CONTACT INFORMATION:
View contact information...
EDUCATION:
UNIVERSITY DEGREE:
Preparing the Thesis for the MASTER DEGREEin Construction Management.
From the Arab Academy For Science & Technology.
Finished courses: Project management, Systems engineering, Value engineering, Construction management, Tendering & Contracting, Advanced construction management,Construction Engineering, Equipment Management, Advanced construction engineering, Environmental impacts
Completing the preparation course for PMP certificate Project Management Professional held in AUC for all the project management Knowledge Areas: Integration management, Scope Management, Time Management, Cost Management, Quality Management, Human Resourses Management, Communication Management, Risk Management & Procurement Management.
B.SC Of Architecture, Alexandria University 1993. Faculty of Engineering.
EXPERIENCE:
TECHNIP Saudi Arabia
TECHNIP-COFLEXIP
EDF: Electricite De France,
CSI: Construction & Supply for Industry,
TECHNIP ITALY.
HASSAN ALLAM SONS,
THE ARAB CONTRACTORS.
QUALIFICATION
PMI member
COMPUTER SKILLS:
PRIMAVERA AUC certificate, Expedition, Excel, Microsoft Word, Access, AutoCAD, 3D Studio.
Professional Skills:
Planning Experience.
Contract Administration Experience.
Cost Control Experience.
Quantity Surveying Experience.
Company:
TECHNIP-Saudi Arabia
Period: From July,2004 till now.
Project: Diesel Hydrotreating Plant Project: DHT Project
Riyadh Refinery, Saudi Arabia.
Owner: ARAMCO
Title: Planning Engineer.
Duties:
- Responsible for work Scheduling: Updating of the weekly schedule, two weeks look ahead schedule, 28 days look ahead schedule & three months look ahead schedule.
- Preparing the Monthly Construction reports supported with all the details showing the progress achieved and the progress forecasted.
- Responsible for the weekly Matrix and progress submitted to the client in the different forms such as C1, C2 & C3 forms.
- Following the Contract between TECHNIP and the Owner and prepare the monthly work progress and Invoice.
- Responsible for answering and studying any Claims presented by the contractors relevent to the schedule and productivity matteres.
- Responsible for following and responding the letters and memos presented by the contractors.
- Responsible for Checking/preparing the Monthly Work progress and Invoicing for the Subcontractors: for the Civil Works, for Mechanical Works, for Tank Erection works, for Electrical & Instrumentation Works & for Painting and Insulation works.
- Responsible for following the scheduled required local materials through the Field Purchase orders.
- Responsible for updating the Procurement schedule.
- Responsible for updating the engineering schedule.
Company: TECHNIP-COFLEXIP
Period: From January,2003 till June,2004.
Project: THIOPAQ ACID GAS TREATMENT UNIT
Alexandria - Egypt.
Owner: AMOC: Alexandria Mineral Oils Company
Title: Planner & Contract Engineer.
Duties:
- Responsible for work Scheduling & Preparing the Monthly Construction reports.
- Responsible for following all the financial matters and prepare the monthly Cost Control reports: Petty Cash, Bank Status & the expenses monitoring Reports.
- Following the Contract between TECHNIP and the Owner and prepare the monthly work progress and Invoice.
- Responsible for answering and studying any Claims presented by the contractors.
- Responsible for following and responding the letters and memos presented by the contractors.
- Responsible for Checking/preparing the Monthly Work progress and Invoicing for the Subcontractors: VIBRO for Piling Works, MAS for the Civil Works, ESACO for Mechanical Works, DSD-Ferrometalco for Tank Erection works, PPC for Electrical & Instrumentation Works & CSI for Painting and Insulation works.
- Responsible for Issuing and following the required Field Purchase orders supported with all the necessary Cost Estimates.
- Responsible for issuing the variations and back charges.
- Responsible for the quantity surveying of the Piling works, Civil Works and Electro mechanical works.
- Responsible for Issuing the New Price Documents with the assistance of the Construction managements.
Company: Electricite De France (E.D.F)
Period: From August,2001 till January,2003.
Project: SUEZ GULF POWER PLANT
Ain El Sukhna - Egypt.
B.O.O.T Project.($ 500,000,000)
PORT SAID POWER PLANT
PORT SAID - Egypt.
