Bachelor of Engineering (Mechanical Engineering) 1998– 2002
Bharatiar University, Coimbatore, India
EXPERIENCE PROFILE
Planning Engineer
Petroserv Limited, Sep 2005 – Present
Doha, Qatar
Planning Engineer
Overseas Construction Company Feb 2003 – Sep 2005
Mumbai, India
Maintenance Engineer (Trainee)
Grabal Alok Impex (Alok Textile Industries) May 2002 – Feb 2003
Mumbai, India
DUTIES AND RESPONSIBILITIES
> Preparation of Cost and Resource loaded Work Programme to suit the Contractual Requirement.
> Holding discussions with Project Management Team to analyze and evaluate the functionality of the Project Work Schedule.
> Preparation of Time Schedules and Progress Curve proposal for Tendering purposes.
> Liaising with client on approval of Work Schedule, Weightage Distribution, Invoicing Criteria, and Invoicing Plans etc.
> Perform Presentations and Discussions to communicate Work Plan and Responsibilities pertaining to each Site Personnel.
> Preparation of Progress Evaluation Criteria and Payment Schedule to best suit the Sub-Contractor's Scope of Work.
> Preparation of Procurement Schedule in line with the vendors Compliances.
> Evaluation of Document Numbering system, Engineering Register and weightages allocated for Individual document for progress reporting.
> Preparation of format for Document submittal registers to account the traceability of documents and progress evaluation criteria of submittals.
> Preparation of Report Formats, Weekly reports, Monthly reports etc. Liaising with Client in case of any discrepancies in progress percentages.
> Attending Weekly and Monthly Progress review meeting to ascertain the progress to be with in the acceptance limits and is consistent.
> Preparation of Weekly look-ahead schedule and Listing out the anticipatory manpower and equipment requirement schedule.
> Analyzing productivity against the Project Plan in all major categories involved in the work, which shall be used in identifying the delays and its causes.
> Alert the Project Management on Low productivity, Anticipated Delays, Slippage from the schedule or any other flaws.
> Preparation, compilation and presentation of Project Close-out Dossier.
LATEST EMPLOYER
Petroserv Limited, Doha, Qatar Sep 2005 – Present
Planning Engineer
> EPIC for Replacement of Mechanical Seals for Hydrocarbon Process Pumps in NGL Plants, Qatar Petroleum, Mesaieed.
> The work describes to carry out the Work that comprise, but not limited to FEED verification, Detail Design and Engineering, Procurement, Supply, Fabrication, Installation, Testing/Inspection, Construction/Demolition, Pre-commissioning, Commissioning and handover to QP of the fully integrated Facility with new Mechanical seals. This is a prestigious project involving 80 Major Hydrocarbon Process pumps. The work comprises of upgradation of the single seal to double seal for 76 Pumps and modification of its systems to suit the new seal requirements, and installation of 4 New Pumps Heavy Hydrocarbon Pumps.
Miscellaneous Instrumentation works at Arab–D Plant in the Dukhan Fields, Qatar Petroleum, Dhukhan.
> Provide position monitors on inlet guide vanes (IGVs) o f LP / HP expanders
> Re-engineer and modify the level measurement on HP Flare KOD and to provide new suitable level measurement instrumentation.
> Provide open and close indication for damper of stack of furnace F-9402 and to interlock open & close status with start up and shutdown of the furnace.
> F9450 furnace skin temperature measurement signals to be disconnected from DCS and to connect these signals to Honeywell FSC ESD system and then through serial communication these signals will be displayed on Honeywell DCS.
Modification of Sanitary system Onshore and Offshore, Qatar Gas, Ras Laffan.
> To carry out the Engineering, Procurement, Installation and Commissioning works required to upgrade the existing Sanitary Treatment System and Oil Retention Pond of QatarGas Onshore and Offshore Facilities. The project is specifically an effort to increase the Sanitary waste treatment capacity of the QatarGas Onshore LNG Plant 1 and 2, and in QatarGas Offshore Platform (North Field Bravo).
Major Overhaul of Crude Oil Tanks, Qatar Petroleum, Halul Island.
> Refurbishment of 3 Major crude oil tanks; involving repair and painting of shell, bottom plate, foam piping, floating roof, pontoon, wind girder etc. The hard workmanship involves tasks like; procurement, fabrication and transportation of materials to Halul Island, and carrying out the job in the extreme adverse climate of the sea.
N° 1 Auxiliary Boiler 200 ton/h, QAFCO 2, Mesaieed.
> Design, Fabrication and Erection of 200 ton/h Utility Auxiliary Boiler in QAFCO Plant. The scope of work specifies the fabrication and erection of boiler, platform, recirculation fans, FD fan, Wind Box, Blow down Tank, Steam Drum, Silencer, combustion air chamber, economiser, Stack, Insulation, Supported Piping etc.
> The project was 220 tons of boiler and accessories erection in a limited mobility area
New Bar Mill Project – QASCO, Mesaieed.
