 8 (North Sea) as Senior Drilling Supervisor. Responsible for operations and reporting direct to Total rig superintendent. This work was done without an offshore logistics controller.
Working on Sailor exploration/appraisal well.

Jul 08 – Sep 08 PROVIDENCE RESOURCES
Offshore company Representative

Based on the GAII in the Irish Sea as Senior Drilling Supervisor. Responsible for overseeing all ADTI operations and reporting direct to Providence management.
Working on Hook Head and Dunmore fields, appraisal wells.

Sep 07 – Jul 08 AGR PEAK WELL MANAGEMENT
Day Supervisor

Based on the Ensco 85, Working on Ensco 85 as Day supervisor drilling a well for Sterling Resources and Ensco 100 drilling for DANA, Bridge, and Silverstone in the Southern North Sea. Supervision of all drilling activities. Sub sea well completions, horizontal composite trees, coiled tubing operations, Nitrogen stimulation, deviated well and challenging well designs. Completed the first successful large scale proppant fraccing job from a jack up rig in the Southern north sea.

Aug 07 – Sep 07 PROVIDENCE RESOURCES LTD (via Frontier)
Company Representative

Was on rig to supervise Turnkey drilling and testing programme on the Petrolia semi submersible rig off the Southern coast of Ireland. Turnkey operations were being run by ADTI.

Jul 06 – Jun 07 FIRSTDRILL LIMITED, BOURNEMOUTH
Senior Drilling Engineer

Worked on various projects based in Bournemouth but travelling to client offices as required. Included BP Aberdeen planning a workover programme for the Miller platform from inception to the signed off Basis of design stage, (this project was part of a much larger project to allow re-injection of waste CO2 from onshore sources into offshore reservoirs), initial planning for several onshore wells in the south of England onshore and working for Gazprom Venezuela in Caracas identifying contractors for tendering process, issuing tenders and evaluation of prospective contractors prior to issue of contracts for an offshore drilling project in Venezuela.

Oct 05 – Jun 06 TULLOW OIL AND GAS
Day Drilling Supervisor

Worked on Ensco 101 as Day supervisor. Supervised and supported / trained Night Supervisor during drilling Production from Schooner platform. Very complex, technically difficult wells that caused Shell big difficulties in the past. Co-ordinated drilling work with concurrent Wellservices, Wireline, coil tubing, well testing on Schooner platform. Worked with LTOBM using zero discharge policy, skip and ship etc.

Mar 05 – Oct 05 CENTRICA, NORTH SEA
Night Drilling Supervisor

Worked on Ensco 101 as Night supervisor. Supervised and supported Day Supervisor during drilling extended reach well from platform situated in high profile area close to the coast. Very high ratio well profile (in the region of 4.5:1) required specialised casing and geo-steering techniques. This well was recognised by all involved as very successful in all aspects. Completed an appraisal well in block 42 for Centrica through potentially difficult southern North Sea lithologies. Completed an exploration well in Southern North Sea close to Flamborough head (Prmetheus). Performed most of the drilling engineering activity on the rig during these wells.

Jan 05 – Mar 05 BHP BILLITON, LIVERPOOL BAY
Night Drilling Supervisor

Worked on Ensco 85 as Night supervisor. Supervised and supported Day Supervisor during workovers and production sidetracks on Lennox platform. Technically challenging wells with high H2S, complex completions in high profile area close to the coast. Very high priority on safety and team building as well as continuous improvement processes.

Sep 04 – Jan 05 WOODSIDE ENERGY
Various

Dec 04 – Jan 05 Senior / Day Drilling Engineer, Mauritania

Worked in Nouakchott office for Woodside, set up lessons database and worked on end of well reports, then offshore as Day Drilling Engineer on development wells in Chinguetti field. Subsea template conductors and surface casing setting. Technical and operations support to Day shift drilling supervisor. Rig was 5th generation DP drill ship with twin ram derrick. Water depths varied between 700 and 1700m.

Sep 04 – Dec 04 Night Drilling Supervisor / Drilling Engineer

Worked as Night Supervisor / Drilling Engineer on development wells in Wanaea / Cossack / Lambert field, in water depths of between 450 and 650m. (Subsea completions). Provided technical and operations support to Day Shift Drilling Supervisor while drilling and testing wells. Mentored Woodside Junior Engineers. Supervised Wellservices and contractors during Subsea completion and testing operations. Used "Open wells" reporting system as well as Woodside management tools for safety, performance etc. Was actively involved in leading and promoting Woodside safety and performance initiatives.

