CONTACT INFORMATION:
View contact information...
Prospectus ØI have provided supervision, client representative, QA/QC and technical services to the construction industry since 1979. My background and experience in mechanical, piping, and welding technology on numerous projects throughout the U.S and Foreign Countries. My ability to "get the job done" is evident throughout my resume listing several of America's largest companies and work scope accomplishments. References furnished upon request. Certification & Training * Associate Degree-Welding Engineering Technology -Orange County, Coast College. * AWS Fundamental of Welding Inspection -Certificate-AWS. * Successfully completed classroom inspection training and testing to API-510-Pacific Technical. Qualifications * Twenty - three years experience in Supervision, QA/QC, Engineering and Welding Technology. * Extensive project experience in Petro-Chemical Facilities, Power Facilities (Fossil Fuel, Co-Generation, Steam Turbines, and Combine Cycle). Pipelines, pumping/receiving stations. * . * In depth working knowledge of codes: ASME B31.1, AWS D1.1, API 1104, API 650, and API 510. * Secondary language in Filipino, Tagalog (conversational) * Secondary language in Spanish (conversational).
WORK HISTORY:
2003 LURGI, LENTJES, BISCHOFT, NORTH AMERICA
SCR PROJECT (Selective Catalyst Reduction) 2 - 500 MW COAL FIRED UNITS, HOOSIER ENERGY, SULLIVAN, IN.
PIPING ENGINEER, ASSISTANT STARTUP MANAGER
Responsibilities Included:
* Directed and Assisted General, Subcontractors to comply with the contract and specifications, review address and resolve issues during construction including 2 major outages while construction was in progress.
* Dailey, Weekly and Monthly Progress Reports to LLBNA, Contractors and Hoosier Energy Management on progress, concerns and resolve issues.
* Attend Contractor and Owner Meetings to Review and Resolve Project Concerns
* Implemented and Monitored "Punch list" of Mechanical and Piping Systems.
* Reviewed, Directed and Assisted with Startup and Commercial Completion of Mechanical Piping, Electrical and I&C Systems.
* Directed and Assisted with turnover of Systems and Equipment to Plant Operations and Hoosier Energy Management as required.
* Contract Completed.
2002 ABB/ALSTOM POWER
BELLINGHAM POWER PROJECT 529 MW COMBINE CYCLE POWER PLANT,
BELLINGHAM, MASS.
SYSTEMS TURNOVER MANAGER
Responsibilities Included:
* Provide Support, Leadership for the Project and Management.
* Dailey, Weekly and Monthly Progress Reports to Project Management.
* Implement Tracking System for Progress and Completion of Power Plant Systems for
* Construction, Mechanical, Electrical, Commissioning for Commercial Completion.
* Implement Project Master Punch list for all Contractors and Update, Review and Report Progress and Completion.
* Attend Contractor and Owner Meetings to Review and Resolve Project Concerns
Compiled Reviewed all Regulatory Local, State and Federal Permits.
* Review and Compile Turnover Packages Data and Documents, to assure organized transition to the Owner for Commercial Completion and Start-up of Facility.
* Contract Completed.
2001 -2002 ABB/ALSTOM POWER BLACKSTONE POWER PROJECT 529 MW COMBINE CYCLE
POWER PLANT, BLACKSTONE, MASS.
SYSTEMS TURNOVER CORDINATOR
Responsibilities Included:
* Provide Support, Leadership to the Project and Management.
* Dailey, Weekly and Monthly Progress Reports to Site Manager.
* Attend Contractor and Owner Meetings to Review and Resolve Project Concerns.
* Track, Monitor and Update Progress of Power Plant Systems for Construction, Mechanical Electrical and Commissioning/Startup for Commercial Completion.
* Review, Approve Audits of Sub Contractors, Procedures, Inspection and Test Plans.
* Review and Compile Turnover Packages Data and Documents, assure organized transition to the Owner for Commercial Completion and Start-up.
* Supervisor " Punch list " for Mechanical, Electrical, Civil, Painting and Yard Items.
* Compiled / Reviewed all Regulatory Local, State and Federal Permits for Owner Turnover for Commercial Completion.
* Contracted Completed.
