Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #35206 next resume »»
CONTACT INFORMATION:
View contact information...

Senior executive with highly successful record in operations, turnarounds, startups, P&L/project management, strategic planning, & business development.
Results-driven leader adept at capitalizing on opportunities, analyzing needs, solving problems, & managing teams.
* $600+ million/yr savings by eliminating OSHA violations. $200+ million/yr profit by doubling plant capacities.
* $200+ million/ship savings by implementing six sigma/reliability best practices and eliminating 75+% rework.
* $25+ million/yr savings by eliminating 50+% rework in semiconductor facility.
* Directed, managed, constructed, started up, developed, designed, & improved $multibillion production facilities.
* Outstanding communication, technical, & management skills. Managed 80+ person staffs/teams.

EDUCATION
MBA at University of South Carolina, Distinguished Student Award recipient, 3.9 GPA. 1988-91.
PhD work Chemical Engineering at University of California, Berkeley, 3.8 GPA. 1985-87.
MS Chemical Engineering at University of Delaware, 3.5 GPA 1982-83.
BS Chemical Engineering at State University of New York at Buffalo, Outstanding Student Award recipient, 3.9 GPA 1978-82.

EXPERIENCE
Project/Maintenance/ESH Eng. Mgr at NORTHROP GRUMMAN/WESTAR, 2nd largest defense contractor 2003-Present.
Led/directed engineering/reliability/ESH/maintenance/project management for multibillion-dollar composite shipbuilding processes.
* $200+ million/ship savings by eliminating 75% rework. Standardized/improved/developed/implemented: engineering design review & report/human factors/reliability/RAM/system safety/ incident tracking/MRP/operating manual/best practice systems.
* Developed/implemented: engineering (6 sigma/SPC)/safety/reliability/human factor/continuous improvement systems.

Sr. Systems Mgr./Eng. at PRAXAIR SEMICONDUCTORS/SAIC/WORTH, 2nd largest industrial gas firm 2000-2002.
Led engineering/ESH/operations management for semiconductor, aeronautical, $1.4 billion VX, & construction processes.
* $25+ million/yr savings by eliminating 50% rework. Standardized/improved/developed/implemented: MRP/ISO/engineering design review & report/operating manual/best practice systems. Determined chemical compatibility/cycle life/better labeling for system components. Tested/modeled air/z-purge/pipe flow/purge efficiency for cabinets and valve manifold boxes.
* Developed/implemented: design/safety systems, crane/VX PHAs, and JSA/investigation programs (due to 3 fatalities).

Process Engineer/ESH Manager at MILLENNIUM CHEMICALS, 2nd largest pigment producer 1995-99.
Led/developed/implemented/improved six sigma/ESH/operations/best practice management for multiple titanium dioxide pigment production facilities. Evaluated/commissioned capital projects.
* $200+ million/yr profit by doubling plant capacities. Commissioned reactors, conveyers, and spray dryers. Interacted with EPC contractors. Issued capital project feasibility/EVA reports (ore/coke silos, ore blend, CWC, steam/chlorine reduction).
* Used SPC six sigma/TQM/Intrinsic Safety/ERP to improve/troubleshoot daily production activities (Finishing/Chlorination, QA/Lab).
* Increased PSM program compliance from 50% to 100% ($300,000 savings by internally developing programs):
* Conducted/revalidated PHAs/HAZOPs (3000+ action items). Sized relief devices (by modeling release scenarios).
* Developed best practices (titanium tetrachloride release reduction, electrical classification/ventilation for fuels).
* Streamlined/enhanced Management of Change/Pre-Start-Up Safety Review/Emergency Response systems.

Mgmt/ESH Consultant at BOISE CASCADE/AMERICAN TAPE, 2nd largest office supply/paper producer 1993-95.
Led, directed, developed, implemented, evaluated & improved ESH/operational best practice management programs.
* $600 million/yr savings by eliminating OSHA violations (2 months ahead of deadlines) for two pressure-sensitive tape facilities.
* $400,000 savings by internally developing PSM/RMP programs using teams. Increased PSM program compliance from 5% to 100% for the pulp and paper mill (60% ahead of 2.5-year timeline).

Mgmt/Process/ESH/Eng. Consultant at JBF ASSOCIATES, largest risk management consulting firm 1991-93.
Led/managed landmark catastrophic $multimillion capital audits, PHAs, & developed/evaluated/improved ESH/PSM/RMP programs for chemical, paper, petroleum, nuclear, & pharmaceutical industry clients.
* Evaluated/enhanced OSHA-dictated PSM programs at various chemical facilities and paper mills.
* Completed PHAs: petroleum product marine terminal HAZOP, hydrogen utility system FMEA, material transfer process fault/event tree/ human risk assessment. Assessed restart capabilities and developed operational safety requirements for several nuclear facilities.
* Developed environmental RMP offsite consequence assessment methods for A.I.Ch.E./specific industrial clients. Published 2 A.I.Ch.E. PSM issue-related papers, 17 reports, and numerous proposals.

