Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #88218 next resume »»
CONTACT INFORMATION:
View contact information...

An accomplished Civil Engineering, specializing in Cost & Quantity Survey, Design, Planning, Implementation, Construction, Project Scheduler using P3, Ms Project, with exclusive experience in different International Consulting Engineering Company as well International Contractor like SMEC International Ltd., Construction & Equipment ltd, St. Lucia, Combined Group of Company, Qatar, Strabag International GmbH, Germany, Willbros International Inc., Houston Texas., Louisberger Group Inc in Washington D.C, Saudi Parson International, Saudi Arabia, Royal Commission of Yanbu, K.S.A, Saudi Aramco in Dhahran, KSA, Aim Consultant's Ltd. in Nigeria, Sobek Engineering Ltd, South Africa, Shinsung Corporation of Seoul, South Korea, TRT - France for Municipal Telephone Project in Philippines.

SUMMARY OF QUALIFICATIONS

> Solid management skills, demonstrated proficiency in leading and mentoring individuals to maximize levels of productivity, while forming cohesive team environments.
> Ensure correct and timely re-measurement on major Oil & Gas Project, Civil and Infrastructure project for the purpose of submission to the client and evaluation of payment application.
> Review all correspondence (Client, Consultant's as well subcontractor) to ensure all issues are properly dealt with as required by the contract/ subcontract conditions, including preparation of response correspondence.
> Prepare measurement and Cost Estimate / Detailed breakdowns for Changed / Additional works.
> Prepare and maintain Monthly Progress measurement of all areas of the works. Measure on commutative basis and progress of previous month and current progress. Each area of change work must be noted separately.
> Prepare the Project Work Schedule using of ( P3 ) Primavera and Ms Project.
> Provide technical guidance to the subordinate and skilled workers in the field as well outside the worksite.
> Prepared measurement and Cost Estimate / Detailed breakdowns for Land Development Project Such as Building, Housing, Golf Course, and other utilities such as water, electrical, sewer, and drainage.
> Supervision of road construction project from Earthworks excavation up to Final Pavement as well Dam Dredging, Bridge and all Infrastructure like water, sewer
> Planning and Design for Road and Infrastructure project pertaining to Plan & Profile, Cross Section, Data calculations, super elevation, and Drainage system.
> Material Quality Control
> Coordinate to Client and Contractor for the status of the project then reporting to Managing Director.

TECHNICAL EXPERTISE

> PLANNING AND DESIGN - ROADS, HIGHWAYS, DRAINAGE & PIPELINE
> Plan and Profile, Super-elevation in circular curve
> Survey Data Computation using Computer Program
> Cross Section Drawing
> Site Grading Plan
> Project Cost Estimate, Project Work Schedule
Software Program > LDD, Mx Road, Autocadd, Ms Office, Survey 4

> PROJECT MANAGEMENT - COST & QUANTITY SURVEYOR/SCHEDULER
> Bill of Engineering Measurement
> Cost Estimate / Detailed Breakdowns for Changed
/ Additional Works and Days Works
> Procedures and standard conditions of contract for re-measurable works
> re-measurement on building, major civil and infrastructure projects for the purpose of submission of Main Contractor invoice submissions to the Client and for the evaluation of Subcontractor Payment applications.
> Maintain files relating to all invoices
> Review and study Contract Documents to be fully aware of clients Scope of Work, Contractual Requirements and requirements noted on Tender Documents, especially drawings.
> Advising on Contractual obligations and procedures connected with Main Contract and Sub-Contracts
> Prepare and maintain Monthly Progress measurement of all areas of the work. Measure on cumulative basis and progress of previous month and current progress. Each area of Change Work must be noted separately.
> Maintain separate files for, and follow-up through settlement, all Changes
> Review instructions issued and preparation of a Change Control Log covering any impact on costs, and liabilities resulting from variations/changes included in the drawing/instructions.

> CONSTRUCTION / - EARTHWORKS, DAM, HOUSING PROJECT,
IMPLEMENTATION, ROAD PAVEMENT, DRAINAGE & PIPELINE.
> Supervision of field Engineer and Skilled worker
> Material Quality Control
> Giving instruction and work schedule for field works.
> Supervision of actual building, road, infrastructure construction and implementation on site.

