CONTACT INFORMATION:
View contact information...
POSITION DESIRED: (full-time permanent or temporary project employee)
Construction Project Manager, or Construction Project Coordinator, Steel Erection Superintendent, or Superintendent of facility equipment installation & commissioning.
AVAILABILITY:
Available now - - - Willing to travel in performance of job.
LETTERS OF RECOMMENDATION: (Fax Copies Available)
Automatic Systems, Inc.
Staff Resources, Inc.
GM - Warren Powertrain
Saturn Corporation
Ford Motor Company, Inc.
GM - Worldwide Facilities Group
EDUCATION:
Certified Engineering Tech by NICET
Masters Degree in Administration
Degree in Mechanical Engineering
Degree in Mechanical Engineering Technology
Mechanical Design Drafting Diploma
COMPUTER PROFICIENCY:
Microsoft Project 2000 (project scheduling)
Microsoft Word
Microsoft Excel
Professional Experience
(1099 & W2 SELF EMPLOYED PROJECT CONTRACTOR - 1989 to Present)
GM WARREN POWERTRAIN - Warren, MI
POSITION: Regional Facilities Engineer - project construction (6-month project completed Feb. 2002)
Located at the customer’s facility from the time of site mobilization to project installation completion & acceptance. Duties included, but were not limited to, drawing and design review, purchasing, project coordination with union construction trades & installation personnel, scheduling and progress tracking, site construction safety and manpower monitoring. Responsible for, scope of work, equipment selection, specifications, request for quote preparation, project appropriations request, cost estimating, tracking and invoice approval. Total oversight and scope of work performance responsibility for mechanical, electrical, piping and controls subcontractors during the construction, installation, startup test & debug and launch phases of various construction and installation projects. Project managed the integration of subsystem equipment. Equipment included welding ventilation system, security camera upgrade and card access systems. Vendor selection, drawing review, purchasing and project management for fire protection systems (diesel fire pump, suction feed tank, sprinkler piping, waterflow switches, etc.) including installation, testing plus Fire Marshall and insurance carrier (IRI) acceptance. Monitored customer & subcontract personnel performance according to the functional specifications for each project. Assured that all punch list items were completed correctly and in a timely manner. Developed the master project schedules and maintained them current. Developed micro schedules for each discipline (engineering, construction & installation) and maintained a percent complete reporting structure. In addition, recommended field design modifications using concept sketches and verbal instruction to correct minor design or fabrication errors. Designed and developed programs Test & Acceptance Programs with effective feedback documentation. Held daily progress meetings with subcontractors and weekly meetings with the customer. Letter of Recommendation received from customer. Projects were successfully completed on time and within budget.
FORD KANSAS CITY ASSEMBLY PLANT - Kansas City, MO
POSITION: Project Manager of Building Construction & equipment installation (3-month project)
Contracted by Automatic Systems, Inc. (Prime contractor) to oversee their 13 subcontractors (civil, structural, mechanical, electrical, HVAC, fire protection, equipment controls, etc.) during the construction phase of a new 50,000 square foot building. Also, assisted the ASI field Superintendent during the equipment steel support structure installation phase for (6) six new Inverted Power & Free conveyor systems for Ford’s new Commercial Paint Department expansion project. Duties included, but were not limited to project coordination with subcontractors and plant personnel. Developed the master project schedule and maintained it current. An additional responsibility was site construction safety. Represented the Prime contractor at weekly safety & construction progress status meeting. Created and maintained current the project punch list in MS Excel format. Obtained customer buyoff and acceptance. Project was successfully completed on time as scheduled. Letter of recommendation was received from the Prime contractor.
GM DORAVILLE ASSEMBLY - Doraville, GA
POSITION: Worldwide Facilities Group Resident Engineer (3-month project)
Contracted through Staff Resources, Inc. for the General Motors Worldwide Facilities. My primary responsibility was to coordinate and assist in the Bid Package development, Vendor selection and Installation scheduling for new Primer Surfacer pre-fab building modification and Automation equipment. In addition, my duties included Project Management of a structural “Corrosion Study ” for the existing ELPO and Phosphate Systems. Both projects were successfully completed on time as scheduled.