Process Engineer at WESTINGHOUSE/DUPONT, largest chemical producer 1987-91.
Led, directed/managed, developed, & started-up $multibillion production facilities.
* Led/directed startup of the $2.4 billion Defense Waste Processing Facility (DWPF). Interacted with EPC contractors. Simulated Salt Process procedures on DCS. Placed the organic waste storage tank in operational order.
* Managed/directed startup of the $150 million Replacement Tritium Facility (RTF). Interacted with EPC contractors. Directed/installed metal hydride beds (one month ahead of 3-month schedule). Redesigned in-bed nitrogen feed system (a vital tritium accountability component).
* Led/directed construction of $7 million Thermal Cycling Absorption Process for the Tritium Production Facility. Communication catalyst: Voluntarily relocated to the production area to keep project going (due to a production personnel shortage). Redirected project plans and scope (increased process scale, redesigned "leaky" aluminum column to stainless steel) to be relevant to RTF's and production's needs. Completed construction turnover. Transferred responsibilities back to production.
* Managed operation of the Advanced Hydride Laboratory, the RTF's $4 million pilot plant. Discovered leaky nitrogen valves and recommended tighter-sealing valves for the RTF ($3 million cost savings). Implemented/ evaluated/documented metal hydride tests/results. Programmed process control system.

Process Design/Development Engineer at ALAMEDA INSTRUMENTS, semiconductor startup firm 1987.
Led/designed novel sulfuric acid and hydrofluoric acid reprocessors for semiconductor industry clients.

Process Development Engineer at CELANESE, largest methanol & 2nd largest fibers producer 1984-85.
Led/managed economic feasibility studies for new/improved chemical production processes. Used process simulation software to support the economic evaluations:
* Investigated using methanol as diesel fuel. Proved coal-processing costs made methanol uneconomical.
* Developed reactive distillation software package. Tested package (for ethylene glycol/polyol production).
* Produced economical Ibuprofen production comparisons for various reaction/feedstock scenarios.

Industrial Intern (M.Ch.E. Thesis) at GLAXO SMITHKLINE, large pharmaceutical/specialty chemical manufacturer 1982-83.
Led/managed a process development study for a new pharmaceutical product (market value: $0.5 million/lb):
* Enhanced membrane fractionation between the product & an excess reactant by selectively binding the product with polymers.
* Developed a thermodynamic model to quantify the product-polymer binding interactions.
* Analyzed experimental results using high-performance liquid chromatography (HPLC) & freeze-drying.

Development Engineer at W.R. GRACE Summer 1982.
Quality Assurance Engineer at DUPONT Summer 1981.