> SURVEYING - TOPOGRAPHIC, & CADASTRAL SURVEY,
GROUND POSITIONING SYSTEM (GPS),
„« Using of total station, Theodolite for land survey,
„« Actual survey calculation and site survey using surveying instrument.

PROFESSIONAL EXPERIENCE

SMEC-Snowy Mountains Engineering Corpoation July 31, 2009 to Present
Senior Quantity Surveyor
Project Involved - Roseires Dam Heigthening Project
Dam Implementation Unit
Republic of Sudan

As Senior Quantity Surveyor checking of Contractor submittal in quantity measurement sheet in all part of permanent work. Checking and analysis the variation order submitted by contractor for approval of the Client. Coordinate with other department to see to it that the quantity calculations submitted by contractor is calculated based on the method of measurement. Coordinate with other Quantity Surveyor specially on Monthly Payment certificate to see to it that all requirements in the contract condition is apply in Payment Certificate.

Construction & Industrial Equipment Ltd. October 10, 2008 to June 2009
Project Manager / Sr. Quantity Surveyor
Project Involved: Road Rehabilitation
European Funded
Ministry of Works & Telecommunication

As Project Manager / Sr. Quantity Surveyor, prepared the Daily Quantity Accomplishment for submittal to Managing Director Prepare Daily Report and checking of Monthly Certificate of Payment submitted to Client. Checking and Monitoring the site accomplishment for daily and monthly report.. Coordinate with all Engineer's who supervised the site construction for checking of quantity. Training the Junior Engineer regarding the Contract Specification and Contract Condition. Attend all the meeting with the Consultant and the Client.: - Responsible for the management, training and development of the project's commercial resources Liaising with Project Manager on all operational and commercial issues Responsible for all aspects of project Contract administration and maintenance of contract records Preparation of budgets in conjunction with Commercial Manager Procurement of subcontractors and supply orders Preparation submission and agreement of quotations for variations

Combined Group Company December 11, 2007 to September 2008
Planning & Quantity Surveyor
Project Involved: 200 Million Infrastructure Project
Ministry of Industrial Estate, Doha, Qatar

Combined Group Company is one of the big Company in Kuwait and Qatar in Land Development, Road Construction, Micro tunneling, and other Civil Engineering jobs. As a Cost & Quantity Surveyor prepared the Monthly Payment Certificate based on Work Accomplishment. Check the work accomplishment of the sub-contractor, payment certificate. Prepared the Price Breakdown Analysis for the submittal on the Client. Prepared the Monthly progress report for the record of the head office in Germany. Coordinate with the Consultant the status of the work and accomplishment for bi-weekly meeting with the client. Check all the supply of Materials by the sub-contractor for payment. Prepared and submit the daily report to the Area Manager for Africa all the status of the project

Strabag International GmbH April 30, 2007 up to September 2007
Cost & Quantity Surveyor
Project Involved: 243 km Double Carriageway
Rehabilitation Project, Benghazi Libya

Strabag is the no. 3 in the world in terms of construction base on the McGrawll Engineering Edition. As a Cost & Quantity Surveyor prepared the Monthly Payment Certificate based on Work Accomplishment. Check the work accomplishment of the sub-contractor, payment certificate. Prepared the Price Breakdown Analysis for the submittal on the Client. Prepared the Monthly progress report for the record of the head office in Germany. Coordinate with the Consultant the status of the work and accomplishment for bi-weekly meeting with the client. Check all the supply of Materials by the sub-contractor for payment. Prepared and submit the daily report to the Area Manager for Africa all the status of the project.