POSITION: Worldwide Facilities Group Root Cause Analysis Engineer (5-month project)
Contracted for GM Corporate Facilities Engineering to troubleshoot and resolve “Plant Open Issues” concerning mechanical throughput and structural problems experienced by General Assembly, Body Shop, and Paint departments. My main objective was to reduced system downtime, which would increase production throughput and save the plant thousands of dollars in lost production time. To accomplish my task, I analyzed the problems and designed special structural steel support structures & components to eliminate product jams at load / unload points. Redesigned a portion of their "Webb Dog Magic" equipment structural support system. Modified existing structural track to achieve proper bite to eliminate drive torque outs at numerous chain to chain transfer points. All issues were resolved in a timely manner to the Plant’s satisfaction. Letter of Recommendation received from customer. Projects were successfully completed on time and within budget.
LESCO DESIGN & MANUFACTURING COMPANY, INC. - LaGrange, KY
POSITION: Procedure Designer of Reliability & Maintainability Program (7-week project)
Preliminary design of R&M standard data sheets for project management use. Project was placed on hold by customer due to funding issues.
FORD KENTUCKY TRUCK PLANT - Louisville, KY
POSITIONS: Project Manager (10-week project)
Installation Project Manager (6-month project)
Tooling and Facilities Erection Project Coordinator (4-month project)
Site Project Manager (7-month project)
Senior Construction Project Manager (18-month project)
Oversight of Tier-1 material handling equipment, rack supported building and steel structure installations. Project managed steel fabrication and erection projects. Management of electrical, piping and painting subcontractors. Developed and maintained current master project schedules (timelines). Compiled Reliability & Maintainability data. Management of Trim, Paint, Chassis, Engine, Final and Pre-delivery installation projects. Maintained the forecasted project budgets and project schedule milestones. Coordination of tooling (including facilities) installation and acceptance. Project management of ASRS, P&F and robot upgrade projects. Coordinated the integration of subsystem equipment. Developed and maintained a project percent complete reporting structure. Monitor system startup test/debug and launch teams. Created project punch lists. Selected local fabricators for economical completion of outstanding mechanical issues. Assured that all punch list items were completed in a timely manner. Letter of Recommendation received from customer. Project was successfully completed on time and within budget.
CONVEYORIZATION, INC. - Louisville, KY
POSITION: Vice President of Engineering (18-month project)
Managed the Mechanical Applications, Sales and Engineering departments. New business sales and customer development. Total engineering budget plus P&L responsibility. Approved all request for quotation and price estimating. Oversight of proposal, scope of work and specification preparation. Designed material handling systems. Project was successfully completed.
Additional Professional Consulting Experience
(overview only - detailed project duties available)
(UPS) United Parcel Service - Columbus, OH
Position: Site Project Manager (4-month project)
FORD ST LOUIS ASSEMBLY PLANT - St Louis, MO
Position: Senior Project Engineer (9-month project)
SATURN CORPORATION - Springhill, TN
Position: Site Project Manager (13-month project)
GM WILMINGTON ASSEMBLY PLANT - Wilmington, DE
Position: Senior Project Engineer (9-month project)
GORDON FOOD SERVICE DISTRIBUTION CENTER - Grand Rapids, MI
Position: Site Project Manager & Engineering Troubleshooter (16-month project)
FORD TRANSMISSION PLANT - Batavia, OH
Position: System Performance Monitor (6-week project)
GM TRUCK ASSEMBLY - Fort Wayne, IN
Position: Site Project Manager (14-month project)
K-MART FASHIONS DISTRIBUTION CENTER - Atlanta, GA
Position: System Start-up & Acceptance Manager (4-month project)
Previous Permanent Employee Experience
(overview only - detailed project duties available)
WEBB-STILES COMPANY - Gadsden, AL
POSITION: Engineering Manager / Regional Sales Manager (1987 to 1989)
LOGAN COMPANY - Louisville, KY
POSITION: Project Manager (1984 to 1987)
PUBLIC SERVICE OF INDIANA NUCLEAR POWER PLANT - Marble Hill, IN
POSITION: Project Construction Training & Development Manager (1981 to 1984)
BROWN & ROOT Petro Chem Solids Handling Div. - Houston, TX
POSITION: Senior Project Manager / Engineer (1980 to 1981)
LOUISVILLE TECHNICAL INSTITUTE - Louisville, KY
POSITION: Executive Director (1975 to 1980)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 51 to 100 of 1651)
Go to Search Parameters...
