Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #9455
next resume »»
CONTACT INFORMATION:
View contact information...
Cover page
Subject: Employment with your organization
Dear sir,
Electrical Engineering Graduate having more than 22 years experience in the field of HSE safety (Electrical Isolation Authority / safety Officer) implementation Further construction, Production, QA/QC activities, Testing & commissioning, of Electrical Equipments and ICAPS(Integrated commissioning and Progressive System) Documentations maintaining & up-dating.
I worked as Electrical Engineer / Work permit controller (HSE Electrical Isolation Authority) in HYUNDAI Engineering & construction Co with commissioning activities Monitoring at IRAN for SOUTH PARS GAS DEVELOPMENT Phase 4 & 5(A – 1 Project) at IRAN, [Main client is ENI IRAN B.V]. Further I worked as Electrical Engineer in HYUNDAI Engineering & construction Co at IRAN for SOUTH PARS GAS FIELD DEVELOPMENT Phase 2 & 3 (STAS project) at IRAN (main client is TOTAL FINA ELF co.) for commissioning activities Monitoring & PTW system implementation for Electrical works.
Further I worked as PROJECT ENGINEER in INNOX POWER ENGINEERING, SINGAPORE, JAYA MARINE GENERAL CONTRACTOR PTE LTD SINGAPORE, and AZEN MANUFACTURING PTE LTD SINGAPORE under EMPLOYMENT PASS for 2.5 years. And I have 18 years experience in INDIA.
I have got APPRECIATION REFERENCE LETTERS from my previous Project Managers (Billion Dollar projects of South Pars Gas field Developments phase 2 &3, 4 &5 projects in IRAN and SBM project in Singapore).
Indebted with good communication skills, aptitude and specialized in maintenance, start-up and commissioning of Equipment's in Oil, Gas and Power plant projects, I would like to seek employment with your organization for a job which offers good growth potential and perks commensurable with experience and qualifications. With proven track record, I am sure to live up to your expectations.
This is a quest for a long-term career and not a short-term arrangement. I attach a brief resume of my career (to date) for your reference and consideration. Hope to get a favorable response.
1.0 GENERAL
1.2 Date of birth & Age: 20-03-1957 (47 years)
2.0 QUALIFICATION
sl no Exam passed Year Board / University Div. (%)
2.1 Bachelor of Engineering (Electrical &Electronics ) 1990 Madurai kamaraj University ( Thiagarajar college of Engg.Madurai) 64%
2.2 Diploma in Electrical Engineering 1979 Tamilnadu Polytechnic, Madurai 69%
3.0 ADDITIONAL QUALIFICATION.
sl no Computer knowledge 1998 DOS, WINDOWS, EXCELL, MS WORD, ORACLE, D2K & OFFICE 2000
3.1 Competency certificate for Electrical Supervisor 1979 Issued by Government of Tamilnadu
3.2 National certificate of Examination in Supervision 1982 Issued by National Productivity council Delhi
3.3 Supervisory Examination certificate 1990 Issued by Institute of Road Transport, Madras
4.0 WORKING EXPERIENCE: 4.5 YEARS in ABROAD & 18 YEARS in INDIA.
Name of company position period Type of company/ project.
4.1 HYUNDAI Engg. & construction co. IRAN site Electrical Engineer 1 year A-1 project (Gas plant & power plant)
4.2 HYUNDAI Engg. & construction co. IRAN site. Electrical Engineer 1 year STAS project (Gas plant & power plant)
4.3 INNOX power Engineering SINGAPORE Project Engineer 5 months Marine Electrical contract works. (keppel, Fels, Sembawang, Jurong)
4.4 JAYA Marine general contractor, SINGAPORE Project Engineer 8 months Marine Electrical contract works
4.5 AZEN Manufacturing SINGAPORE Electrical Engineer 1 year AXIAL fan (industrial,Marine use) Manufacturing company
4.6 Pandiyan Roadways Corporation, Madurai Assistant Engineer 14 Years Transport service & Vehicle Maintenance.(Electrical utilities)