PROFESSIONAL ACTIVITIES
American Institute of Chemical Engineers (A.I.Ch.E.).
American Society of Safety Engineers (ASSE). Former CSP/OHST.
Registered Professional Engineer (P.E.) in Michigan and Ohio.
Advanced Toastmaster/Competent Leader/District PR/President/Area Governor.
Top Secret Security Clearance.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1051 to 1100 of 1817)Go to Search Parameters...
Brief Description
Chemical engineer with 17 years petrochemical work experience with experienece in Oracle VB6 , AutoLISP
Nanagement engineer power utilities oil gas construction
Knowledgeable in all aspects of capital projects including but not limited to the planning phase, progress and cost tracking, material requisitioning, project reporting, project documentation, and scheduling. Proficient in analyzing cost trends and variances for clarification or correction.
Provide technical expertise, guidance and leadership for a variety of designated engineering projects at site.
SENIOR PLANNING ENGINEER (OIL & GAS)
Results-Driven Leader/Senior Executive, BS/MS/PhD work ChE, MBA, PE, 25+ years experience
Senior level treasury generalist with 20 years of experience in the treasury department of three Fortune 500 companies. Successful track record of transitioning treasury departments following acquisitions.
Maintenance, water purification, reverse osmosis, materials, logistics, management
Worked experience of 4 yrs. in the field of EIA and EMP for various infrastructure and construction projects including world bank funded projects.
Well prepared civil engineer with a construction management background and good interpersonal relations, communication and problem solving skills
Captain looking for a challanging position shore based as Marine/HSE Superintendent- Manager. I am an unlimited Master Mariner and I have recently achieved a MSc in Marine Operations and Safety Management.
I am a Senior Process Engineer in oil & gas systems. Along my 18 years experience in the field, I have held a number of positions going form operation to project execution and management and process engineering activities. I am fluent in English, French and Arabic.
Mail – Executive \ Personal Secretary \Office Co-ordinator
Progressively Responsible of a range of Purchasing/Warehousing Management, Organization & Administration positions with worldwide procurement (national & international); Contribution and Direct Involvement in all previous jobs with regards to purchasing of spare parts and materials required for all
Logistics, Procurement and Materials Manager (Supply chain)
Experienced Design Engineer
A solid background in project controls, project coordination, project scheduling, and records management with over twelve years combined experience in these areas.
Procurement Manager with over 15years Multidisciplinary experience, providing Managerial, Engineering, Information Technology for onshore/offshore rigs and office operations in Procurement, Warehousing and Logistics.
A project management and business development professional with extensive experience in bid management through to contractual completion. An impressive record in winning new business, and managing and completing projects on time and under budget.
Contracts & Global Procurement Manager, Change Agent, Systems Initiation, Strategic Sourcing, Seasoned Negotiator, Proven Organizational & Team Leadership, Collaborative Mgmt. Style, Broad knowledge of OEMs & Suppliers, Contractor Oversight, Systems & Procedures, Middle East Mega-Project Experience.
An experienced security professional with 24 years of strong corporate security and law enforcement qualifications who has demonstrated a high level of success in a variety of significant and highly critical assignments in a fast paced environment. Also has an impressive track record of hands-on exp
I am a mining engineer and also has a masters degree in urban and regional planning.
Buyer/Planner Skilled in Inventory Management, Cost Reduction, Sourcing and Negotiation
I desire a position as manager or associate manager to help grow and expand the company. My experiences so far include the former establishment of a home based import/export business with experiences in cultural behavior and product negotiations with foreign companies.
Channel sales, Institutional sales, Oem sales, Business development, International sales
He has more than 25 years of experience; from his current work in hydrogeological and hydrochemical assessment, environmental monitoring, and capacity building. He has managed many projects as well as acted as team leader on various project components.
Construction HSE Manager with 18 years of experience encompassing the areas of Safety Adviser through to Corporate HSE Manager. Formerly a Senior ranking Fire Officer (nine years experience). Five year apprenticeship served as a mech. engineer. Degreed engineer with both off-shore and on-shore exp.
I have experience in various phases of procurement, cost, and accounting within the construction management industry. I have been in procurement field as well as in project controls for more than four years with a successful project track record.
I'm a Site Engineer with 3+years of Exp as a Site Engineer, Roads at KMC Constructions Ltd. , India.
Software Developer .NET, Java SQL
Utilize management and organization skills acquired through previous positions in
I have an overall experience of 17 years out of which 11 years in Oil & Gas Development Projects. Presently I am working as Group Project Engineer in a Major British Exploration & Production Company in Edinburgh UK. Following are my current responsibilities:
Contracts Manager
Process Plant Manager, Metallurgical Management, Production Manager, Chief Sorter and Certified Flow-Sort X-Ray Machine operator.
• Extensive experience managing Document Control deparments within Engineering, Construction and Petrochemical Industries.
Project Controls / Project Services / Business Management
Project Management / Production Control
Site Construction Manager Oil and gas Industry. Over 20 years experience. Process plants, facilities and pipelines.
Project control engineer with experience in planning and cost engineerig fields.
A self-directed, high organized individual who is able to easily identify and achieve priorities. Significant broad based experience in the areas of facilities planning, production, engineering, maintenance, environmental, staffing, and safety. Excellent communication and technical report writing
I have done my MBA and Diploma in information technology. I have worked in diffrent feilds
Instrumentation, Construction Engineer, Commissioning Engineer, Shutdown, Turnaround, I/E Lead, Designer, Design Specialist, Field Engineer, EPC, AutoCAD
Marine Engineering, Risk Assessment, Lloyds Surveyor, Project Management FPSO Projects worldwide
Extensive and progressively responsible hands-on management experience.
•Nebosh International certificate in Occupational Health and Safety , Membership Examaination of The Institution of Fire Engineers UK., Fire Officer course from National Fire Service College Nagpur India
Welding Engineer
BE,MBA graduage having 13+ years experience in Sales & Marketing of Engineering, Flow Control & Instrumentation Process Products
A proactive leader with extensive reliability centered maintenance management and hands-on experience in the repair, overhaul and troubleshooting of mobile equipment, initiate change and reengineering of quality improvement processes while maintaining a positive, safe and productive environment.
With more than ten (10) years of extensive experience and knowledge in Pipe stress calculation and support design of oil & gas, petrochemical, refinery, chemical, LNG, LPG, onshore, nuclear power plant and subsea piping projects.
Security Manager
1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   [ 22 ]   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com