Willbros (Nigeria ) Ltd May 17, 2006 to December 15, 2007
Cost & Quantity Surveyor
Project Involved: Asasa- Asabo Uplift Pipeline Project

Willbros ( Nigeria ) Ltd is a part of the Willbros International in Houston, USA, which engaged in EPC
Project for Oil & Gas, Onshore & Offshore. As Cost and Quantity Surveyor prepared the Monthly
Invoices for work accomplishment. Materials take off on the approved drawing of the client for change order, Projected Cost to, and tracking of procurement of the main office for updating the materials control. Prepared the milestone certificate based on the report of the Field Engineer and other personnel involved on the project. Prepared EPC Plant cost / budget reports requested by PMT Cost
Control. Assist with Change Order Proposals. Analyzed commercial content of Change Order Proposal submitted Sub- contractors in connection with Change Order Instructions and Change Order
Requests and in particular: analyse the quantities and evaluation mechanism upon which the have been based by reference to the Contracts / Purchase Orders, obtain clarifications from his counterparts within Contractors / Suppliers. Prepare approximate estimates for potential changes / risks identified by the EPC Plant Management Team, including those related to approved deviations and relaxations in Contract requirements. Work with the EPC Plant Contract Engineer when modifications need to be made on agreements or on particular contract condition.

Sobek Engineering Ltd. South Africa October 2005 to January 2006
IN -HOUSE Road Designer & Cost/ Quantity Surveyor
Project Involved: Masilo Area & Wepeneg
Municipality, Road Design

Sobek Engineering is Engineering Consultancy for Infrastructure, Road, Water, Sewer, and Waste
Treatment Plant in South Africa. As our partner, they send the survey data, design criteria and specification and we are the one who make design and Cost / Quantity here in Philippines then submit to them by electronic finish product.

Manalo & Zapanta Construction Company
Managing Director
Project Involved: Dredging of Dam for Hydroelectric &
Development Corporation
Davao City, Philippines

The Manalo & Zapanta Construction Company is a joint venture registered in Philippines for Land development design, construction, road design and Cost / Quantity Survey. We are the sub-office of
Sobek Engineering in Philippines to do the design, cost and quantification of the given project.

Louisberger Group Inc. Washington D.C February 14, 2005 to October 3, 2005
COST & QUANTITY SURVEYOR
Proj. Base - Kabul Afghanistan
Kandahar-Herat Road Rehab. Proj.
USAID Project - Cost $ 220 million

As Cost and Quantity Surveyor, prepared the Daily Quantity Accomplishment report of the Contractor for submittal to Main Office in Washington D.C. Submit and prepared the Resident Engineer Daily Report and checking of Monthly Certificate of Payment submitted by the Contractor. Checking and Monitoring the site accomplishment of the contractor for daily and monthly report. Checking of Contractor's material's delivery on site. Coordinate with all Engineer's who supervised the site construction for checking of quantity.

AIM Consultant's Ltd. Nigeria March 30, 2001 to May 4, 2003
SR. ROAD & INFRASTRUCTURE ENGR.
Archetics, Engineers, Planners,
Quantity Surveyors, Project Managers
PROJECT INVOLVED: Katampe Development and Infrastructure- 18 Billion Naira
Nigerian Naval Navigation Project - $ 60 million
Design for KANO National Highway - 220.2 km - $ 120 million Project
World Bank Building - Republic of Benin

As Sr.Road & Infrastructure Engineer to prepared design, cost and quantity Calculation, using the latest program. Data calculations of Profile of road and cross-section with super-elevation. Coordinate to client and contractor for the status of the project then reporting to Managing Director. Involved for the preparation of all company project such navigation canal, site grading plan, Water Supply and all Road Design. Material Quality Control for other project being the Consultant. Using of Computer program such as Land Development Program, Auto cadd, and Survey Program for Data calculations. Designed, Head of Task & Supervised the Multi Discipline Project from Drainage, Water, Sewer in Land Development Project in Nigeria. Supervised the 550 hectares and 128 hectares subdivision project for Government of Nigeria as Main Design and Implementation Consultant¡¦s. Four Storey World Bank Building in Republic of Benin as Quantity Surveyor.

