Degree Discipline Year Of Passing & Grade Institute/ University
BSc. Engineering Mechanical 1980 (First Class With Distinction with over 75% marks) Delhi College of Engineering a Government India Institute of Very High Repute under Delhi University.

TRAINING: Trained In Developmental Programmes In Management Development Skills, Innovation & Development, Advance Cost
Engineering, Advance Planning & Scheduling, Procurement/ Const Management, Appraisals And Personal Skills, Process And Engineering Design Basis, Financial And Accounting Techniques.

EXPERIENCE
A total of 24 years of very extensive experience in Eil in project management /coordination i.e. 8 years / design and detail engineering i.e. 8 years and construction supervision, procurement, inspection & quality assurance i.e. 8 years in petroleum, oil & natural gas sectors viz. Offshore process platforms/ sub sea pipelines of ONGC, onshore cross country gas/product transfer pipelines of GAIL/HPCL/BPCL, chemical/product pipelines (imp/exp) & chemical port jetty/ chemical storage/ distribution terminal of GCPTCL, PTA project of IOCL, onshore natural gas gathering / transfer terminals of ONGC/IPCL/GAIL, various petrochemical plants of IPCL/MRPL/GAIL/IOCL/TNPL/BRPL, crude oil refineries of IOCL/HPCL/BPCL/ESSAR/CRL/MRL, alumina projects of NALCO etc. In India and overseas.

My areas of expertise are projects management, design & detail engineering and construction management. I specialised in coordination for preparation of LSTK/ EPC/ PMC/ Feed packages, tenders, MRS/ PRS, evaluation and recommendation of bids, procurement & inspection, preparation of project & budgetary cost estimates, feasibility studies/ reports, vendor development, quality assurance/ control, overseas coordination, supervision of construction & commissioning etc.

- Have dealt with numerous reputed national/ international clients/ vendors, contractors & licensors in petroleum industries.

- Have already handled projects of value worth over 500 million us$. Currently engaged in projects valued over 300 million USD.

- Present engagement engaged in mechanical supervision of PTA project
Since Sept' 04 of Indian oil corporation at Panipat, India. The plant is having a capacity of 5, 34000 mt per annum being built at the cost of USD 300 million. Total scope 300,000 inch DIA SS/CS piping, 350 equipments.

OVERSEAS EXPERIENCE
Have experience in Hyundai/ Khic yards - South Korea,
From 1985 to 1986 Mcdermott yard – Indonesia, Mcdermott Singapore, etpm yard - Sarjah on company's assignments for supervision of fabrication of offshore oil & gas process platforms and structures.

COMPUTER AWARENESS well versed in Microsoft word, excel, and PowerPoint etc. Developed in house computer programs for mechanical design of process columns trays and tower internals, pressure vessels/ exchangers and also worked on VAX main frames systems.

EXPERIENCE IN DETAIL
(1997 onwards as Manager (Projects) EIL-New Delhi.
(a) (2003 TO 2004)
Project Management For Execution / Commissioning of A Net Work Of Numerous CNG Dispensing Terminals For Road Transport Vehicles In Delhi For M/S Ideraprastha Gas Limited. The Works Involved Laying Of Supply Network Of Natural Gas Pipelines In & Around Delhi With Feeder Lines To Mother Stations For Dispensing Of Gas To Buses And Cars. Setting Up Of Stations Involves All Construction Activities Along With Procurement And Installation Of High Pressure CNG Compressors, Dispensers, and Generators & Cascades Etc.
Also engaged in techno /commercial proposals for gas/ petrochemical projects for domestic / foreign projects.
(b) (2000 to 2003)
- Project Management of M/S Gail's 42" NB 612 Km Cross Country Gas Transmission Pipeline from Petronet's Dahej LNG Terminal in Gujrat to Vijaipur Terminal in Madhya Pradesh (India) With a Capacity to Transfer 30 MMSCMD of Regassified LNG. Job Involved Project Coordination for All Contracts & Tendering activities. Project cost USD 700 million.
M/S GAIL'S Krishna Godavery basin pipelines project. In western Andhra Pradesh. The project cost was USD 100 millions. 12 pipelines were commissioned with a capacity to transfer additional 8 MMSCMD of natural gas.