Jun 04 – Aug 04 OILEXCO / PEAK J W MCLEAN, NORTH SEA
Night Drilling Supervisor

Worked as night supervisor on Oilexco exploration well. Technical and operations support to Day shift drilling supervisor while drilling and testing well. The well was successfully drilled, completed and tested with Subsea completion.

Jun 03 – Jun 04 CNR INTERNATIONAL, ABERDEEN
Night Drilling Supervisor

Worked as night supervisor on all CNR's platform projects. Sidetracks, Coiled Tubing drilling and clean outs, workovers. Supported Day Shift Drilling Supervisor in all aspects of modern oilfield practices.

Feb 03 – Jun 03 DONG, DENMARK
Night Drilling Sup / Senior Drilling Engineer

Worked onshore drilling rigs (PT61). Supervised night shift on onshore geothermal well. Provided onsite training and helped with newly started dayshift drilling engineers. Ran operations with wellsite team on nights. Wrote entire daily report. Wrote wellsite instructions. Maintained and coached continuous improvement process.

Nov 01 – Feb 03 NAM, NETHERLANDS
Senior Drilling Engineer / Night Supervisor

Worked on onshore drilling rigs (ITAG 23 PT 46) and Offshore (Noble George). Supervised night shift on onshore HTHP exploration well and thereafter on production drilling and workovers. Provided on site training and supervision of newly hired Shell and NAM drilling Engineers on a regular one to one basis.

Aug 01 – Nov 01 BP AMOCO, WYTCH FARM
Senior Drilling Engineer

Employed at Wytch farm as senior drilling engineer, initially to work in the Gathering station office to programme operations for the B41 (and T65 as required). Worked on various projects associated with the infill drilling programme and workovers. Supervised and carried out weekend duties. Safety and performance auditing. Well planning and reviews.

May 01 – Jul 01 TALISMAN ENERGY, UK
Nightshift Supervisor / Drilling Engineer

Employed on Clyde platform. Supervised all aspects of platform drilling operations to compliment Talisman Company Representative as required.

Aug 00 – May 01 DEUTAG UK LIMITED
Offshore Technical Limits Coach

Worked on BP Forties as Offshore Technical Limits Coach. Involved in all aspects of continuous improvement in Technical Limits process. Coached offshore team at all levels in Plan, Do, Measure, Learn Process. Liaised with BP office team on a regular basis.

Nov 99 – Aug 00 DRILLING SYSTEMS (UK) LTD
Drilling Engineer

Drilling / Petroleum Engineer, worked with drilling and well control training Simulators, portable up to full size. Demonstrated simulators to customers at the factory and on site after delivery. Trained customers personnel on range of simulators. Trained and provided technical back up to in house programmers. Rewrote company training manuals to utilise simulators for drilling and modern well control training, (e.g. deep water, volumetrics, workover well control).

Nov 96 – May 99 NAM, NETHERLANDS
Drilling Engineer

Worked on onshore drilling rigs (Deutag PT52 and PT 46). Supervised all normal (and abnormal) drilling in Northern Holland, Drente, Groningen. Horizontal wells and completions for gas (sweet and sour) and oil wells. Workovers. Was responsible for well site training and supervision of newly hired Shell, NAM and Deutag drilling engineers on a regular one to one basis. Worked on the PT 52 and PT 46. Both rigs used to test new technologies for NAM – both surface and subsurface equipment. e.g. Thule shaker load control systems. First successful run of Petroline Expandable sand screens in 5 7/8" reservoir section. First successful run of Shoe track conveyed logging tools run on a 9 5/8" casing string. Monitored new bit technology. Reviewed drilling and completion programmes initiated from the NAM / Prostar office. Carried out reports writing and presentations for post well analysis.

May 94 – Nov 96 DEUTAG OVERSEAS LTD
Drilling Engineer

Worked on Shell's Brent platforms as part of the WIN 90s team. Was responsible for supervising all well related activities on the platform. Work included implementation of drilling programmes, planning, producing written wellsite programmes etc. Worked on Brent Alpha, Charlie and Bravo. Workovers, long reach and horizontal wells.