Shinsung Corporation, South Korea Feb. 18, 1999 to Feb. 01, 2001
SCHEDULER & OFFICE ENGINEER
General Contractor & Engineer¡¦s
PROJECT INVOLVED: Davao - Bukidnon Road Project - Philippines
World Bank Project - 63 Km = US $ 19.5 million

As Scheduler & Office Engineer prepared the Plan and Profile, Cross Section drawing by using the method of super elevation in circular curve, Straight to Circular Curve, Circular curve-Maximum Straight-Circular Curve, Circular Curve to Circular Curve, Method of applying Symmetrical & Unsymmetrical & Short radius turns for three-centered Curves. Prepared all format form of Drawing, Quantity and Billing requirements, & responsible in Planning and Design as well in all Field Engineer. Substitute when the Planning Manager is on Leave. Responsible in the Engineering section Delegate duties and responsibilities to all Technical Staff Engineers assigned on the preparation of Design Drawing to be used on Site Construction. Coordinate to the Consultant regarding the Billing, Quantity and work schedule prior to work of execution with end in view of bringing the completion of the total work with original estimates in cost.

Royal Commission of Yanbu - Saudi Arabia March 04, 1993 to Feb. 28, 1997
COMPUTER DATA SPECIALIST,
QUANTITY SURVEYOR, & SR. SURVEY DRAFTSMAN
Saudi Government Institution
Management Services Contractor
PROJECT INVOLVED: Development of Yanbu Al Sinaiyah from Housing, Light Industrial Park,
Heavy Industrial Park, Recreation facilities, Flood Control, etc¡K

Royal Commission is a Government Agency of Saudi Arabia which consist of 52 Department.
Responsible in preparation of all Drawing by using computer program Such as Civil, Survey, and other related Engineering Drawing. In charge for Quantity calculation, verification and actual computation of the project cost. Support the Planning & Design Department for the calculation of lot area, Volume
Traverse calculation, bys using of coordinate geometry for Survey Solutions. Supervised all project of
Royal Commission in terms of Infrastructure and underground utilities.

Saudi Arabian Parson's Ltd. - Saudi Arabia August 02, 1992 to Feb. 28, 1993
SR. SUVEY DATA SPECIALIST & DRAFTSMAN
Management Services Contractor
Engineering Consultant - Royal Commission
PROJECT INVOLVED: Consultant of Royal Commission for the Development of Yanbu Al Sinaiyah, in all Engineering Project.

Saudi Arabian Parsons Ltd. is the Management Services Contractor as the Consultant of all Department in Royal Commission. Responsible for Data Calculations by using Computer Program such as Generic
Cadd6, Survey 4 for the preparation of design and drawing to be used of in the Implementation and calculation of quality on Horizontal project. Inspection and monitoring the Contractor accomplishment base on specification of the Consultant. Design and check the final drawing provide by the Planning and
Design Department specialty in Urban Planning Section

Telecommunication Radioelectrique et Teleponique - France November 01, 1991 to August 2, 1992
CHIEF PLANNER & FIELD COORDINATOR
Fabrication and Installation
PROJECT INVOLVED: Municipal Telephone Project - Philippines

Responsible for Engineering drawing for Telecommunication Lay-out for Municipal Telephone Project including the Engineering Diagram. Prepared the work schedule and Perrt CPM, Inspect and Supervised the Civil Works of the Contractor during Site Implementation and Installation based on the contract and supervised the Engineering Staff for daily accomplishment.

Saudi Arabian Oil Company - Saudi Arabia September 20, 1988 to April 20, 1991
ASST. FACILITIES PLANNER & DRAFTSMAN
(Supply Personnel)
PROJECT INVOLVED: Saudi Aramco Aviation Facilities Planning

Responsible for the preparation of Drawing required by the Facilities Engineer in all Pump Station, Rig
Area, Offshore and Onshore Facilities. Prepared and design of Aircraft Runway for Non-pavement for
Boeing 737, Fokker 22, & DHC - 6 with the specification of Federal Aviation Administration. Prepared all kinds of drawing and Quantity calculations for all area of Saudi Aramco under the supervision of
Aviation Department such Refueling Facilities. Pump Station, Off-Shore and On-shore Facilities.
Coordinate to Saudi Engineers for Modification and proposal for major and minor project within the
Aviation Department, Saudi Aramco facilities.