(c) From 1999 to 2000
M/S National Aluminium Co. Ltd (Alumina Expansion Project in Orissa State)
Project coordination for Gallium, Special Grade alumina (SGA), Zeolite and common utilities (CU) plants of M/S Nalco in Orrisa state. The works relates to preparation of LSTK package for Gallium plant.

(d) Year 1996 to 1999
- Project management and coordination of setting up of M\S Gujarat Chemical Port Terminal Co Ltd CHEMICAL PORT JETTY AND TERMINAL PROJECT CONSTRUCTED AT DAHEJ IN WESTERN GUJARAT (INDIA).
- This Petrochemical cum port & storage terminal project caters to import/export of hydrocarbon/chemical (gas & liquids) cargo of (1.8 million TPA) and storage terminal of capacity of 100, 000 CU.M for propane/propylene gas. Built at the cost of USD 200 millions, the jetty handles upto 40,000 DWT tankers. All aspects of project execution and commissioning were extensively dealt with.
- Following components \ systems were important in above project.
- 2.1 Km approach bridge trestle made of reinforced concrete/ tubular steel piles with anti corrosion rebar and steel structures from shore to jetty incorporating a top of the trestle road access unto mooring area and control room. I incorporate transfer pipelines total 9 nos. and shore side complete terminal having liquid storage, cryogenic double wall tanks 50000M3/ 30000M3 for propane and propylene, loading gantries and BOG compressors, refrigeration and chilling units for propane, butadiene, submerged heaters, exchangers/ condensers, magnetic and mass flow meters and pump house, marine/ shore vhf communication and public address system.
- 2 pairs of berthing and mooring dolphins, service platform with control room & marine gangway, 7 nos. of marine loading/ unloading arms, navigational aids, fenders, crane, QRMH, complete pigging facilities in jetty.
- Effluent treatment plant, firewater and foam network, plant and instrument air, 66 kV switchyard having substation, transformers, MCC, emergency DG set and plant communication and automation systems.
- Administration building and guesthouse, green belt, transfer pipelines etc.

In EIL's Heat and Mass Transfer Division at New Delhi (Design & Detail engineering experience)
(e) Year 1988 to 1995 as senior engineer/ deputy manager in EIL.
- Responsibilities were complete design, engineering & preparation of business proposals for getting business to EIL & inspection of as installed LIQUID trays and Packed Tower Internals for process columns of numerous refineries, petrochemicals and oil & natural gas processing plants in India/ abroad.
- Design and engg. of high pressure process package systems in onshore & offshore oil and gas processing plants viz, Test and Production Separators for oil & gas, coalesces, contactors, oil sumps etc. Also developed computer programs for mechanical design of pressure vessels, columns trays and heat exchangers, developed quality control manuals and procedures.

LIST OF PROJECTS HANDLED in design & engineering
Major projects for which Design & Detail Engineering, preparation of Techno-Commercial proposals, Material requisitions, review of bids technically and commercially, review of vendor's drawings performed, fabrication of materials at vendors works, in Heat and Mass Transfer division of EIL along with checking of site installation of column/ tower internals such as valve, sieve, bubble cap, packed tower with structured/ random packing, chimney trays, distributors, demisters and process package systems such as two/ three phase oil/ gas separators, contactors, coalescers, sump tanks, pressure vessels and associated piping, instrumentation and support structures etc. are as follows.
A Panipat Refinery project of Indian Oil Corporation. (Crude, Vacuum Columns, Naphtha Stabiliser, Strippers, Hydro Crackers and Many More Columns in This As Well As Following Refineries)
a. CDU/VDU/PP Recovery Plants of HPCL - Vizag.
b. Special Cut Naphtha Project of BPCL Mumbai.
c. Gas Hydro Cracker Project of IOCL's Gujrat Refinery.
d. Barauni Refinery Expansion Project of IOCL (AU III, LPG RECOVERY PROJECT)
e. Mangalore Refinery Project of Mangalore Refinery & Petrochemicals Ltd f. Essar Refinery Project of Essar Oil Ltd g. Mathura Refinery of Indian Oil Ltd (Reformer Of Crude oil)
h. Food Grade Hexane Project of ONGC
i. Coker unit at Barauni refinery project of IOCL
j. Integrated Petrochemical Complex At Vadodhra of IPCL
k. Maharashtra Gas Cracker Complex of IPCL At Nogothane (GAS

