Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #70589
next resume »»
CONTACT INFORMATION:
View contact information...
EDUCATION
(1991) * Bachelor of Engineering in COMPUTER SYSTEMS from NED University of Engineering & Technology Karachi, Pakistan.
PROFESSIONAL TRAINING
(1992-1993) * Post Graduate Training (one year) in Computer Hardware and Software from CTC, Islamabad, Pakistan.
TECHNICAL SKILSS
CONTROL SYSTEMS:
* Foxboro I/A series DCIS
* Mitsubishi Diasys-UP DCIS
* ABB Symphony and Industrial IT DCIS
* ABB Procontrol P14 and Freelance
TRAINING COURSES * Attended 5 days PMP Certification exam preparation seminar (19 ~ 23 Jan) conducted by PMI-AGC Chapter, Kuwait.
* One week workshop on " Operating Systems – Unix" conducted by ICCC, Islamabad. Aug 09~13, 1994
* ABB. Procontrol P14 DCS System training along with associated products (POS, EDS, PDDS & OPC) conducted by ABB AG, Kuwait (Nov 2006)
CAREER HISTORY
* ABB AG, Kuwait
Lead Control Systems Engineer / Project Manager
October 20, 2004 to date
* Mitsubishi Heavy Industries, Japan ( Ghazlan II Power Project, Saudi Arabia).
Commissioning / Warranty Engineer I&C (DCIS)
October 28, 2001 ~ October 19, 2004
* Nichimen Corporation / MHI Japan (AES Lalpir Power Project), Muzafargarh. Pakistan
Engineer I&C (DCIS) / Site Manager
MAY 05, 1997 ~ JUNE 30, 2001
* Lucky Cement Limited, Pezu, Pakistan
Assistant Manager (I&C).
MAY 02, 1996 ~ APRIL 24, 1997.
* Kundian Chemical Plant. Jauherabad, Pakistan Assistant Engineer (DCIS / Computer).
MAY 05, 1993 ~ MAY 01, 1996
WORKING EXPERIENCE
ABB AG, KUWAIT
* Provided HMI and DCS software implementation and programming together with I/O configuration, start-up, commissioning and technical support of DCS (P14 Procontrol) and PLC (Freelance) based hardware and software systems for the power plants in Kuwait.
* Preparation of Control system configuration diagram, preparation of DCS input / output list and assignment, P&ID, logic and loop diagrams, preparation of graphics, function block diagrams, loop functional testing.
* Evaluation of Technical RFMs, RFQs, BOQs & Tender documents, identified & analyzed Client's requirements including study of existing platforms & infrastructure and developed checklists.
* planned and conducted Site Acceptance Test and got sign-off sheets.
* Managing project execution, installation, commissioning and system validation and preparation of engineering man-hour estimates and schedules.
* Implementation of KKS tagging system for Power Plants.
* Selection of appropriate equipment and materials as per project's requirement and technical specifications.
* Responsible for project documentation (eg Project registry document and project plan).
* Monitoring projects with respect to Cost, Resource Deployment, Time over-runs, Quality Compliance and Manpower Planning to ensure timely execution of projects.
* Conducting project review meetings for evaluating project progress & taking adequate corrective actions if required.
* Negotiates changes to the scope of work with the client and attends technical and interface coordination meetings.
ACHIEVEMENTS AS PROJECT MANAGER
DOHA EAST POWER STATION, KUWAIT (7X150 MW Steam Turbines)
* Refurbishment of Chemical Treatment Room
Cost: US $ 3 million
* Replacement of 415V Turbine and Boiler Switchgear U3 interfaced with P14 procontrol DCS
Cost: US $ 1 million
* Replacement of Sump pit Control
Cost: US $ 0.4 million
* Replacement of 415V Turbine and Boiler Switchgear U4 interfaced with P14 procontrol DCS
Cost: US $ 1.2 million
* Replacement of Traveling Screens Controls
Cost: US $ 0.8 million
* Replacement of 415V Pumping & Chlorination Switchgear with P14 Procontrol DCS
Cost: US $ 1.6 million
* ECR Transducers & Annuciation Systems
Cost: US $ 0.8 million
* ECR Data Logging System
Cost: US $ 0.3 million
GHAZLAN II POWER PROJECT, SAUDI ARABIA (MHI,JAPAN)
(4X632 MW Steam Turbines)
* Involved in installation, configuration and pre-commissioning of ABB Symphony DCIS hardware, BRC100, NIS/NMP, MCP and other modules.
* Complete utilization of "Composer 4.1", an engineering tool for Industrial IT system for the development of logic and operator interface graphics.
* System / Application software installation for conductor VMS and configuration of Alarm management, user access securities, Alarm summary, Tag and Trend database, function key and ADP configurations.
* DECNET and TCPIP configuration for conductor VMS and VMS client.
* Setup, configuration of Conductor NT used for data logging and archiving.
* Commissioning of serial link interface using (Kwick editor and C compiler) to configure and maintain the interface between BRC100 / NTMP01 and 3rd party PLCs using modbus converters (RS 485 or RS 422 to RS 232)
* Testing and commissioning of Asset management System (AMS) by Emerson, providing the online device configuration, diagnostic and calibration of smart transmitters supporting HART protocol.
* Programming and maintenance of the Multi switch 924TXG and Multi switch 900 by Digital.
* Developed and executed the SAT (Site Acceptance Test) procedures to test the equipments.
* Setup and configuration plant performance monitoring system "OPTIMAX" by ABB.
AES LALPIR POWER PLANT (NICHIMEN CORPORATION / MHI JAPAN) (2 X 230 MW Steam Turbines)
Engineer I&C (DCIS) May 05, 1997~Oct 10, 1999
* System Configuration and Commissioning of DIASYS - UP (MITSUBISHI) DCIS using Engineering utilities, including I/O master modifications, OPS modification, 8 loop diagram, System backup (on line + off line).
