Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #64172
next resume »»
CONTACT INFORMATION:
View contact information...
Career Summary
Almost seven years experience in estimating and other related job for bid proposal and live project for fabrication and installation offshore oil and gas platforms.
Job & Responsibility
Estimator: (Batam Fabrication Yard) (Daily job and responsibility): J. Ray McDermott Indonesia, Batam,
Report to Estimating Manager
Responsible for:
- Preparing and reviewing estimate all discipline for unit rate or lump sum bid projects. Provide inputs and all related technical information to procurement, scheduling and yard support (material take off and construction engineering).
- Reviewing all subcontractor cost input and RFQ documentation received.
- Monitoring and evaluating manhours expenditure in the Fabrication Yard
- Identifying and assisting in resolving any adverse trends with coordination with Supervisor.
- Preparing and breakdown fabrication cost, material, labor, subcontract into client bid price format.
- Providing all required Estimating based on Material Take-Off to relevant departments for projects in progress in the Fabrication Yard
- Providing and Maintaining control of all fabrication project job numbers and sub functions issued and utilized within the Fabrication Yard
- Ensuring that project history files are maintained and updated for completed fabrication projects.
- Prepare Table of Rates in accordance to the preamble, method of measurement.
- Prepare recap man-hours of completed project for review, study and address problems to improve productivity of future projects.
Major Bid project involved:
* Unocal Thailand North Pailin Development Project – Phase II (2001) consists of:
- Topsides defined as: Bridge (270 ST), Cooler Module (270 ST), Module Support Frame – MSF (2,487 ST), East Module (2,128 ST), & West Module (1,803 ST).
* Phillips – Bayu Undan Gas Recycle Project (2001) consists of:
- 8 legs DPP ( Drilling Process & Production ) Jacket (11,256 MT) and 8 legs CUQ ( Compression Utilities & Quarter ) Jacket (10,786 MT)
- Flare Tripod (789 MT)
- Connecting Bridge between DPP and CUQ (416 MT) and Flare Bridge (1,905 MT).
* Conoco Indonesia Inc. – Belanak FPSO (2001) consists of 14 modules, 3 pipe racks, 2 riser porches, and 1 flare boom, with total weight is 24,535 MT.
* Japan Vietnam Petroleum Company – Rangdong Field Development (2002) consists of:
- NCWI Deck (2,552 MT) and NULQ Deck (1,779 MT)
* Conoco Indonesia Inc. – Belanak Wellhead Platforms WHP-A & WHP-B (2001) consists of:
- WHP-A Deck (1,620 MT) and WHP-B Deck (1,622 MT)
* Dominion Spar Hull – Devils Tower Mississippi Canyon 773(2002) consists of Hard Tank, Truss, and Soft Tank with total Load out Weight (11,087 MT)
* PTTEP Arthit Field Development Project (2004) consists of:
- Topsides CPP Deck float over system with total weight 18,000 MT.
* Cuu Long Joint OperationCompany Su Tu Vang CPP, Pipeline and PLEM Field Development Project (2005) consists of:
- Topsides CPP Deck floats over system with total weight 18,000 MT.
- Pipeline and PLEM
- WHP-A Modification
* Cuu Long Joint OperationCompany Su Tu Vang CPP, Pipeline and PLEM Field Development Project (2005) consists of:
- Topsides CPP Deck floats over system with total weight 16,000 MT.
- Bridge and Flare boom
- Pipeline and PLEM
- WHP-A Modification
* Conoco Philips – North Belut Development Project (2006) consists of:
- Topsides CPP Deck floats over system with total weight 14,000 MT.
- Bridge and Flare boom.
* Conoco Philips – North Belut Development Project (2006) consists of:
- Topsides CPP Deck floats over system with total weight 14,000 MT.
- Bridge and Flare boom
* Carigali PTTEP Joint Operation Field Development Project Cetral Facility Platform (2006) consists of:
- Topsides CPP Deck float over system with total weight 18,000 MT.
* Woodside Energy Ltd, North Rankin Field Development Project (2007) consists of:
- Topsides NRB Deck float over system with total weight 22,000 MT.
* Woodside Energy Ltd, North Rankin Field Development Project (2007) consists of:
- Topsides NRB Substructure Jacket and Bridge system with total weight 18,000 MT.
Piping and Mechanical Estimator/Quantity Surveyor: (live Project Assignment) (Batam Fabrication Yard): J. Ray McDermott Indonesia, Batam,
Report to Estimating Manager/Project Cost Control
Responsible for:
- Providing all required Estimating based on Material Take-Off to relevant departments for projects in progress in the Fabrication Yard
- Providing and Maintaining control of all fabrication project job numbers and sub functions issued and utilized within the Fabrication Yard
- Ensuring that project history files are maintained and updated for completed fabrication projects.
- Providing Weight Control Report complete with Center of Gravity for piping project in progress in the Fabrication Yard.
- Prepare estimate man-hours and BOM.
- Prepare data related to table of rates in accordance to the preamble, method of measurement.
- Perform Quantity Surveyor work, checking and verifying site measurement and accordance to Table of Rates.
- Prepare estimate man-hours & MTO for all Change Order works.