2000 - 2001
COASTAL CORP. E & C, OYSTER CREEK PIPLINE PROJECT/AMONIA PLANT
CREEK, TX.
CONSTRUCTION MANAGER, (Owner Representative)
* Responsibilities Included:
* Review Contracts, and Mobilization/Demobilization of Contractors. Provide Leadership, Support and Monitor General, Sub-contractors. To perform work task within Contract and Specifications. Interface with Coastal Plant Manager, Dow Chemical, Solutia Chemical, BASF Chemical, Air Liquid Representatives, and Update Construction Activities.
* Excavation/Civil and Structural Activities.
* Hot tap Installation, 6 in. Ammonia Pipeline (1).
* Installation 4,000 ft. 4in.Dia. /6in.Dia. A 333 Low Temp. Pipe Misc. Piping and N.D.E.
* New Meter Run (1). Modification (2) existing Meter Runs
* Road Bores (3).
* Electrical/Instrumentation.
* Cathodic Protection, Painting and Protective Coatings.
* Hydro Testing, Dewatering, Lay Down Nitrogen Purge.
* Commissioning of Pipeline, Official Sign off and Documents.
* Contract Completed.
1999-2000 COASTAL CORPORATION
COASTAL E/C, COASTAL REFINERY ARUBA, Dutch West Indies.
CONSTRUCTION SUPERVISOR (Owner Representative)
Responsibilities Included:
* Directed and assisted Contractors/Personnel to work within the Contract and Specifications. Provide Leadership to achieve Schedule completions and assure Quality of Project. Project was completed on Time and within Budget.
* Refurbish (2) Crude Heaters, and (1) Hydrogen Reformer.
* Complete re-tube, Chrome Alloys, HK800 Alloy.
* Renew Refractory
* Renew all related Piping/Headers and Supports/Hangers.
* Concrete Structure (repairs) and Fireproofing.
* Installation of 2 New Stacks.
* Structural Steel Repairs/Reinforcements.
* Installation related Equipment.
* NDE, Nitrogen Test.
* Sandblasting/Painting.
* Scheduling/Implementing Construction and Commissioning and Start-up activities
* After completing above Project, performed as QA/QC Supervisor on new Coker Facility, for Construction, Piping, Mechanical and Structural.
* Contract Completed.
1998-1999 COASTAL CORPORATION / COASTAL TECHNOLOGIY NICARAGUA, TIPITAPA
POWER PROJECT - 50 MEGAWATT, DEISEL FIRED reciprocating engines
MECHANICAL SUPERVISOR (Owner Representative)
Responsibilities Included:
* Contractors to Perform work within scope of Contract/Specifications.
* Installation of Power Plant Equipment.
* HRSG System
* Construction of HFO & LFO Tanks.
* Fire Protection System, Under/Above Ground.
* Installation of Piping Systems, N.D.E., Structural Components Supports/Hangers.
Insulation
* Painting Tanks, Piping Systems. Structural Components.
* Commissioning/Startup Commercial Completion of Power Plant Facility.
* Official Sign-off and Documentation.
* Project completed on Schedule and within Budget.
* Contract Completed.
1999 COASTAL REFINERY ARUBA, DUTCH WEST INDIES
AREA SUPERINTENTANT, (Owner Representative)
Responsibilities Included:
* Provide Leadership and Support to, Supervisors, Personnel and Contractors during Plant Shut Down. Complete Schedule Deadlines.
* Scope of Work Performed Mechanical, Piping, Fabrication, Demo and Installation, Hot Taps at 10 Process Units, Tank Farm, (2) 25 MW Steam Turbine Power Plants and Utilities. Phase 1 and 2 Projects.
* Attend Progress meetings, With Project and Plant Managers, Supervisory Personnel discuss Safety, Status, on going Work, Review and Correct Issues.
* Project (total plant shutdown), completed on Schedule (300,000 MH's).
* Total Manpower 2,700 Expatiates, Aruban, Filipinos, and Turkish Countrymen.
* Contract Completed.