4.7 Rasi Engineering works Trichirappalli Electrical Engineer 2.5 years Industrial Electrical contractor.
4.8 Tamilnadu Electricity Board Tech.Asst 1 year Electricity Generation & Distribution System
(4.1) I worked as ELECTRICAL ENGINEER in HYUNDAI ENGINEERING & CONSTRUCTION CO. at
IRAN. for "SOUTH PARS PHASE 4&5 ON-SHORE FACILITIES PROJECT", (GAS PLANT & 4 x
40MW POWER PLANT) with the following responsible works (ENI IRAN B.V is main client).
From Jan-2004 to Aug-2004
(1) In charge of Isolation Authority for All Electrical HV &LV Equipments in Power plant & Gas plant activities.
(2) Worked as PTW controller (whenever necessary), by adopting HSE/PTW procedure & safety procedures.
(3) Familiar to adopt HSE Procedure, General & Electrical protection of safety procedure during Testing, commissioning & maintenance works with co-ordination of Commissioning section & Client with preparation of necessary work permits.
(4) Documentation for Integrated Commissioning & Planning (ICAPS) Dossiers preparations and updating of Pre-com & commissioning activities in ICAPS with up-to date progress monitoring, and Punch list follow-up.
(5) Arranging client Inspection / Energisation with necessary document preparation and supporting details.
(6) As-commissioned drawings, related to (Power plant & Gas plant) Electrical activities of this project up-dating & co-ordination to Field Engineering for implementation.
(7) I have got APPRECIATION REFERENCE LETTERS from my Project commissioning Manager for the jobs performed.
(4.2) WORKED AS ELECTRICAL ENGINEER in HYUNDAI ENGINEERING & CONSTRUCTION CO. at
IRAN. for "SOUTH PARS PHASE 2&3 ON-SHORE FACILITIES PROJECT", (GAS PLANT & POWER
PLANT) with TOTAL FINA ELF co., as main client. From August' 2001- 2002.
(1) Pre-commissioning & Commissioning of 140 MW POWER PLANT having Gas / Diesel Turbine
Generator & Steam Turbine Generator (4x30MW & 1x20MW) with 7 in-door SUB-STATIONS of
6K.V panel Board and 400V Switch Board (33KV/6KV switchboards in main substation & 6KV/400V
switchboards in all other substations). With following Major equipment's.
Generator: LEROY & SOMER / BRUSH / JEUMOUNT - 11 KV / 30MW & 6KV / 2MW.
Transformer: FRANSTRANSFO 11KV/33KV, 33KV/6KV & 6KV/400V. UPTO 50MVA
Protection Relays & panels: ALSTOM, ABB, SPIE.
(2) Familiar to adopt HSE Procedure, General & Electrical protection of safety procedure during Testing, commissioning & maintenance works with co-ordination of Commissioning section in Client side with preparation of necessary work permits.
(3) Co-ordination of Pre-commissioning, Commissioning of All plant equipment motors & Electrical Equipments of Generators, Transformers, Circuit breakers & MCC's.
(4) Documentation for Integrated commissioning & planning (ICAPS) Dossiers preparations for client inspections, and updating with up-to date progress monitoring. With Punch list follow-up.
(5) As-commissioned drawings, related to (Power plant & Gas plant) Electrical activities of this project up-dating & co-ordination to Field Engineering for implementation
(6) Work permit procedure (Hot & Cold works) adopting for HSE safety procedures to Electrical Isolation for HV & LV equipment's in Hazardous & non-Hazardous areas.
(7) I have got APPRECIATION REFERENCE LETTERS from my Project commissioning Manager for the jobs performed.
(4.3) WORKED AS PROJECT ENGINEER IN INNOX POWER ENGINEERING (S) PTE. LTD.,
SINGAPORE From 28-05- 99 TO 22-10-99.
The following projects responsible are handled for the production, which includes organizing, directing and co- ordination.