Brief Description
A Senior Contract Specialist with 25 years international experience on most types of construction/engineering projects worldwide.
More than 26 years of experience in this feild and capable of handling induvidual stores
Masters degree management. 20+ years commercial/ heavy industrial construction. Carpenter based w/15 years management
Contracts Experience in Construction, Management and Administration (EPC), Materials Manager (PMC), Materials Control, Procurement & Expeditor; Fluent in English, conversational in French, Russian. Seeking to continue professional career effectively utilizing my skills and gained experience
Registered Mechanical engineer with heavy industrial, mining and USACE construction experience.
25 YEARS OF MANAGING & BUILDING A/E PROJECTS EXCEEDING $ 600 MILLION BS & MS - CONSTRUCTION MANAGEMENT - MINOR IN CIVIL ENGINEERING - 4:00GPA FORMAL EDUCATION IN ARCHITECTURE -QUALIFIED WITH A.R.E IN THREE STATES
Commissioning Management
I have vast experience in the Safety related field.
CM Support of (3) State and Federally funded highway projects (2) Govt./Military Construction Projects; (1) Hi-Tech Facil. Control Upgrade; (3) Hospital Projects. (2) New civil underground water, gas, sewer and (3) major telecommunications infrastructure proj (2) Environmental – Remediation projects
Formal studies in civil engineering, information systems, business management and project management have provided me with extensive technical and financial expertise together with proven planning, coordination and control skills.
Twenty-five years in quality management including operations management, budget and manpower planning, supervision, project execution, quality system implementation, auditing, coordination and training during design, procurement and construction of international energy and petrochemical projects.
I have over 15 years of experience in construction management. I have expertise in contract negotiations, budgets, multi-tasking, leading teams of employees, EPA and OSHA, and many other areas.
Commercial Real Estate Agent, Construction Project Manager, Business Development Director
Project Manager 20 yrs experience Oil/Gas from Ground Up. Objective supported by: INTERNATIONAL PM MBA Ceng INSTRUMENTATION AND CONTROL HNC PROCESS CONTROL CONSTRUCTION SUPERVISION COMMISSIONING / AUDITING FISCAL MEASUREMENT SYSTEMS ENGLISH / SPANISH
Master in Construction Management. Hands-on experience in the field and in the office in the three basic specialties: civil, electric and mechanical. Computer skills with: Expedition and Primavera /Suretrack, Windows, Excel, Lotus etc.. Prepare the WBS, OBS, budget control etc..
I am an expert Civil Engineer with over 18 years of experience to offer. My most recent experience was Consultant Engineer in Kuwait. Furthermore, I work well with others, and I am experienced in project management. I've got the Master Degree in Construction Management.
I have been employed in the field of Power Engineering, Industrial Installations, Cement Industry and Sewage Treatment Plants at all stages, covering turnkey projects: erection, starting - up, commissioning, running and all kinds of maintenance.
A highly skilled industrial project construction & facility equipment installation management professional who has worked on projects from "cradle to grave" for various major companies. Over 15 years project management experience.
Twenty five years domestic and international experience in Prime Contracts and Subcontracts Management & Administration and Pricing involving all aspects of the procurement cycle.
A likeable personality and cool-headed professional. A 1991 graduate of Electrical/Electronic Engineering with proven experience in project management, process automation and information technology.
Senior Engineer / Traffic Management I am confident that my experience would allow me to make an immediate and significant contribution. I am attaching a brief overview of my work history and accomplishments for your review.
Sr. Subcontract Administrator with J.D. and Gov¡¦t, construction, international experience with FAR, UCC and SOX compliance
15 years experience in the construction industry.Professional Engineer from Ghana and MBA from the University of Houston. Plan to be certified in the US as soon as possible.