1998 COASTAL CORPORATION
COASTAL OYSTER CREEK TEXAS AMMONIA PLANT, PIPELINE PROJECT
CONSTRUCTION SUPERVISOR (Owner Representative)
Responsibilities Included:
* Contractor Perform works within Scope of Contract/Specifications.
* 32 mile Refurbishment 10in. Dia. Pipe 250 W.T. and N.D.E.
* 6 Miles, Low Temp, A333, 6in.Dia. Pipe. 250 W.T and N.D.E.
* Installation of Metering Skids (2)
* Dummy/Smart Pigging, Hydrostatic Testing, De-watering, Nitrogen Purge.
* Assisting Contractors with Working Methods to stay on Schedule.
* Cathodic Protection, Painting and Protective Coating.
* Official Sign-off and Documentation.
* Contract Completed.
1996-1997 COASTAL CORPORATION SUBIC BAY, CLARKFIELD, PHILIPPINES
CONSTRUCTION SUPERVISOR (Owner Representative)
Responsibilities Included:
* Pipeline Refurbishment Project, Former U.S. Pacific Pipeline (10" Dia.), Receiving and Pump Stations.
* Related new construction. Coordination/Implementation of Scope of work with
Contractors and Filipino Work Force.
* Refurbishment of 32 miles and Installation 10 Miles of New 10" Dia. Pipe 219 W.T.
* Refurbishment of Pumping and Receiving Stations.
* 3,800 ft Horizontal Directional Drill 10" Dia. Pipe. 500 W.T.
* Aerial River Crossings (3) Fabrication and Installation of Pipe Supports.
* Repair Sections of 10" Dia. Pipe, 219 W.T. (100+)
* Modifications/New Valve Stations, 10 Total.
* Dummy/Smart Pigging, 32 miles 10" Dia. Pipe, 219 W.T.
* N.D.E., Hydro Testing /De-watering / Nitrogen Purge, 32 miles 10" Dia. Pipe, 219 W.T.
* Commissioning and Startup of Pipeline, Pumping and Receiving Stations Official Sign-off and Documentation.
* Contract Completed.
1996 TOTAL WESTERN INC., UNOCAL PIPELINE, BREA, CA.
CONSTRUCTION SUPERVISOR
Responsibilities Included:
* Installation of 6 Miles 2, 6, 8 in. Dia. Pipe Crude Oil Pipelines, Gathering System to Tonner Tank Farm. Scheduling/Planning an Implementation Personnel, Material, Equipment, N.D.E., Protective Coatings, Cathodic Protection, Pigging, Hydrostatic Testing, De-watering of Pipeline official Sign-off and Documentation.. Contract Completed.
1996 INSPECTION SPECIALIST INC., COASTAL REFINERY, CORPUS CHRIST, TX
VISUAL INSPECTOR-SHUTDOWN/COKER INSPECTION, (Owner Representative)
Responsibilities Included:
* Piping Modifications. Contract Completed. Contract Completed.
1996 PHIBRO REFINERY, TEXAS CITY, TX
VISUAL INSPECTOR (Owner Representative)
, Responsibilities Included:
* Inspection of Reactor and Regenerator. Renew and Repairs including Structural Components, Reactor Head, Primary and Secondary Cyclones, Internal Riser Line, Air Grid, and related Equipment. Contract Completed.
1996 TOTAL WESTERN INC., ARCO PIPELINE, LOS ANGELES, CA
CONSTRUCTION SUPERVISOR
Responsibilities Included:
* Pipeline Projects, New/Pickup and Relay Sections of Pipelines, Upgrading of Pipelines. Contract Completed.
1995 SUN OIL REFINERY, MARCUS HOOK, PA.
VISUAL INSPECTOR, (Owner Representative)
Responsibilities Included:
* Inspection of New and Existing Piping, Nozzles, Vessels, Drums, and Columns. Contract Completed.
1994 COASTAL REFINERY, WESTVILLE, NJ.
VISUAL INSPECTOR - CRUDE UNIT SHUTDOWN (Owner Representative)
Responsibilities Included:
* Inspection of Drums, Heaters, Pressure Vessels, Exchangers, and Miscellaneous
Equipment. Contract Completed.