(1) GALAXY-III PROJECT (OFFSHORE RIG SHIP) at KEPPEL FELS, E&I installation including fixing of panel, distribution board, cable wiring testing and commissioning, Quality control inspection combined with clients and preparation of necessary documentation.
(2) For SBM PROJECT KUITO FIELD PHASE-1 (PROSTER-II) FPSO (Floating production storage offloading) at SEMBAWANG SHIPYARD Module 2&3, E&I installation including fixing of panel, distribution board, cable wiring with testing and commissioning and QC inspection with documents.
(3) For SBM PROJECT, (ESPADARTE FIELD FPSO-IV) at UDL SHIPYARD (Erected at Keppel Shipyard) Module 1&2 E&I work monitoring and compiled with ABS (American Bureau of Shipping). Specification executed with sub-con of BOND INSTRUMENTATIONS (like installation, testing and commissioning) including documentation's maintaining also.
(4) Implementation of HSE safety precautions in Hazardous & construction Areas during commissioning & Testing of Equipment's.
(5) I have got APPRECIATION REFERENCE LETTERS from my Project commissioning Manager for the jobs performed with SBM client.
(4.4) WORKED AS PROJECT ENGINEER IN JAYA MARINE GENERAL CONTRACTORS PTE.
LTD., From 03-08-98 To 25-03-99.
(1) In KEPPEL, KEPPEL FELS, KEPPEL SING MARINE, SHEMBAWANG & JURONG SHIP YARDS Power wiring & Lighting wiring with cable and conduits for VESSELS & DECKS including fixing of panel boards & Distribution boards.
(2) QA / QC inspection with client and related documents preparations as per IS specifications.
(3) HSE Electrical safety procedure Implementations during construction, Inspection, Testing & commissioning of installed Equipment's.
(4.5) WORKED AS ELECTRICAL ENGINEER IN M/S AZEN MNUFACTURING PTE. LTD.,
SINGAPORE From 07-06-97 To 06-06-98. (Under Employment Pass).
(1) Preparation of design as per customer requirements.
(2) Preparation of materials procurements for all types of fans
(3) Executing the works to the subordinates.
(4) Assembly of all types of industrial fans with co-ordination to customer.
(5) Quality assurance & Quality control.
* Verification of approved drawings as per customer requirements.
* In process of all items as per the drawings and customer requirements
* Assembling is carried out as per the drawings
* Testing: (a) impeller balancing test (b) Electrical Load Test (c) Efficiency test
(6) Axial fans trouble shooting & servicing at KEPPEL FELS, GLIDE DOOR and SINGAPORE
AIRLINES ENGINEERING Companies.
(7). Utilities and machines maintenance & servicing related to electrical works.
(4.6) WORKED AS ASSISTANT ENGINEER IN PANDIAN ROADWAYS CORPORATION LTD, MADURAI, INDIA (14 YEARS).
From 16-06-83 to 31-05-97 worked as Assistant Engineer (electrical). In-charge of all the electrical works related to the corporation, for H.T. power supply, installation, execution, operation and maintenance of 11KV/415V,2 pole structures with 500KVA Transformer. 1000A.panel board with Interlocking arrangements and 110KVA, 62.5KVA alternators operation and maintenance with trouble shooting. Operation and maintenance of Sub-switch board, Distribution boards with MCB's and UG cable wiring repairs and maintenance works executed in 2 different HT services at different places.
Operation and maintenance of machines related to vehicle maintenance, vehicle production and tyre re-trading works. Construction, Design, Estimation and Costing of Electrical installations, Power and Lighting wiring using with UG/PVC cable wiring to administrative office buildings, vehicle maintenance yard, vehicle parking yard and service connection works related to electricity board with necessary liaison works, for all 20 branches of the corporation.
All types of electrical works tender call-for with technical scrutinizing and preparation of note approval to all electrical works related to our corporation including of 20 branches. Maintenance scheduling of electrical machines likes well pumps of centrifugal type jet flow type, air compressors, battery charges welding transformers and wiring repairs and maintenance of all overhead lines and UG cables wiring.