A performance-driven Mechanical Engineering professional with 15 years Sales and Marketing experience of elevators & escalators in India, Dubai, Sharjah, Kazakhstan and Kyrgyzstan, seeking an assignment as, Country Head (Sales)/ Senior Business Development Manager in Elevator Industry.
Facilities management, HR Management, Administration,- Mechanical Engineer, NEBOSH
I have over 20 years experience in construction management, both commercial and residental.
Joinery & Interior ESTIMATOR
Career objective: seeking a challenging managerial position with an established regional or national organization.
Multi-Million Dollar General Construction Project Manager
I have a complete knowledge of construction from footers to a complete building I also can run a successful business and handle all the employees with minimal interuptions
Upper management position with a company that encourages and empowers its employees, by
Ninteen years of diverse, multi-disciplinary experience in contract management, project planning, project budgeting and cost control related to industrial, construction and manufacturing.
Hospitality Development - Project Manager
Experienced Project Manager with proven success meeting the demands of her clients, providing professional construction and project management services on tenant and capital improvement projects.
Qualifications include over 25 years experience in management/supervision positions on various domestic projects and various international projects in countries such as Iraq, China, United Arab Emirates, India, Saudi Arabia, Bahrain and in other locations such as Puerto Rico, US Virgin Islands etc
Construction Manager Construction Project Manager Project Manager Civil Engineer Construction Engineer Structural Engineer Estimator
Exposed in Design and Construction of Infrastructure such as Road and Bridges, Drainage System, Bored Pile, Retaining Wall, Advance analysis on testing of pile foundation such as Dynamic testing Integrity testing and Static Load testing
A seasoned, highly organized construction professional with over 38 years of heavy industry experience which includes both industrial construction sites and field/shop fabrication locations in the Pulp & Paper, Petro-Chemical, Government, Hydro Electric, Institutional, Mining, Nuclear and Wind Power
HEAVY CIVIL STRUCTURES/ LUXURY HOUSING /BRIDGES/ DAMS SCHOOL / FACTORIES/WATERPIPE LINES&PUMP HOUSESSITE COSTINGSURVEY AND SETTING OUTCONCRETE TECHNOLOGYORGANISATION OF LABOUR AND PLANTJOINERYRENOVATIONS
Safety is my Passion
13+ Years of Experience in Overhead Power Transmission Line Projects/Construction
I am senior electrical engineer working in kharafi national as engineering and procurement team leaders
Mechanical engineer having a vast experience in general management for the vehicles fleet management, construction equipments, ground equipments with the most succesful profit and loss bases.
Over 12 years of experience in the area of ERP& CRM applications life cycle management in South East Asia, Middle East, India and Africa region. Managed complete SDLC from inception, design, construction & testing through to final delivery & support; IT auditing implementation in TRANE group of comp
Experienced mechanical engineer, with 2 years of design and project / construction management of oil & gas and petrochemical industry.Extensively travelled and executed projects in Middle East, Caspion region and in East Africa.Excellent leadership, self-starter, intensively motivated competent.
OBJECTIVE :- To strive and achieve excellence in functional areas , constantly strive and create value, and attain higher benchmarks. EMPLOYMENT EXPERIENCE: Over two decades of experience in the field of various Civil Engineering Projects.
21 year professional with experience in safety/operations turn arounds, business development, strategic planning, government regulations, P&L, Construction Equipment Operations/Maintenance and Construction Management.
Represent corporation at the regional / local level. Administer local contracts, interface with clients, assist with field issues, transportation, housing, energy. Fluent in ARABIC, ITALIAN, GREEK, SPANISH, ENGLISH. Knowledge on Libyan culture, customs, religion, geography, and geopolitics.
Am immediately available. I have 23-years Safety and Health experience, including: * 12-years in Production * 20-years Consulting/Training * 6-years in Construction Other experience: * 7.5-years Criminal Justice/Anti-Terrorism. * 26-years Emergency Medical Technician (EMT).
Performed conceptual design, design devel, work drawings, specs. Recent emphasis has been more on managing teams of architects and engineers, coordinating documents and specifications. Major strength is producing quality documents and teaching others to produce high quality work.
1
[ 2 ]
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com