B.O.O.T Project.($ 500,000,000)
Owner: E.D.F: Electricite De France
Title: Contract Engineer. FIDIC Contract.
Duties:
- Responsible for preparing all the Contractual Analysis needed in light of the FIDIC clauses and the technical specifications.
- Responsible for studying any Quotations presented by the contractors Techint Cimi Montubi and Foster Wheeler.
- Responsible for answering and studying any Claims presented by the contractors.
- Responsible for the implementation of the established strategies in accordance with the company Polices.
- Responsible for following and responding the letters and memos presented by the contractors.
- Responsible for preparing the Monthly Work progress and Invoicing.
- Responsible for issuing the variations and back charges, taking into consideration the analysis of the scopes and specifications for works and services to be performed by the Contractor.
- Responsible for the cost control system of the Electro-Mechanical Contracts.
- Responsible for preparing tender documentation for the items not covered by the original contract and assist in the evaluation of the presented bids.
- Responsible for the issuing of the monthly re-forecasting report of the contractual items.
- Responsible for the quantity surveying of the Electro mechanical works for: Condensing Plant, Steam Turbine, Generator, Rotating machines, Fabricated Equipment. Piping, Electrical works, HVAC, Water treatment Plant, Auxiliary Boiler, Ketc.
Company: CONSTRUCTION & SUPPLY FOR INDUSTRY (C.S.I)
Period: From May, 2001 till August, 2001.
Project: Sulphuric Acid Fums Extraction System
Owner: Egyptian plastics & Electrical Industries Company (E.P.E.C)
Consultant: ENDECO An Italian Consultant
Title: Contract & Planning Engineer
Internal Auditor of ISO 9001/2000
Duties:
- Responsible for receiving the invitations to bid and perform all the needed studies.
- Responsible for preparing all the necessary estimations and calculations needed to complete the bids documents.
- Responsible for planning all activities & processes needed to complete the project.
- Responsible for internal auditing of ISO 9001/2000.
- Responsible for preparing the Monthly Work progress and Invoicing.
- Responsible for the implementation of the established strategies in accordance with the company Polices.
- Responsible for preparing all the extra and additional works reports and their supporting documents.
- Responsible for the quantity surveying of the works.
Contents of the project:
-Civil works: foundations & Anchor bolts.
-Steel structure.
-Mechanical works: scrubbers D1,D2,D3,D4,D5,D6,D7.
-Piping works.
Company: TECHNIP ITALY,
Egypt Branch.
Period: March, 1999 up to May, 2001.
Project: NAPHTHA REFORMER COMPLEX.
Alexandria, Egypt. ($ 550,000,000)
Owner: Alexandria Petroleum Company.
Title: Planner & Contract Engineer.
Duties:
- Following the Planning activities: Break down of activities-Following up the progress using C1,C2,C3 Forms - Updating Schedule.
- Responsible for Checking the calculations and Prepare the Progress & Invoice of:
- Civil Works- Buildings- Electrical Works- Piping & Pipe supports- Steel Structures - Mechanical Works.
- Responsible for checking & Preparing the extra work and Work order documents.
- Prepare the New Price documents with the co-operation with the construction Management.
- Assisting in finding solutions for disputes and claims using the contract documents & any helping documents.
- Responsible for checking & preparing the AS BUILT drawings.
- Co-operation with the Cost control department in following up the project progress.
Contents of the Project:
- Cooling Tower.
- Equipment & vessels.
- Pumps.
- Pipe Racks.
- Compressors.
- Heaters.
- Concrete Basins.
- Foundations for vessels and equipment.
- Electrical Cable Trench.
- Sleeper Way for Cooling Water Pipe.
- Lube oil Consolle Compressor.
- Foundations for Light Tower.
- Underground System.
- Concrete Ditch.
- Roads & Yards, Concrete Paving.
- CONTROL BUILDING.
- SUBSTATION BUILDING.
Company: Misr Sons Development (Hassen Allam Sons)
PERIOD: Sep. 1997 to March, 1999.
Projects:
1) Mayorka Resort North Coast)
20 Million Pounds.
(6) Villas, (77) Attached Villas, (216) Flats,
(14) Swimming Pools, Administration Building,
Shopping Center, Mosque, Sporting Area.