Al Jehat Company - Dammam, Saudi Arabia May 30, 1985 to September 15, 1988
COMPUTER DRAFTSMAN & QUANTITY SURVEYOR
Engineering and Survey Consultant
PROJECT INVOLVED: Ground Position System & Survey Satelite
Saudi Aramco Supply Personnel
Horizontal Project all over Saudi Arabia

Responsible for the preparation of drawing required by the Client using of Computer and prepared the Quantity Calculations for Horizontal project all over Saudi Arabia. Including for Road Design, Site Development Plan, Quantity calculations, and other Engineering related drawings. Assigned in different Company which we have Contract as Consultant in many aspect specially from Planning and Design, Survey and Engineering, using the latest Technology of Computer Program such as MS Project for Scheduling, Survey 4 for Data Calculations, and Generic Cadd6 for preparations of Final Design and Drawing. Assigned in the field Survey using highly Technical Survey Instrument such as GEODIMETER 400, 420 and Total Station and Ground Positioning System (GPS).

EDUCATION

NATIONAL UNVERSITY
Bachelor of Science in Civil engineering
Graduated - March 1982

CRESCENT TECHNOLOGY
Project Management
Certificate - January 2005

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1951 to 2000 of 10902)Go to Search Parameters...
Brief Description
Highly skilled and client motivated commissioning/operations technician able to work to Superintendent level and oversee many different nationalities of staff.
Drilling Supervisor for past 3 1/2 years with previous experience on Contractor side as a rig manager. I am motivated, knowledgeable and organized as a Drilling Supervisor. I have very good people skills and expect the best of people I work with.
Instrument & electrical design and field work
Sr. piping designer/checker, total 21 years experience in oil and gas field
Autocad, Bentley AutoplanXP, Navis Works, Isogen, Excel, Access, Word
Reservoir engineer - Experience in tight sands and shale and CBM
I’ve been in the oilfield for over 20years and have worked my way from the bottom to my present postion as driller , I have well control card and forklift and manlift certificates and valid passport, I’m looking for a company to excel with . At your convenience i'd like
SENIOR DRILLING SUPERVISOR/OPERATIONS MANAGER/ DRILLING MANAGER
34 years in oil industry, toolpush and wellsite supervisor
I have more than 10 years of maintenance experience as an instrument technician
Adaptable, Senior Procurement specialist with international experience in Europe, Middle East and the FSU, with EPC’s, operators and service companies. A buyer, with experience of procurement procedures, expediting, inspections, shipping (incoterms) & customs. Knowledge of sulphuric acid plant procu
Visionary professional with 11 years Operation experience in Oil and Gas plant, Petrochemical and Cryogenic plants
I have 15 years experience as Extraction-Production Onshore Oil & Gas Engineer (artificial lift, Sucker Rod Pumping, PCP): Section Head of Field Extraction-Production Onshore Oil & Gas, Technologist Engineer, Night Shift Engineer, Echometer, Optimization Wells, Slickline
NDT Level III
My experience in different Engineering Consultancy Company like SMEC International Ltd.as well International Contractor like Construction & Industrial equipment Ltd in St. Lucia, Caribbean Island, Strabag International assigned in Libya, Willbros International Inc.,Houston Texas, assigned in Nigeria
A highly effective Chemical Engineering Professional who meets challenges head-on and creates positive change. A creative and detail-oriented Six Sigma Black Belt, with a proven record of success in new product development and process improvement; and track record of success developing and leading
BSc in env. MSc in safety eng.
Oil and gas economics manager
Over 25 years of teaching practical and theoretical in the field of mechanical maintenance in the Philippines and Middle East
Twenty(20) years of experience in detail engineering/FEED/PMC of petrochemical complex/refinery/major industrial projects. 11 years wotking in middle east countrirs. Familiar with international codes and standards.
A highly experienced Pre-Commissioning, Commissioning, Start-Up and Field Engineer, Coordinator, Supervisor, Shut-Down planner, having worked on many varied projects Having a Degree – Marine Engineer, (Ship Engineer)
Proven ability to provide Industry initiative and leadership. 20 years of experience. Extensive SCADA, PLC, DCS and HMI Project Management Consulting knowledge.