> Erection of New Bar Mill for Qatar Steel Company comprising of; Erection of Re-heating Furnace, Billet Transfer mill, Roll Shop, Bar handling Shop, Billet and Bundle Transfer cars, Cranes, Cooling Bed, Water Treatment Plant, Utility Piping, Compressed Air Station, associated Electrical and HVAC works.
> The Mechanical/ Structural/ Equipment works cumulatively comprised of 3000 Tons of Structural Erection.
> And a cumulative of 200 tons of piping works has been carried out in the Furnace, Roll Mill and Water Treatment Plant area.
PREVIOUS EMPLOYER
Overseas Construction Company, Mumbai, India Feb 2003 – Sep 2005
Planning Engineer
Qatar Petroleum Refinery Shutdown Project, Doha, Qatar.
> Shutdown included 1411 major equipments and more than 2000 miscellaneous equipments.
> The project was of high magnitude which included overhauling and upgradation of the total regeneration unit.
> In addition to normal shutdown activities there was 18 Piping PCRs accounted to 11 Kms of In-plant Piping works.
> The schedule comprised of 17500 activities for duration of 5 months.
RasGas Shutdown Project, Doha, Qatar.
> Maintenance was performed on 220 major equipments and more than 350 miscellaneous items.
> Shutdown of worlds one of the Largest LNG Plant was conducted with much effort, where in the whole Cryogenic unit was refurbished.
> Totally 2 trains comprising of 2 units each, Sulphur Recovery Unit and Liquefied Natural Gas Unit, were taken up for the shutdown.
> The close shutdown planning lead to the successful completion with less deviation from the day to day planning.
Qatar Petroleum Refinery Shutdown Project, Doha, Qatar.
> Shutdown of 269 equipments and 250 miscellaneous items.
> The Shutdown included the replacement of the convection section of the Condensate Heater.
> The shutdown took up all 5 Units of the condensate refinery for a span of two months which was successfully complete in advance.
Qatar Petroleum Shutdown Project (NGL – 2), Doha, Qatar.
> Shutdown of 52 major equipments and miscellaneous equipments not less than 100 numbers
> The Highlight of the Project was 80 % refurbishment of vessel V-2003 (Hydrocarbon Vessel).
> The NGL – 2 Plant shutdown was successfully completed well in advance.
Grabal Alok Impex (Alok Textile Industries), Mumbai, India May 2002 – Feb 2003
Maintenance Engineer (Trainee)
> Acquired intensive training in India's one of the leading Textile company.
> Passed through intensive training in periodic maintenance and preventive maintenance.
> Prepared daily report on the maintenance works carried out on a day to day basis.
PERSONAL PROFILE
Date of Birth: 22nd September 1979.
Place of Birth: Cochin (Kerala).
Nationality: Indian
Marital Status: Married
Religion: Christian
Possess a valid Qatari Driving License and Indian Driving License.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1101 to 1150 of 1655)
Go to Search Parameters...
Brief Description
I have extensive experience in a wide range of Instrumentation and control systems; covering a range of job functions in various industries i.e. process, chemical and petro-chemical, on-shore oil & gas, pharmaceutical. Involvement in all areas of instrumentation engineering: electrical interfaces an
EXPERIENCED PRODUCTION PLANNER
Talented HR professional with a generalist background. Experienced working in a professional services environment with complex hierarchies and matrix management. Ability to operate at both a strategic and operational level, within a geographically diverse team and in an international role.
Consultant in the following areas: Crude/ lpg Transportation-Storage-Shipping, Loss Control Surveyor, Petroleum Inspection: Crude Oil Loading / Discharging at Terminals, Refineries, Shore and Ship Tanks Sampling, Measurements & Lab. Analyses, Contracts Analyses and Advice, Shortage Investigation
Chemical Engineer with Environmental Engineering experience
Experienced Electronics Technician with Management and IT Background
Well experienced as an Electrical Field Maintenance and Construction QA/QC & Foreman in Oil and Gas Facilities, Refineries, Airport and Mining Industries with a demonstrated ability to lead Maintenance and Construction Projects.
Senior Mechanical Engineer, Bachelor Of Engineering
Exellent experience in cost, performance evaluation and contracts areas with over 4.5 years dedicated to working in those fields. would like to emphasize fact that I am a prudent person and devoted employee. I know my limits as well as abilities and always strive for better results.
Bachelor of Mechanical Engineer, TWI Certified CSWIP 3.2, AWS certified CWI, Level II in MT, PT, RT, UT and ISO 9000-2000 Certified Lead Auditor.
Operations Manager or Shift Supervisor in a Power Plant
Developing valve exercise and hydrant flushing programs for municipal water systems and supervising their implementation. Preparing annual budgets for construction and operating accounts as well as non-recurring major expenditures.