CRACKER/PP/HDPE/LLDPE/NGL Plants)
l. Petrochemical Complex of BRPL at Bongaigaon.
m. Polyster Filament Yarn, Nylon 6 & Spandex Yarn Project of Petrofils Cooperative Ltd.
n. Gas Sweetening, Gas Dehyderation, Dewpoint Depression & Kerosene Recovery Units In Hazira Gas Processing Complex of ONGC (Gas Dehydration, Sweetening, Condensate Fractionation, NGL Units)
o. Group Gathering Stations, Crude Stabilisation Unit And Power Plant At Gandhar of ONGC
p. In Situ Combustion Facilities At Balol And Sathal of ONGC
q. NGL Fractionation At Hazira of ONGC
r. LPG Recovery and Crude Stabilisation Units of ONGC at Uran.
s. C2/C3 Recovery Units At URAN, Auraiya And Gandhar Projects t. Offshore Process Platform named White Tiger Project of Gas Compression Platform in White Tiger Field Offshore Vietnam for Samsung.
u. Design of Top Side Facilities on Several Well Platform, Process Platforms, Water Injection Platforms in Various offshore Fields Such As Mumbai High, South Bassein, Heera, Neelam and Panna Offshore West Coat of India.

(f) Year 1987- Construction and inspection at BPCL refinery in Bombay.
Involved in construction supervision of main crude oil heater of BPCL refinery
(g) YEAR 1982 TO 1986 (CONSTRUCTION SUPERVISION EXPERIENCE)
AT EIL'S OCEAN ENGINEERING DIVISION- MUMBAI INDIA.
Construction and inspection supervision of numerous ONGC's offshore oil & natural gas process plat forms and submarine pipelines in Mumbai High, India.
I supervised from quality assurance / quality control, inspection (welding procedure, stress relieving non destructive / destructive testing, hydro test, material/equipment inspection documentation and third party approval, safety audit etc.) and mechanical point of view Several Submarine Pipelines, Offshore Well Cum Process Platforms Structures, Main Decks, Topside Process Facilities, Flare Stacks, Bridges, Living Quarters, Boat Landings
(h) Year 1980 to 1981 (construction)
Construction supervision at Mathura refinery project of IOCL at Mathura, in Uttar Pradesh India.
Construction supervision of offsites and process unit's piping and tankages.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 401 to 450 of 1649)Go to Search Parameters...
Brief Description
OBJECTIVE To obtain a position with a progressive construction / development firm in which I will utilize my construction management and business skills
Prepared weekly and monthly schedules and cost reports preparation and submission to Client and in house management• Monitored of the cost & Progress on weekly basis. Invoiced to Client on monthly basis for the project.
A qualified Chartered Accountant and Company Secretary with 25 years experience in accounts, finance, banking, treasury, costing and budgeting, procurement, insurance, materials management, import clearing logistics, contract management / negotiation and general administration. Indus
Information Technology Vicepresident / Manager / Director / Project Manager
Civil engineering experience. Highly qualified in troubleshooting and problem solving skills in the field of construction and management
Quality Manager with 20+ years diverse experience
Business oriented leader with a strong commitment to results and service. Significant experience in operations, logistics and supply chain management of complex, evolving organizations.
Construction Engineer
10 years in executive management and marketing and sales in numerous engineering and construction environments.
Extensive experience in finance and accounting, project cost and business office administration in start up companies in the petroleum, construction and heavy lift industries.
HSE Manger
I am presently working as Manager (Mechanical) with Engineers India Limited an ISO 9001 CONSULTANCY ENTERPRISE of Govenment of India & supervising on behalf of owner all piping and equipments installations in PTA - project of Indian Oil Corporation at Panipat Haryana India.
Accounting in IAS & GAAP, Controlling, Budgeting, Financial Reporting, Compliance
I believe that my vast experiences in the various facets of construction organization entitle me as the suitable candidate for this position. My academic qualification, exposures and experience have given me an in depth working knowledge in overall functions of the Construction Project Management.
Project Manager
I am looking for a project controls/EVMS position internationally.
Project Planning and Control
Project Controller with extensive experience of implementation and operation of project management systems. Detailed knowledge of C/SCSC & EVM systems. Experience in Petro-Chem, Oil & Gas downstream distribution, Rail, Defence and Civil Engineering sectors. Extensive procurement experience.
Ready Mix Concrete - Operations - Production - Plant Construction Manager
A senior manager with over 25 years experience in engineering management including sales and project engineering in the Middle East, North Africa & UK within the oil, gas, construction, power, petrochemical sectors with blue chip companies including Saudi Aramco, Shell UK and British Gas.