Jan 91 – Apr 94 SHELL EXPRO
Drilling / Operations Engineer

Responsibilities included supervision of implementation of all drilling and workover activities on platforms and semi's in the Northern fields. Worked with most up to date long reach and horizontal well technology, drilling, completion and workovers. Drilling examples include; TA-09 - long reach with Petrofree mud system, TA-13 - Horizontal using Geosteering techniques and IEOM. Completed under budget and ahead of time CN - 32. CN - 36 - both long reach with OBM Gannet and UMC - High-pressure wells. Subsea completions, gravel packs, TCPs and DSTs. Single and dual gas lift well completions, water injection completions with both Cameron and FMC wellheads. Supervised Schlumberger and Atlas Wireline, both open hole and production logging, "SAFE" perforating gun systems, PES plug setting. Workovers including tubing replacements, re-perforations, Slickline campaigns and casing patches. Worked as relief drilling engineer. Trained all Shell Drilling Engineers. Operations / Project Engineer responsible for all operations including well planning, preparation of drilling instructions and drilling engineering projects. Liaised with office-based personnel in operations, reservoir engineers, exploration-lists and well technologists to fulfil drilling and production expectations. Project work in the Aberdeen office as required on training and high pressure casing design programming tools. Worked as drilling engineer co-ordinating sub contractors for BP operations West of Shetland on the Sovereign Explorer.

Nov 90 – Jan 91 TEXACO UK LIMITED
Wellsite Geologist

Worked on semi-submersible rigs (Borgny Dolphin and Henry Goodrich) around Block 15 in the Central North Sea on exploration wells.

Feb 89 – Oct 90 NAM, NETHERLANDS
Operation / Project Engineer

Was responsible for wellsite operations including well planning costing, and preparation of drilling instructions and drilling engineering projects. Was responsible for quality control, analysis and projects involving deviation surveys ran in NAM's onshore and offshore wells. Long reach, horizontal and multi sidetrack well planning and analysis. Prepared reports for performance reviews of drilling and surveying operations performed by and for NAM. Daily use of networked PC using drilling and workover databases on VAX. Well site drilling engineering as required by NAM onshore sites in the Netherlands. Supervised all wellsite operations.

Mar 81 – Dec 88 GEOSERVICES EASTERN INC
Mud Logger, Geologist, Data Engineer, BHPT Engineer, Wellsite Operations / Drilling Engineer

Worked in basic offline and online computerised mud logging units both onshore and offshore in South East. Asia, Australia and New Zealand. Worked mostly on exploration wells using Semis and drill ships in varying water depths. Monitored drilling parameters in order to optimise drilling conditions, hydraulics, bit selection etc. Drilling engineering calculations including kick control, leak off tests, hydraulics, bit cost per foot, casing running lists, etc. Pore pressure data analysis for fracture and pore pressure gradient predictions. Electric log analysis, Gas chromatography. Prepared Lithological and hydrocarbon logs, cuttings analysis, geochemical analysis using Pyrolysis techniques, core description and analysis including thin section preparation. Used HP computers. Well site operations engineer was responsible for supervising and reporting of drilling, completions and workovers. Designed and supervised casing and liner cementing, supervised of Electric Logging, running casing, mud logging units, dual string, triple zone completions, gravel packing, acidising, Nitrogen stimulation, stock control and ordering of well site consumables and well cost analysis. Trained Assistant Wellsite Engineers. Ran and maintained HP 2813C Quartz crystal pressure gauges, Valstar Temperature and Memory modules run on Wireline for production testing of oil and gas wells. Supervised and operated first Geoservices ALS 5000 PC based computerised mud logging unit in Australia. Senior Engineer for Geoservices in Australia prior to leaving in 1988.

Dec 80 – Feb 81 UNITED GEOPHYSICAL
Computer / Seismologist / Party Manager

Computation of static corrections on 96 trace and crews, worked in the top end of the Niger Delta for AGIP. Shooting 12 fold coverage. Planned shooting programmes (Skips for rivers, villages etc). Supervised short hole drilling contractors, experimental shooting programming to determine optimum weathering layer models. Prepared monthly reports. Stock control of explosives. Acted as party manager.

Mar 76 – Jun 79 SAUDI ARABIAN DAMES & MOORE
Staff Geologist

Provided drilling supervision, soils sampling, coring in soft and hard rock, site surveys and site investigations for foundation design in major construction projects including YANBU, JUBAIL, RHYADH, JEDDAH, AL KHARJ, HUFFUF, DAMMAM, TRANS ARABIAN PIPELINE. Provided quality control supervision and testing in field and laboratory compacted fill materials and structural concrete on large construction sites at YANBU and in RHYADH. Prepared geological field reports and detailed soils logs.