Iam seeks job for Procurement / Material coorninator
Field Engineer
dcs panel operation for terminal and plant
GRADUATE DIPLOMA HOLDER (3 year fulltime study) in MECHANICAL ENGINEERING, having Certifications as SENIOR WELDING INSPECTOR (CSWIP 3.2) -TWI LONDON, NACE (USA) COATING INSPECTOR LEVEL 1 – CERTIFIED, NQA (UK London) Certificate of Training in ISO 9001-2000 QMS Auditor, ASNT LEVEL II-RT,UT,MT,PT
Petrophysicist, Log analyst
He is the Manager of Technology Development in Exploration & Production in the Corporate Direction of Strategic Planning of PEMEX. Previously, he was Well Productivity Manager in the Technology and Professional Development Vice-presidency of PEMEX Exploration & Production. Also, he has been the head
Sale and marketing experiences.
Comprehensive experience in contracts management and projects management, construction management, mechanical, maintenance and operations management, mainly oilfield and production plants.
QA/QC engineer/inspector in piping/pipeline and facilities construction in oil/gas. And an HND in welding/fabrication .
Have wide-ranging experience in Oil & gas (both Onshore & Offshore), refinery and petrochemical industries with good exposure towards Distributed Control Systems, Safeguarding Systems, Fire & Gas Systems and various types of Field Instruments.
I am a 3D PDS piping designer I work in various field of engineering, mostly oil & gas I have also knowledge in structural designing
Geologist, with 18 years of experience in the hydrocarbon sector, working in Venezuela, Trinidad and Tobago, Brazil and Mexico. Good command of computers. Experienced working and studying in a multicultural and diverse environment - Excellent interpersonal, communication and teamwork skills.
Degree: B.E. (Architect) Construction, Civil Works and Buildings expertise & HVAC installation.
Safety Engineer/Professional
Seeking challenging Position in Project Management where I can use my Experience, Market Exposure, Management Skill and Communication to achieve the high goals set by the organisation
7+ Yrs Exp in Mechanical CAD/FEA/CAE/CFD
Oil and Gas Production Operator, Lead Operator, workovers, Construction,inspections, repairs, trouble shooting, meter calibration, azcom, Hazmat, Confined spaces, Firefigting, water susvival, T-2, Dot, elicopter afety and fueling
SHOP FOREMAN, CVI CERTIFICATION, LEAD HAND, HEAVY DUTY MECHANIC, PARTS AND INVENTORY, HEAVY DUTY EQUIPMENT PM SCHEDULING AND MAINTAINING DATABASE OF FLEET
I have 10 years of experience in E&P business, evaluating basins interms of potential, play maturation, volumetrics,maturing prospects, interpreting seismic data, building geological and facies model, well operation, seismic inversion, fluid substitution modelling, porosity estimation, AVO analysis.
Well Service / Wireline / Snubbing / Workover Supervisor
I have a good management skills and experiences in various areas of operations. I am particularly aware of the Operation / construction / Commissioning and start up for Oil and Gas industries.
Rig mechanic/heavy machinery mechanical fitter/aircraft mechanical ground engineer can do any thing.
Over 18 years of combine experience in Oil and Gas mostly in Engineering Design projects from FEED to Detailed design for Offshore and Onshore projects, Subsea structures, Structural Piping design, Mechanical, Electrical and Civil work, and other similar structures and equipment details, assemblies
Field & office design, using PDS program, review drawing before send to approved
Senior instrumentation and controls maintenance. Commissioning Supervisor specially
Procurement Buyer – at Snamprogetti Romania a company of Saipem Responsibilities: - responsible for the process of Liquidated Damages
Senior workover & completion operations supervisor with 7 years experience in HPHT oil wells in different workover activates, gained master degree in petroleum technology, BSc degree in Petroleum Engineering & recently warded IWCF certificate drilling supervisor level.
SUMMARY OF EXPERIENCE Eleven (10) years of very sound technical proficiency as a “Sr. Piping Designer / Draftsman”in the Oil & Gas Field, Petrochemicals Refineries, Piping, Tank farm Area’s, Platform Piping, Jacket Piping, Pipe Racks & Process Equipments, Cross Country Pipelines including pumping s
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   [ 40 ]   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com