First Class Professional experienced as Project Engineer/Project /Contracts Manager for more than 30 years in around the globe. A self-starter, motivated individual with well-rounded Project Management training in Man,Material & Money Management
Responsible for business development of company & for recruitment of professionals like Project Managers, Engineers, &Technicians for Engineering, & Construction industry in India, Middle East, ,etc.To develop and manage our own portfolio of clients and source the most suitable candidates .
Degreed in occupational safety and health, 18 years experience in construction safety, sveral yrs. Overseas exp. Working with multi-national staff. Excellent medical background
20 years in the construction industry ranging in the welding field of building food processing plants,to oil field industries,Commercial diving opperations I also aplied my knowledge toward the osha programs as a Safety Specialist started work with the Navel Stations with contract for the Navy.
50k to 100k US per Year
OBJECTIVE Find a rewarding position, which both recognizes and rewards performance. A place where someone is able to establish their skills and be capable of learning at the same time.
Supply Chain & e-Business Management professional having 9+ years multinational experience.
I was responsible for the daily operations of the project’s office and assist both mechanical and electrical engineers in the billing and change order process, Purchasing, preparing reports and supervising.
MEP Manager with 14 years of int'l exp. in construction. Verify design, construct and commission. Executed prestigious & high rise buildings project which MEP works value in excess of US$380 M. Supervise and coordinate work acc. to contract ,budget, time, co. procedures & ensure client satisfaction.
VP metallurgist with MBA. Extensive experience with 20+ years experience in manufacturing and operations, working in the USA, Canada, and Australia.
A Certified Human Resources Professional with practical and progressive experiencein Africa, Central America, Canada, USA, Central Asia and the Asia-Pacific region.
Extensive management, administrative, financial and contractual experience.
To secure a position with a progressive firm utilizing my diversified material management capabilities.
In my years of experience, I have gained a specific and wide knowledge of essential aspects of both the purchasing and distribution of products used in industrial environments that are essential to the growth of our market.
35 years nursing experience in most disiplines
Experienced equipment manager with earthmoving, material handling equipment, and cranes.
Construction Project Manager
An energetic individual with an MBA and construction experience seeking for a challenging job with an institution in the Middle East that rewards creativity and hard work and helps me grow and contribute to the overall success of the firm.
This resume is a compilation of my past and present working experience. I feel that I am qualified for many positions and I believe that my resume is proof of that.
LNG, Project Manager
District Superintendent, Superintendent, Assistant Superintendent, Field Supervision 12 years experience. 25 years as Journeyman Carpenter, Journeyman Mechanical Millwright with several OSHA certifications.
Experienced Safety manager in Contruction and through Mining/Oil/Gas. Safety Professional through design and planning to construction/commissioning, turn-key.
Looking for a bright career in the field of Supply chain Management.
Reviewing the scope of work & technical specifications, checking detail projects schedule plan for construction and delivery of equipment, analyzing the projects progress and monitor the site progress and look after the safety and quality issues and more.
A 34 year old project manager with 14 years experience in mechanical, industrial and commercial projects. 15 years experience in all realms of contract engineering & QA/QC. Overseeing projects up to 36 million dollars. Project estimations.
Experience in Construction of Power House, Highway Roads, High-rise Buildings, Canals, Air Ports, Aero Bridge ,Delhi Metro Rail, Commercial and Residential Multi Story Buildings ,Water Tank, Guest House , Domes. Familiar with ISO 9001,ISO 14001 and Safety systems.
30 year old dynamic electrical power systems engineer available for immediate relocation.
Free! An international, multi-lingual, technically proficient Sales & Marketing professional
Senior management consultant with 15+ years of progressive experience and with a results-driven approach for project and program management, including the use of first-rate skills in directing full cycles for high profile, multisite, international programs and initiatives.
Chemical Process Engineer,Simulation Design, Process Control Automation,Project Development-Conceptual,Feasibility,FEED,Project Mgr,Coordination_EPC,PMC,Licensor,investors;techno economic financial analysis,Mid Downstream Refining, Petrochemicals,Gas Processing/Treatment,Q-HSE,Business Head (P&L)
1   2   3   4   5   6   7   8   [ 9 ]   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com