Using: graviatto, kemplico, plastic paint, ceramic tiles, terrazzo tiles, porcelain, Marble, granite, aluminum windows, Aluminum handrails, False ceiling, Azmaldo, Decorative stones, Built-in furniture and gardens furniture.
2) Carbon Black Expansion (Line III), Amreya
Alexandria, Egypt.
6 Million Pounds (Indian Owner, British Consultant)
1st) Buildings:
Ware-House, Electrical Substation & control Room
& Air Compressor.
2nd) Civil Works: C.B.F.S Tanks, Bucket Elevator, Bag Filter,
Reactors, Silos, Pellitizer, Dryer, Incinator, Pipe Rack Foundations, Drains, Weight Bridge & Paving.
3) Venius Resort (North Coast)
50 Million Pounds.
(60) Villas, (44) Attached Villas, (496) Flats,
(24) Swimming Pools, Administration Building,
Shopping Center, Mosque, Sporting Area.
Using: graviatto, kemplico, plastic paint, ceramic tiles, terrazzo tiles, porcelain, Marble, granite, aluminum windows, Aluminum handrails, False ceiling, Azmaldo, Decorative stones, Built-in furniture and gardens furniture.
Title: Planner &Contract Engineer
Duties: Following all the Extra works in respect of the Contract Clauses.
Responsible for the Cost Control system.
Preparation of Work Progress.
Studying Quantities and Bidding.
Updating the Schedule.
Company: THE ARAB CONTRACTORS COMPANY,
Period: From April, 1995 TO Sep. 1997.
Projects:
1) Karakes Preparatory School, Beheira.
837,901,50 L.E
Ground floor + 4 Upper floors + 16 classrooms + 1 lab. + 2 W.C.+ 2 Administration rooms.
Using: Plastic painting, Terrazzo tiles, ceramic tiles, Granite, anti-acid ceramic tiles, steel create tiles, Aluminum windows and wooden doors.
2) BENY ABD EL BACKEY SOROUR - Primary School
Damanhour, Beheira.
1,032,463 L.E.
Ground floor + 4 Upper floors + 21 Classrooms + 3 W.C. + 2
Administration Rooms.
Using: Plastic painting, Terrazzo tiles, ceramic tiles, Granite, anti-acid ceramic tiles, steel create tiles, Aluminum windows and wooden doors.
3) SHARNOUB - Primary School, Beheira.
1,291,618 L.E
Ground floor + 4 Upper floors + 26 Classrooms + 3 W.C. + 1 Lab.
Using: Plastic painting, Terrazzo tiles, ceramic tiles, Granite, anti-acid ceramic tiles, steel create tiles, Aluminum windows and wooden doors.
4) MOAHZ IBN GABAL - Secondary School, Beheira.
881,091 L.E.
Ground floor + 4 Upper floors + 6 Classrooms + 1 W.C. + 2 Lab. + 2 Administration rooms + 1 Computer room + 1 Activity room.
Using: Plastic painting, Terrazzo tiles, ceramic tiles, Granite, anti-acid ceramic tiles, steel create tiles, Aluminum windows and wooden doors.
5) NEDIBA PREPARATORY School, Beheira.
1,314,135 L.E.
Ground floor + 4 Upper floors + 24 Classrooms + 2 W.C. + 1 Lab. + 2 Administration rooms + 1 Computer room + 1 Activity room.
Using: Plastic painting, Terrazzo tiles, ceramic tiles, Granite, anti-acid ceramic tiles, steel create tiles, Aluminum windows and wooden doors.
6) LAKANA AZHARIAN INSTITUTE, Beheira.
1,560,120 L.E.
Ground floor + 5 Upper floors + 30 Classrooms + 3 W.C. + 2 Lab. + 3 Administration rooms + 1 Computer room + 2 Activity room.
Using: Plastic painting, Terrazzo tiles, ceramic tiles, Granite, anti-acid ceramic tiles, steel create tiles, Aluminum windows and wooden doors.
Title: Contract & Field engineer.
Duties:
- Provide Supervision for all site activities & organize all field Operations.
- Provide Supervision for all finishing activities.
- Preparation of work Reports.
- Preparation of work Progress.
- Studying Quantities & Bidding.
- Reviewing Architectural Drawings.
- Following all the Extra works in respect of the Contract Clauses.
- Responsible for the Cost Control system.
REFERENCES ARE AVAILABLE UPON REQUEST.
View contact information... |