(4.7) SERVED AS ELECTRICAL ENGINEER IN RASI ENGINEERING WORKS,
MADRAS (2 YEARS & 6 MONTHS)
From 15-01-81 to 10-06-83 worked as Electrical Engineer in Rasi Engineering works, design, estimation and installation of electrical panel boards, designing of industrial and official building wiring execution, preparation of estimation & costing and supervision.
(4.8) ONE YEAR APPRENTICE TRAINING IN TNEB. (Tamil nadu Electricity board)
From 26-12-79 to 25-12-80 training has undergone in TNEB distribution of Electrical power, from power transformer, overhead transmission line. Estimation and costing of residential, industrial service connection materials. Substation equipment's layout design, installation and maintenance like power transformer oil circuit breakers, circuit breakers and bus bars incoming and out going feeder's maintenance. Hydro generation Generator, turbine & panel board routine maintenance schedule preparation and execution. Thermal generation boilers, steam turbine and alternator routine maintenance checkup and follow up.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1301 to 1350 of 9906)
Go to Search Parameters...
Brief Description
Pipeline Engineers, Project Engineers, Project Managers
Application to vacancy Medic (Doctor)
Quality, Health, Safety and Environment Manager
I am expert in pre-commissionnig, commissioning, start up petrochemical plant spcialy in ethylene plant, consruction, field engineer familar with engineering and procurment activity, computer kwnolage, opration ethylene plant
A distinguished team lead, Functional Business Analyst & Technical System Analyst of Enterprise Technology, Well-organized results oriented individual with proven ability of implement standard procedures and processes that improve business functionality, Solid management skills, Capable of leading a
Fifteen Years working experience on various tankers, out of which eleven years of working experience as 2nd Engineer with Shell Shipping.
I have 13 years experiance in QA/QC inspection field , i working as Piping & Structural Inspector in various projects
13 years exp electrical engineer in T&D of Power sector
Bachelor of Engineering in Instrumentation Technology working as DCS Engineer with 13 + years experience
Skilled drilling engineer with more than 12 years experience for offshore drilling operation - Immediate available
Instrumentation and control Engineer with following Skills: Honeywell TDC 3000,ABB AC800x,Allen Bradely Panel View,Siemens S5 & S7,Various Field Devices
a very energetic, dynamic and analytical minded person. work with less supervision, written and spoken english are very good. i am trustworthy and dependable person and possess interpersonal relationship ability. have good working relationship with colleagues and superdinates. can handle stress
ROV pilot / team leader - subsea shift supervisor - cable officer - DP officer - Field engineer - jumpers installation - mud matts concret protective mattresses -
Free!
Drilling Engineer, 10 years experience, hpht experience, Casing design, advanced well design, drilling fluids, directional drilling, drilling software,
I have 17 years of experience and presently working with Saudi International Petrochemical Co (Sipchem). I have got specialized Skills in maintenance planning and scheduling work process control, CMMS SAP R/3 PM module, Primavera P3 / MS project, RCM, Development and implementation of maintenance
Accountant , invoicing good literacy computer
Purchasing and Materials professional with over 35 years experience worldwide. Previous experience includes work on major oil & gas and mining projects around the world including projects in the UK, Middle East, Australia and South America as well as major projects in the US.
Surveyro
Electrical engineering design, B.E(Electrical & Electronics)
Seeking A Challenging Overseas Position in a professional org MSProj & Premevira
Willing to travel with my family
I have 15 plus years oilfield experience working in refinery in Bahrain. This experience excludes time with Shell Todd Oil Services in New Zealand as Production Technician and as a Senior Mechanical Technician at Transalta Power Station – GT26 (Alstom). I am very adaptable to work schedule and have
Wellsite Drilling Supervisor
A dynamic professional with more than 24 years of rich experience in Marketing, Sales, Business Development, Planning, Procurement, Process improvement, Manufacturing and Man Management.
