WORK HISTORY
October 2006- GENERAL SUPERINTENDENT
Present Cartmill Rogers Construction
Las Vegas, NV
Canyon Ridge Christian Church Expansion; 280,000 sq. ft. total build-out, including new construction of one multi-story, tilt-up panel Educational Center in conjunction with structural remodel of the large auditorium, adding 1,650 seats, maintaining full functionality and occupancy during entire duration of project. Site/off-site scope included 7.5 acres of new parking.
Project cost: $16 Million
January- GENERAL SUPERINTENDENT
September 2006 Affordable Concepts, Inc.
Las Vegas, NV
Spring Valley Medical Office Building II; 3-story conventional steel frame with exterior E.I.F.S. system; extensive hydronic systems. Site/off-site scope included large parking lot addition with improvements to various County roads. Very compressed schedule.
Project cost: $8 Million
March 2005- GENERAL SUPERINTENDENT
January 2006 J.H.L. Constructors
Denver, CO
Adams County 12 Five Star Schools - Elementary School 13
Thornton, CO
68,000 sq. ft. single-story conventional frame building; total site of 10 acres with parking and utilities, including installation of 72" RCP irrigation siphon crossing the project directly beneath the building. (Required considerable coordination with numerous County and Water District entities.)
Project cost: $9 Million
2004-2005 GENERAL SUPERINTENDENT
Hamon Contractors
5670 Franklin Street
Denver, CO 80216
Highway improvement project for the city of Westminster, CO. Scope of work included the construction of two large bridges, numerous retaining walls & several large box culverts. Also, curb & gutter, sidewalk, sanitary sewer, water line to complete 2.5 miles of new highway.
The Project's close proximity to the City of Westminster Waste Water Treatment Plant required considerable coordination due to the massive amounts of underground utilities involved. The scope of this Project also included a large amount of reclaimed water & sanitary sewer line. Several river crossings were installed along with a sanitary siphon feeding the treatment plant. Precise coordination was crucial to the critical path of the project.
Project cost: $12 Million
RODNEY LEE HIBBARD
Page 2
1996-May 2004 SURVEY MANAGER
M. A. Mortenson Construction Company
300 West Plaza Drive, #300
Denver, CO 80129
* Starting position as Company Foreman on several large commercial projects located in Keystone and Winter Park, CO; jobs were multi-story condominiums for KRED and HINES RESORTS. Responsibilities consisted of managing layout and quality control throughout construction of 3 large ski resorts; also, coordination of subs, crews, deliveries, etc., and close contact with owner reps, building department, utilities, etc. These projects were very fast paced, in extreme conditions.
Total project cost: $118 Million
* Beginning in 1998, I became Survey Manager for Mortenson's Western Region. This position entailed the oversight and management of all layout issues on all projects in the Rocky Mountain region (to date, approximately $800,000,000). Position entailed working closely with owners, architects, structural & civil engineers along with public and private entities from the bid process through close-out, as most projects were Design Build.
Duties included staffing; acquisition of all equipment applicable to layout activities and quality control, i.e., Total Stations, G.P.S. Systems, Computers & Software, and tracking of same.
* During my tenure with Mortenson, I instructed advanced layout classes;
* Worked with several colleges to implement Internship Programs to bring much needed talent into the field;
* Completed 30-hours OSHA Training; 10-hour Crane Class; Scaffold Training and Top Driver Classes.
* I have computer training on AUTO CAD, Eagle Point and Expedition.
1993-1996 SITE SUPERINTENDENT/FIELD ENGINEER
Heber E. Costello, Inc.
609 Costello Road
Oak Grove, LA 71263
* Construction of several very large industrial sites (400 acres +) for Boise Cascade & Willamette production sites; Initial site usage planning/Mass-ex/Soil stabilization/Blue-top/Building control/Work points. Coordination & layout of several railroad spurs & County-maintained roads. Total station/Data collection/Data transfer/Cross-sections/Computer plotting.
1991-1993 GENERAL FOREMAN/FIELD ENGINEER
Lee Lewis, General Contractor
P. O. Box 65197
Lubbock, TX 79464
(806) 797-8400
* Lay-out/Site work, 190,000 sq. ft. high school & adjacent structures (Abilene, TX); Two large schools, coordinated crews & subs, payroll, material & equipment accounts, personnel hiring (Houston, TX).
1989-1991 SUPERINTENDENT
Kerry M. Glover Construction
P. O. Box 1314
Wildomar, CA 92395
* Construction of several commercial sites including (2) automobile dealerships, schools, shopping center additions (several mansard roof store fronts) & tenant improvement projects using the newer earthquake-proof hybrid architecture incorporating a mixture of laminated beams & structural steel with panelized
RODNEY LEE HIBBARD
Page 3
roofing system & numerous structural shear walls with appropriate hardware & hold-downs; Coordinated crews & subs; Payroll; Material & Equipment Accounts; Personnel hiring, etc.