Oct 75 – Dec 76 WC FRENCH CONTRUCTION LIMITED
Materials Technician

1974 – 1975 DEPARTMENT OF MATHEMATICS
Technician

COURSES Current IWCF Subsea Supervisors Certificate (Nov 2007),
Current offshore survival course HUET(2007)
Shell HTHP course,
BP Stuck Pipe Course,
Volumetric Stripping Course,
Shell Permit Signatories Course,
Schlumberger Advanced Well Logging Analysis Course,
Esso Well Control and Blow Out Prevention Course,
Australian Radiation Safety Council Course,
Compass Software Users Course,
Shell Expro Epidoris Users Course,
Geoservices Engineering On Line Computer Training,
NAM VVAI,
ADS Course,
Safety Auditing,
H2S Training.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2001 to 2050 of 10816)Go to Search Parameters...
Brief Description
Catering Site Manager, HSE Manager
Seismic Project manager and QC
Project Controls Estimator
Marine electrical fitter, 20 years experience, trade qualified, was a foreman in the field. Skilled in mechanical / hydraulic servicing as well.
This is to register my availability for contracts in the function above as detailed in the enclosed CV, U.K. or abroad. My most recent projects, all at senior level with direct bearing on Proactive HSE, Project Methodology, Quality and Timing have included.
HSEQ Manager and Integrated Management System Coordinator
Power Industry Plant Manager - Over 35 years of progressively diverse experience encompassing electric utility generation operation and maintenance, reliability improvement and facility management
i have worked with many multi national firms.I want to obtain a position of Plant manager/Maintenance manager/Service manager in your company. I have done courses under shell company Safety awareness. Incident and injury free. Defensive driving. Safety induction.
Project Engineering, Construction, Contracts, Commissioning, Start Up.
Drilling supervisor with extensive drilling engineering and operations background
Free! Versatile individual with 29 years of experience, 25 of which have been in the upstream oil industry performing in plant maintenance, operations field management, and mechanical integrity, also managed implementation of maintenance driven projects
Piping DEsign Engineer with 13 years of experience in the field of refinery, petrochemicals, fertilizers. Experience in layouts, materials, stress analysis. Presently working with KNPC, Shuaiba Refinery, Kuwait
Technical Professional with over 20 years global experience in Petroleum Engineering, Intervention Services, Project management, On-site Supervision, Proposal and Report preparation, Contract preparation and Administration.
I an am executive with 24 yrs of experience with success in start up, strategic planning, product management, sales and marketing, cost control, technology transfer of engineering/equipment /turnkey system being part of global cross functional team for strategy building and success in the region.
A hardworking and highly competent Electrical Engineer
A petroleum geologist proficient in interpreting and integrating well logs, core analysis data, petrology, 2D and 3D seismic, well test and production data to develop prospects and drilling opportunities leading to the economic production of hydrocarbon.
QA design and Quality Control including conduct of coordination and various inspection activities on mechanical packages in UK, Europe, USA, Middle East and Far East. Computer system / procurement activities.
My objective is to start a new career in Indonesia that would allow me to expand on my twelve years of sales, marketing and contract experience in the service sector for the Indonesian Oil, Gas and Geothermal business after retiring from Schlumberger.
Overall I have 19 years of experience in the field of Project Management, Administration, Secretarial, Document Control, Personnel and Procurement. For the last twelve (12) years I am working with Saudi Aramco and Petrokemya?s various GAS EPC projects.
Charted Engineering marien & mechanical engineering with PHD in Engineering management,20 Years experience as senior corrosion engineer in mining and petroleum industries. With 15 years in engineering management. Specialist engineer coating and Cp design.
I am a Project Manager/Mechanical Engineer with 33 years experience in both, International & local projects.
2003-2004 Veco Engineering Abu Dhabi 2002-2003 ABB s.r.l. Romania 2001-2002 ABB s.r.o. Czech Republic 2000-2001 T.I.A.b , Romania 1999-2000 Progeco Sistemi Group, Italia 1998-1999 I.P.I.P. , Romania 1980-1998 Upetrom S.A. Romania
Directing and maintaining the QHS&E efforts of the Region, to conform to Company policy, regulatory, and customer’s requirements. Developing Region policies, procedures, and related documentation. Interact with client HSE departments to ensure understanding of HSE Systems.
I am a no non-sense safety professional with a serious work ethic to accomplish company goals and objectives. I have over 20 years of HSE management experience with the last two years working in Russia on World-class Projects.