- Prepare recap man-hours and BOM of completed project for review, study and address problems to improve productivity of future projects.
Major Live Project involved:
* Unocal Thailand North Pailin Development Project – Phase II (2001 -2002) consists of:
- Topsides defined as: Bridge (270 ST), Cooler Module (270 ST), Module Support Frame – MSF (2,487 ST), East Module (2,128 ST), & West Module (1,803 ST).
* Phillips – Bayu Undan Gas Recycle Project (2001-2002) consists of:
- 8 legs DPP ( Drilling Process & Production ) Jacket (11,256 MT) and 8 legs CUQ ( Compression Utilities & Quarter ) Jacket (10,786 MT)
- Flare Tripod (789 MT)
- Connecting Bridge between DPP and CUQ (416 MT) and Flare Bridge (1,905 MT).
* Conoco Indonesia Inc. – Belanak FPSO (2002-2004) consists of 14 modules, 3 pipe racks, 2 riser porches, and 1 flare boom, with total weight is 24,535 MT.
* Japan Vietnam Petroleum Company – Rangdong Field Development (2003-2004) consists of:
- NCWI Deck (2,552 MT) and NULQ Deck (1,779 MT)
* Conoco Indonesia Inc. – Belanak Wellhead Platforms WHP-A & WHP-B (2003) consists of:
- WHP-A Deck (1,620 MT) and WHP-B Deck (1,622 MT)
* Dominion Spar Hull – Devils Tower Mississippi Canyon 773(2003) consists of Hard Tank, Truss, and Soft Tank with total Load out Weight (11,087 MT)
* PTTEP Arthit Field Development Project (2005-2007) consists of:
- Topsides CPP Deck float over system with total weight 18,000 MT.
* Cuu Long Joint OperationCompany Su Tu Vang CPP, Pipeline and PLEM Field Development Project (2007-2008) consists of:
- Topsides CPP Deck floats over system with total weight 18,000 MT.
- Pipeline and PLEM
- WHP-A Modification
Professional Skill:
- Computer Literacy on Microsoft office.
- Able to read and fully understand of P&ID, isometric, Piping general arrangement and other related construction drawing.
- Familiar with oil and gas international standard (e.g. ASME, ANSI, API, ASTM Standard )
- Familiar with Oil and Gas material for onshore and offshore application.
- Able to review process (piping and mechanical) specification
- Able to review all bid documents related to fabrication and installation purpose and raise any clarification/qualification to client.
Education
Mechanical Engineering at Syiah Kuala University, 1999.
GPA 2.90 (scale 4.0)
Training and Courses
On job training at Mobil Oil Indonesia, Inc, Lhok Sukon
Apprentice at PT. Arun NGL.Co
Basic Piping Design Course
Basic Material Selective Course
Performance Management Course
Basic First Aid Course
SQL Piping Take off and Material Control System
Project Risk and Opportunity Management (PROM)
Ethics & Compliance Training
Firms
Feb. 2001 – Present: J. Ray McDermott Indonesia – Batam Fabrication Yard
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1301 to 1350 of 1649)
Go to Search Parameters...
Brief Description
I have Masters Degree in Geology with experience in Coal Exploration.
CSWIP 3.1, ASNT level II in RT, UT, MT and PT, ISO 9000:2000 Lead Auditor
Construction Manager, Side Manager, Supervisor, Hydraulics Engenieer
Brilliancy in learning and application of complex Technology, Problem solving Technique, And above average IQ level.. Electrical and Electronics Engineer with Abu Dhabi Ministry approved Primavera 3.1 Certificate.
Supervising, Inspection, Installation, Maintenance, Computer application and coating specialist
Initially degree qualified as an Electrical/Electronic Engineer, I have been working in the field of DCS Control systems for the past 25 years. I have worked as a Field Service Engineer, Application Engineer, Systems Engineer, Commissioning Engineer. Primarily with Foxboro systems.
Worked for Mckenzie Forest Products for 25 years 12 years as a Supervisor
4.5 years in petro-chem document control: both engineering and construction (Pre-T/A, T/A & Post T/A) phases, being responsible for the governing of drawings, drawing lists, invoices, contracts, engineering standards, construction packages, distributions all management levels
Geologist with expierence with core logging, database management, quality control, and management.
QA/QC Mech.Engineer near about four years exp. in the field of Pipe Mfg.Company,Pipeline & Piping during project execution, construction, commissioning of m/cs, pipeline and piping & system implement, execution and maintaining related to all quality control and assurance dept.
Worked in oil and gas industries for over 6 years as Planning Engineer and Project Engineer. Advance in using Primavera Project Planner Ver. 3.1. Language skills including English, Chinese, Malay and Chinese dialects. Worked in China for the last 3 years. B. Eng. from Melbourne University.