1994 TEXACO REFINERY, ANACORTES, WA
VISUAL INSPECTOR-TOTAL PLANT SHUTDOWN, (Owner Representative)
Responsibilities Included:
* Welder Qualifications, Inspection of New and Existing Process Piping, and Nozzle Modifications to Vessels, Drums and Columns. Contract Completed.
1993-1994 JOHNSON CONSTRUCTION, LOS ANGELES, CA
CONSTRUCTION SUPERVISOR
Responsibilities Included:
* Under/Above ground Piping Projects at G.A.T.X. Tank Farm, New Construction and Modifications-2"through 16" Pipe. Contract Completed.
1993 COASTAL REFINERY, ARUBA, Dutch West Indies
VISUAL INSPECTOR (Owner Representative)
Responsibilities Included:
* Exchanger Inspection of Bundles, Hydro Blasting of Tubes for Cleanliness, Inspection for Wear, Damage to Hardware, and all Components I.D., O.D. Calibration Thickness Readings of Tubes. Contract Completed.
1993 PENZOIL REFINERY, ROOSEVELT, UT
VISUAL INSPECTOR-FCCU UNIT, (Owner Representative)
Responsibilities Included:
* Welding, Repairs and Installation. New/Existing Piping Nozzle Modifications, Drums, Vessels, Columns. Contract Completed.
1992 TEXACO REFINERY, ESQUINTA, GUATAMALA
CONTRUCTION SUPERVISOR, (Owner Representative)
Responsibilities Included:
* Construction Personnel Expatriate/Guatemalan workforce. Renew/repair Piping Systems, Nozzles-Equipment, Drums, Heaters, and Columns. Contract Completed.
1992 JOHNSON CONSTRUCTION CO. UNOCAL REFINERY, LOS ANGELES, CA
CONSTRUCTION SUPERVISOR
Responsibilities Included:
* Pipeline Modifications to Increase Production/Capacity, 2" through 12" Dia. Pipe. Construction Personnel Welders, Pipe fitters, Helpers, Excavation Crews and Laborers. Contract Completed.
1992 INTERCONTINENTAL SERVICE CO. MOBIL OIL REFINERY, CHALMETTE, La
VISUAL INSPECTOR-TURNAROUND, VCC UNIT, (Owner Representative)
Responsibilities Included:
* Inspection of Equipment, Recommendations for Repair/Replacement as Required.
Documentation and Official Sign-off. Contract Completed.
1991 COLLINS & ASSOCIATES TECHNICAL SERVICE INC, TOLEDO, OH
INSPECTION SUPERVISOR-ASSIGNED TO SPECIAL PROJECTS
SUPERVISING SHUTDOWNS AND TURNAROUNDS, (Owner Representative)
Responsibilities Included:
* Inspection of New/Existing Process Piping Installations. Welder qualifications, Pressure Vessels. NDE/Hydrostatic Testing, Pneumatic and In Service Testing and Mechanical. Completion of Process Piping Systems and Pressure Vessel Modification. Recommend Equipment Repairs/Replacement as Required. Contract Completed.
1988-1991 BUCK'S WELDING & CONSTRUCTION, LONG BEACH, CA
CONSTRUCTION SUPERVISOR
Responsibilities Included:
* Fabrication, Piping. Structural and Vessel Projects in New Construction and Modification. Contract Completed.
1987 HEATH CONSTRUCTION, NORWALK, CA
PIPING/WELDING SUPERVISOR- Co-generation Power Plant, 10 Megawatt, Oil Fired.
1986 ROGER'S CONSTRUCTION, PHEONIX, AZ
CONSRUCTION SUPERVISOR
Central Arizona - Water Project, Pumping Station and Turn - outs.
1985 REINHOLDT PIPELINE CONSTRUCTION, PHEONIX, AZ.
CONSTRUCTION SUPERVISOR - Pipeline Distribution Southwest Gas.
1983-1984 DURANGO PIPELINE CORPORATION, LOST HILLS, CA
CONSTRUCTION SUPERVISOR - Getty Gas Plant, Welding Supervisor.
1981-1982 NORTHWEST PIPELINE, SALT LAKE CITY, UT
VISUAL INSPECTOR-Pipeline Projects Western United States, Owner Representative.
View contact information... |