My skills are developing training plans & tracking using SAP, managing training records, training technicians developing CBT modules. Creating operating procedures, training modules. Word proc & Tech writing, Power Point, Outlook, Excel, SAP, Front Page. Inc/Acc Invest, TDC3000 & DCS operating, SWP
Ist class Chemical Engineer with vast experience in operation , Project Management , Engineering Management , Commissioning Management in Fertilizer , Petrochemical and refinery field.
Twenty five years in managing remote area field construction and logistical operations through out Asia. Construction of air strips, heli-pads, camp facilities, drilling location. Subsea Fiber Optic cable landing operations and post lay burial operations on and off shore.
Mechanic Engineer
A Uk based professional Chemical/ Process Engineer with 20 years experience in various aspects of Plant Operations and Design. Looking for ex-pat status or home based job/contract. Special interests include Environmental Engineering, solid/ liquid separations and wastewater treatment.
DCS system engineering design, configuration, installation & commissioning.
20+ yrs in management and technical consultancy for the international oil and gas industry. Experience in organisation and business process development, change management, management systems and procedures, business performance review and development, HR and training management.
Regional office manager position handling material, transportation, local contracts, housing, food, utilities. Fluent in ARABIC, ITALIAN, SPANISH, ENGLISH, GREEK. Knowledge of Libyan culture, religion, customs, geography, and geopolitics.
Take up Senior Corporate Management Level challenging position with multi-million Heavy industries
Possess over 25 years experience onshore and offshore in the Health, Safety and Environmental Field.
Senior Project Manager with 25+ years of experience in the Oil and Gas industry. Extensive international experience on numerous EPC projects, both Lump Sum and Reimbursable. Excellent track record of delivering projects on time and under budget. i.e. profitable. Long list of satisfied clients.
Achievement-oriented professional with extensive experiences as HR & administrative executive with large exposure in Oil & Gas sector, with a strong background into project/ branch based organisations. Graduate degree and Master's Diploma in Business Administration (MDBA).
Develop and evaluate fire hazard analysis,various types of fire protection/detection and suppression systems, scope development, review of deliverables, identify user interface requirements and project coordination
Polyester, Nylon,extrusion,plant management, manufacturing, sales
Experienced, proficient and highly qualified Senior QA Engineer/Manager, able to provide 30 years of QA and QC experience in a wide range of disciplines within the oil and gas sector. Would consider a long term posting (if possible) in the UAE, Malaysia, Thailand, Singapore, Japan or Vietnam.
Dear Sir, I am looking for a job.Thanks for your email,
Over 30 years in oil and gas pipeline inspection. Welding and NDE CSWIP 3.2 CSWIP RT UT MT + ATTO
Petroleum engineer with 28 years experience. Primarily field exploitation but includes drilling, production, reservoir and facilities. Overseas for 14 years working on properties in Pakistan, Indonesia and New Zealand. Able to work under conditions with little support staff or management supervision
I have a Bachelors degree in Chemical Eng with over 20 years experience in Safety, Chemical Plant Operations and Process Engineering in multi national chemical companies like EXXON, Ciba-Geigy, & Shell. Presently working as Senior Process Safety Engineer with a leading company in Saudi Arabia
M. Tech (Electrical Engineering) Over 17 years experience in Design, construction and commissioning in Oil & Gas, Petrochemilcal and Power plant
32+ years Civil Engineering experience on Public Works, Utilities, Industrial, Commercial and Residential projects. Experienced in streets, highways, water systems, sanitary & industrial sewers, airports, site development, grading, drainage, underground piping and specifications
Drilling Engineer . I worked as a well site-drilling engineer, drilling supervisor, operations drilling engineer, drilling superintendent and promoted to drilling engineer specialist, after receiving PhD in Operations Management
Mechanical Engineer (degree) having over 24 years experience in Planning and Maintenance in large petrochemicals, oil/gas facilities. Specialized in Maintenance Planning and CMMS (Maximo).
I am a qualified Electrical engineer with a vast exposure of more than 21 years in the field of Detailed Engineering ,Operation /Maintenance,Erection/commissioning,Testing etc in search of a suitable job in UAE,Qatar,Oman
Sr. Piping/Hvac Designer with over 25 years of experience with a solid 3D modeling experience mainly in AutoCad. Currently studying Cadworx at home using a tutorial from Cadworx.
Dear sir, I would like to submit my application form for a suitable post of production engineer. Here is my CV below. If you want other document or information, please let me know.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   [ 41 ]   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com