I have a Bachelor of Engineering Degree with Post Graduate Diploma in Construction Management, and with my wide ranging experience in the field of Engineering and Construction for a period of over 13 years,I am looking for a opportunity to excel myself in Planning and project Controls.
Proposals & Contracts, Commercials, Process & Technologies, Project Management
Project Management / Engineering Coordination / Process Engineering / Business Development
EE + Internatianal contracts egotiatins from proposal to contract concluding.
Over Four years of work experience as a Planning Engineer and one year as Maintenance Engineer. Superior Knowledge of Primavera 3.1, MS Project 2003/ 2007 and MS Office (particularly MS Excel) through proven experience in Project planning and intensive usage.
I am Commerce Graduate, Fellow member of ICSI (FCS) and Microsoft Certified Professional (MCP) with 13 years of work experience in Finance, Accounts, Company Affairs and Statutory Compliances.
Senior Instrumentation & Control and Telecom-SCADA Engineer
Project coordinator with strong background in budgeting and management
Innovative thinker with broad-based expertise in human resources, and business development.
Health and Safety executive with progressive experience in HSE management and auditing; with particular experience in the development of HSE management system, formulation of procedures, and compliance audit and monitoring
10 years experience in IT software development environment in various organizations
Electronics and Telecommunication professional with exactly 12 years of rich experience in the domain of Technical Support, Operations and Maintenance, Training and Development, Relationship Management with reputed organizations.
9+ years of experience in Civil/Structural and Mining fields in Canada, Mauritius and UK.
To secure a position in Environmental Health and Safety (EHS) Compliance with an established organization utilizing my 20 years of EHS skills, knowledge and experience.
Financial Manager (expat)
20+ years of experience with the environmental aspects of major energy projects - power plants, pipelines, transmission lines, refineries.
SKILLS SUMMARY Manager, with strong electrical and mechanical background, 15 yrs construction and maintenance electrical experience, 9 years mechanical experience, performed purchasing and business development skills,. Proficient in Microsoft Word, Excel,
I have over 27 years in mechanical repairs
Communications professional with over 20 years experience in public relations, including internal and external relations, websites and media relations. Excellent writing and strategic planning skills. Independent consultant in Vancouver and Calgary, Canada; before joining Qatar Petroleum. Former pri
I am a site acquisition specialist with a 3+ years of experience, i have skills in g.i.s. and the use of various softwares in g.i.s. as well as windows packages
Lean Master and Master Black belt instructor, facilitator and coach currently with BMG (Breakthrough Managemnt Group). Main function currently as Six Sigma and lean account executive responsable for the deploymemnt of Lean and Six Sigma initatives with various local and international orgenisations.
Dirt Superintendent / Foreman/ Heavy Equipment Operator with 25 years experience.
Senior Instrumentation Specialist / Designer
Materials Manager, Barge foreman, Assistant superintendent, General assistant
Supervision construction commissioning startup air separation ,heavy oil etc.
Site Manager on the Sak 1 project for Exxon I Supervised all Tier 1 and Tier 2 oil spill Response for .Ecoshelf, I supervised all hazardous waste disposal and recycling.
Strategizing and implementing plans to achieve Production targets in consultation with relevant stake holders in a safe manner. • Scheduling Mining, Ancillary Equipments and Labor to achieve Production and Safety Targets. Ensure proper and efficient utilization of all equipment
Twenty five years experience in Safety, Health and Environmental Inspections, Supervision and Management
BS EE, Program/Project Management, Business Development, MS Project, Oracle Financial Analyzer, Data-Voice Value Added Service projects & business, GSM 900 infrastructure (Ericsson) deep knowledge, Wireless and Service Engineering Planning, MS Office, IP Networking
International Business Development - Africa/Europe/Middle-East
I have experiance with the Project Control department by working on Primavera Project Planner 3.1, ec or 5 and Maximo and Claim Digger.
Safety officer with 15 years experience
Senior Safety Consultant seeks long/short term contract.
Looking for a mechanical engineering position.
for 25months at PetroRabigh Development Project PC1 & PC3 as a Snr.Planning Engineer with Gama Industry. Capable to detect every single activity's bottleneck that prevents to achieve the "MC, PC & RFISU".
Data manager with over 10 years of experience in the mineral exploration industry providing high quality digital tools, data and information to geoscientists. Extensive experience managing IT projects and services on an international environment. Strong analytical, organizational and technical skill
Bilingual (English and French) Engineer with +13 yrs Petroleum Production, Wellsite and Operations experience in Oil & Gas and +3 yrs in Construction and Environmental work. Worked for Shell, Vermilion and Maurel & Prom in Africa, Europe and North America. US resident.
Bilingual, Certified PMP and Six Sigma Greenbelt, self-motivated and client-focused Business Systems Analyst with seven years of global experience as well as experience in the Health/Environment, Public, Financial and IT Sectors.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
[ 23 ]
24
25
26
27
28
29
30
31
32
33
34
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com