Geophysicist with more than 20 years experience, out of which 9 years in marine seismic data acquisition, QC, Party Manager & HSE. Good academic background with an M.Sc. in Geophysics and MBA in Admin.Management, with wide experience working in 2D & 3D seismics.
A highly experienced and versatile project management and professional engineer with over 15 years of engineering and project management experience in the Oil and Gas industries. Extensive experience in various types of oil and gas projects.
Extensive experience as a Project Manager with a focus on facilities design & construction, oil and gas regulations and environmental concerns. Responsible on all projects for design, material specs, P&ID ‘s and coordination of construction.
B. Tech in Metallurgical Engg, 27 years experience in Corrosion & Inspection function in refineries
Total experience of 23 years in oil & gas industry including oil refinery,commssioning,gas processing.Recently worked with Total E&P yemen for 7 years. As production team leader.Familiar with all day to day operations in oil & gas field + control room operations.
With 20 years experience in all types of Construction especially in Oil & Gas.
Total of 27 years experience in Inspection, Quality Control and Non Destructive Testing of Pressure Vessels, Heat Exchangers, Piping and Structures for Petrochemical Plants, Power Plants, Rigs, Ships and Storage Tanks both at the time of fabrication and on-stream stage.
Senior Piping Designer with experience through both contract and direct work assignments, with major emphasis in the areas of Specialty Chemicals, Pharmaceuticals, Petrochemicals, Sulfur Recovery, Heavy Industry, Gas Turbine & Power Generation.
B.sc Petroleum Engineering, Model 204, SAS, Oracle, Oil and Gas Database Conversion, Production Engineering, Reservoir Engineering, Supported Petroleum Engineering application (Pipeflow, Pipesim)
Senior Petroleum Engineer with long experience in Oil & Gas Industry
Experienced LNG & Petrochemical plant commissioning and maintenance activities in Electrical field. Petrochemical and Utility plants instrumentation experience is an additional experience
14 years of project experience including as Sr. pipeline engineer and piping engineer as well have experience as senior pipeline designer and piping designer including 4 years of experience in supervising a team of designers and draftsmen. Design and drafting experience in various field.
I am a certified professional engineer with MBA and having 17 years of Contracts & Procurement experience in Oil & Gas and Powers sector.
Sr. Interpretation Geophysicist w/exploration & reservoir development experience
Instrumentation Engineer, Detailed Engineering for offshore, FPSO, oil/gas,steel plants
Over 25 years experience in the oil & gas and heavy engineering industries involving all contractual and commercial aspects of project controls works covering:- proposals management; contract preparation / tendering / administration; capital budget / forecast / cost control; and contractual claims.
Mech Engr with 22 yrs exp in power plant projects, working with Thermax Babcock & Wilcox Ltd.
Expert in Industrial Gas & oil separation plants (GOSP), Gas Terminals and Stations.
Significant record of managerial and administrative contracts experience in the petrochemical, power and telecommunications industries consisting of development, drafting, negotiation, execution, management and administration of contracts and licensed technology agreements.
MANAGEMENT Able to make sound prompt decisions encompasing a diversity of areas: From design and implementation through to resources and progress strategies.
Experience in reliabilty centered maintenance and Mechanical Integrity. Extensive experience with Project engineering.
17 years experience in procurement and supply chain management in Marine, gas, oil field. Post graduate in materials management from IIMM Bangalore India. Worked with majors viz. Halliburton Inc Houston TX, supreme food service AG Ziegelbruckestrasse, Switzerland , Dubai dry docks Dubai UAE
I introduce myself, i am an Electrical Engineer worked in IRAN under Hyundai Engineerung & construction co. for South pars Field Developement Phase 4 & 5 and before Phase 2 & 3 also.
I am wireline supervisor and consultant - I have a long experience
More than 30 years on operations,pre-commissioning and commissioning
Good skills of drilling, SAP, maintenance program's, material management, store management, QHSE, completion and directional drilling
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
[ 27 ]
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com