1987-1989 SUPERINTENDENT
Fisher's Grading & Excavating
2498 West Baseline
San Bernardino, CA 92411
* Construction of concrete structures as part of "100-Year Flood Plan" for Southern California. Types of structures included miscellaneous pump stations, check structures, discharge structures, chain walls, box culverts, etc. Also included throughout my employment with this company was the installation of a large number of pre-cast pipe; supervision of forming & pouring catch basins, tie-ins with curb & gutter sidewalks, etc.; coordination of crews, lumber take-offs, estimations & orders of concrete poured, storage & distribution of company tools & company vehicles.
1982-1987 CO-OWNER/ESTIMATOR
Hibbard & Son, General Contractors
1107 Warren Drive
West Monroe, LA 71291
* Commercial/residential work.
(Business dissolved due to depressed economy)
1979-1982 SUPERINTENDENT
Paul N. Howard Company
Home Office: Greensboro, NC
College Park, MD: Project consisted of six (6) large complicated structures (isolative chambers, Ventura tubes, check structures, etc.) Approx. 3600 yards of concrete poured.
* Daytona Beach, FL: Construction of wastewater treatment plant.
* Port Lavaca, TX: Project consisted of sixteen (16) miles of 36" CRP with various underground structures totaling approx. 4200 yards of concrete poured; structures included pump station w/3 pumps installed.
Training: O.S.H.A. 10 and 30 hour
HAZMAT/HAZWOPER
Mobile Crane
Scaffold Training (all)
Top Driver
Forklift Training
Bobcat Training
Management/Communications
Workplace Ethics
Drugs in the Workplace
First Aid/CPR
Certified Traffic Control
Computer/Technical: Microsoft Word
Microsoft Excel
Primavera
AUTO CAD
RODNEY LEE HIBBARD
Page 4 Eagle Point (Survey Software)
TDS (Survey Software)
Survey Pro (Survey Software)
Solo Field (Survey Software)
Trimble (G.P.S.)
JAVAD (G.P.S.)
 Expert ability at all methods of Layout/Survey_
Theodolights, Total Stations, Robotics, GPS,
GIS, Various laser systems, etc.
Heavy Equipment: Dozier, Grader, Backhoe, Bobcat, Forklift,
Crane, Front-end loader
 PROJECT LIST
BEGINNING 1996 (M. A. Mortenson Construction):
_Harvey's Casino, Central City, CO $128 Million
_Buffalo Dakota Lodge, Keystone, CO $128 Million
_Expedition Station, Keystone, CO $17 Million
_Zephyr Mountain Lodge, Winter Park, CO $170 Million
1998 - Became Survey Manager for M. A. Mortenson's Denver Region. Provided coordination & oversight for all Field Engineering & Survey Operations on all Projects, recruiting, equipment procurement, and internships, training, etc. As many as 18 Projects under way at any one time. Some of which included:
_¬Sun Micro Systems, Broomfield, CO $120 Million; 30 acre site overall, consisting of 3 large multi-story, Concrete Core, Steel Frame structures on caissons & spread footings.
_Seagate Industries, Lafayette, CO $128 Million; Large Production facility, Mainly Steel Frame Construction with Structural Shear walls & Concrete Cores.
Considerable amounts of underground utilities and paved parking.
_Exempla Medical Center, Lewisville, CO $210 Million; Very Large Hospital.
Conventional Steel Frame, Concrete on Metal Deck, Numerous Stair & Elevator Cores, Large Parking.
_Eagle County Maintenance Facility, Eagle, CO $76 Million; Large Site, Multiple Structures including Administration Bldg, Bus Barn, Mechanical, Storage, etc.
_Janus Cooperate Offices and Hotel, Cherry Creek, CO $178 Million;3 multi-story structures. Hotels, Condo's, Offices. Steel Frame, Some Post Tension Slabs.
_Pepsi Center, Denver, CO $280 Million
Very large events center housing the Denver Nuggets & Colorado Avalanche.
Over 200 Caissons poured, very broad range of construction used to build this structure.
_American Family Insurance, Colorado Region, Parker, CO $52 Million;
11-Story Steel Frame, Concrete on Metal Deck. Typical Concrete Elevator & Stair Cores. Masonry Skin/Glazing.
Park Center Office Suites, Westminster, CO $36 Million
Stapleton Redevelopment, Denver, CO (Ongoing - projected totals,4 Billion)
View contact information... |