Lead Naval Architect with 5 years FPSO conversion and new building experience
management
Supervise the execution of new 115/69/13.8kV projects (substations) from conception to completion.Design and development of all aspects of electrical system/facilities, substations and distribution
Demonstrated planner with diverse experience and knowledge in Airport project, Gas and Oil Projects and general MEP projects. Strong Engineering and Management background combined with certification in project management courses. Adept at learning new concepts quickly, works well under pressure
Extensive working experience in Chemical Processing, Power Generation and Oil & Gas Industries. Versatile team player with an ability to incorporate new concepts and interact with all levels of professionals. Expertise in Project, Maintenance, Materials Management and ERP (SAP, MAXIMO, Primavera R3)
Experienced HR / Recruitment Professional
Over 20 years of experience in a career, dedicated to the provision of engineering services in the development of Maintenance Engineering and completing major projects. I am, most adept at successful employment in a multi-discipline environment.
Environmental Consultant (Engineer/Scientist)/Geoscientist
I am a Survey Engineer, experienced in multi disciplinary projects, with a good track record of world class projects. I am highly interested in any position with international or overseas exposures and possibility to maximize skills in Surveying, Management, acquire new ones and progress.
Special Skills: Years of experience in cost-cutting, budgeting, planning and projecting, great communication skills, the ability to work well in and under pressure, team player.Other: Excel, Microsoft word, OSHA
SKILL :-Good understanding of project management, implementation, closure, and quality assurance concepts.Good understanding of data handling and archiving processes. Possess strong administrative & communication skills --Bachelor of Arts--Bachelor of Education--Computer Operator cum Programming Ast
Good communication skills, Able to work with no supervision. Self Motivated,team leader. Extensive organising,work prioritisation and related Skills. Proficient using Maximo and Federal Supply System. Knowledgable with Excel,Microsoft Access,Windows Xp
Negotiation, Leadership, Contracts, Policy, Environment, Project Management, Finance - Economic Consulting
PGDMS from London.A+ honours in hardware engineering. C, C++. Working knowledge of microcontroller programming and hardware languages.
33 Year old Dutch national with 10 years of HDD project management in Asia, Europe and FSU, now living in China.
Microsoft Certified Systems Engineer with over 12 years experience in system and security administration and management.
My objective is to secure a challenging position in the natural gas, oil or petroleum pipeline industries as an operations and maintenance supervisor or as an inspector. I have over 25 years of progressive experience in the natural gas transmission and distribution pipeline industry.
Civil engineer, project management, site management, cost estimation, Russian, English, Turkmen speaker, CIS experience, Siberia, Russia, Turkmenistan, Kazakhistan
Experienced NCCER-CSST Safety Technician,Paramedic OSHA 10,30,500, Army Corps of Engineers, Near- Miss Hazard Recognition and Root Cause Investigation Reporting, AHA/CPR Instructor,
IT professional with over 20 years of experience. He holds certifications from a international security standard - CISSP and is awaiting confirmation of his CBCP, MBCI and CCM (Business Continuity)
Results-driven Industrial Maintenance Planner/Scheduler offering 15+ years of extensive hands-on industrial maintenance experience, committed to efficiently manage and plan machine maintenance.
Experience in Industrial Marketing (Mining Products), International Trade, Product Management and Project management; Goal driven indivisual, Believes in creating value for the employer
A Production & Purchasing Manager with a wide range of experience in Engineering and Manufacturing industry. Able to work on own initiative and as part of a team. Proven leadership skills involving managing, developing and motivating teams to achieve their objectives.
29 Yrs + Contracting within Materials Management & Logistics, Onshore, Offshore & Overseas currently employed upon a consultancy basis by Rolls-Royce having just completed a contract with “NSSE” where I had been their Materials Manager (see CV)
Construction Safety Manager
Official Tendering Works regarding tender requirements, Preparing documents, Co-ordination with GSECL,Supervise the Sites of 66/132/220/400 KV Substation & Transmission Lines, O & M Works
27 years of mechanical and process engineering
Electrical / mechanical service tech
NACE INTERNATIONAL Recognised CIP III Qualified Coating Inspector
Pipeline / HDD Engineer with 7 years global experience
A computer literate with proficience in the use of various product management softwares to monitor and control stock movement. Ability to work without supervision and also to work under pressure. An innovative person who always explores better ways of doing things positively and team player
Camp, facilities, catering Management
knowledge of subcontracting, making the subcontracts in english and russian, verbal and written translation, document control.
I have over eight years experience within the recruitment market both in Australia and within South East Asia. I have acquired a wealth of experience servicing some of Australia’s largest mining, energy and construction organisations and have developed extensive skills in recruitment and HR.
With 20yrs of my experience, I have developed a sound background in infrastructure civil project and management, methods and procedures, which includes Commercial & Residential buildings, Roads, bridges, Tunneling, Dams, Environmental Remediation and Extensive Construction Quality Assurance/Quality
7 Years experience in Oil and Gas EPCI Contractor as Estimator, Good Interpersonnal skill and target oriented.
Project, Contract Management in Construction and IT. Mechanical design, construction monitoring, tender documentation and reporting, marketing and sales of services.
Construction supervisor (industrial civil works , Algerian HND) (48 GAS wellheads linked to 2 Production trains to 4 marine offloading systems
Master of engineering, Post graduate programme in business school, knowledge of Asian and CIS countries, pro-active attitude, results oriented.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
[ 27 ]
28
29
30
31
32
33
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com