* System management of UNIX operating system.
* Loop testing ( Analog & Digital signals), Sequence testing at Group & subgroup level of the Plant,
* Development of plant's control logic using (FUNCTION CODE PROGRAMMING) "DIASYS-IDOL"
* Commissioning of Air Compressors (ATLAS CAPCO), Chlorination plant, CEMS Analyzers, canal intake bar/traveling screens, ROTREK motorized actuators.
* Turbine valves adjustment during unit shutdown.
Site Manager Oct 10, 1999 ~ 30 June 2001
* Leading the team of 15 Engineers + 25 Technicians
* Responsible for completion of all punch list items.
* supervise and control all Sub- contractor's activities during annual outage of the units.
* Preparation of progress report on daily/weekly/ monthly and updating the project office in Japan.
* Preparation of monthly cash flow requirement.
* Assisting the customer for spare parts requirement.
* Follow up of all warranty related issues and financial claims.
KUNDIAN CHEMICAL PLANT / LUCKY CEMENT LIMITED
* Installation, System Configuration and commissioning of FOXBORO I/A Series DCIS and other related equipment.
* Hardware/Software maintenance with particular emphasis on Node Bus, Application Processor, Workstation processor. Field Bus Modules etc.
* System Management of Venix 2.1 Operating System
* Development of programs for Historian using informix, Ace report writer and SQL.
PERSONAL DETAILS
* Date Of Birth: April 4th, 1968
* Nationality: Pakistani
* Marital Status: Married
* Dependents: Wife + 03 Kids
* Driving License: Valid Kuwait Driving Licence
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 601 to 650 of 1681)
Go to Search Parameters...
Brief Description
Ph.D. in Metallurgy, Specialist in Surface Treatments, Project Management, International Experience etc.
Where my experience, Education,training and good work habits will be an asset to your company.
Twenty plus years managing large scale telecom and construction projects
Construction managemnt, contract managment, quantity surveying, planning, schduling, cost analysis and control, finance managment, resource managment, computer maintinance,
Instrument Engineer with more than 27 years of experience in execution of erection, testing & commissioning/ proposals in the field of Instrumentation Projects for Oil & Gas, Refinery, Petrochemical, Fertilizers and other Chemical & Process Industries.
PMP certified, PM and General management skills
Post graduate Engineer with experience in marketing, engineering, insurance survey.
I am an Oil & Gas Facilities Project Engineer (B.Sc. in Mechanical Engineering, 1980) My duties are to develop, supervise, and execute design, procurement and construction of engineered hydrocarbon projects.
Cost Controller with strong accounting background. Over 2 years experience as cost controller and 14 years as accountant with multinational companies. Technical skills include preparation of project cost control plans, budgets and forecasts, cost tracking, cost and revenue analysis etc.
MBA, Engg. having 10+ years experience in Supply Chain Management, Purchase, Import, Export, International Logistics
15 years as QA QC inspector from first piece lay out to final inspection of all machanical parts. Have been QA/QC manager as well as Operational Support Manager
Installation, Operation and Maintenance Engineer (Mechanical)
12 + Years HSE experience, 27 + years overall experience on International Oil & Gas projects, dedicated professional with a hands on approach to maintaining the highest possible levels of safety. Effective organizational and good training skills; Experienced in onshore & offshore Middle East; Asia
Environmental Management & Permitting/Mining - Oil & Gas - Power - Infrastructure - Construction/Domestic (USA) & International
A Construction Manager with a wide range of experience in the housing construction industry. Proven leadership skills with the ability to work on own initiative and as part of a team. First class problem solving skills and dedicated to maintain high quality standards.
46 years international experience in EPC project management in oil, gas, power, petrochemical plants, refinery, iron and steel plants, mining, mineral processing plant and infrastructure design and construction. Activities include FEED to project delivery for greenfield and brownfield projects.
21 Years Experience in EPC/LSTK Project estimation, proposal, marketing, planning, project procurement and project management for Refinery, Petrochemicals and Fertilizer Plants like Ammonia, naphtha Cracker, PTA, Hydrocracker, DHDT, Sulphur and other units. Presently working with L&T, india.
Planner / Scheduler: 2 Years Experience, Site Engineering: 1 Year Experience Developing Schedules, Resource Allocations, Planning Spreadsheets, Deployment Schedules, Charts, Progress Reports. Review of Contractor’s Programmes, Specifications, Contracts. Tracking Correspondences, Archives.
project management.contract management,business management.
I hold a JD as well as an MBA in finance and have been a land manager for mining companies for the last 10 years. I am very well trained at acquisition, due diligence, negotiation, sales, entitlement, permitting and construction techiques. I have excellent references.
A Mechanical Engineer with Masters Degree in Quality Assurance Technology (M.tech).IRCA certified QMS Lead Auditor; ISO 9001:2000, ASNT Level II in RI,MT & PT NDT techniques. Around 20 years professional experience in Manufacturing, Planning and QA/QC disciplines.
Planning, Scheduling, Primavera, Artemis, Cost, Project Controls, Metrics, Construction Manager, Site Manager
Construction & maintenace of installations, equipment and systems in hazardous areas (explosive gas atmosph.); Maintenance of el. equipment, installations in petrochemical industry.& el. Equip., systems in El.Power Plant ; Training el.personnel for preventive & predictive el. maintenace programs
Senior Project Management, Profit and Loss, Project Planning, development and execution. Consultancy in the areas of safety, risk management, and techncal writing and editing. Major contract administration for a multi-national firm in Saudi Arabia on two different assignments.
Well versed in P3e, P3 and MS Projects with very good knowledge of spread sheets and MS Access database. Have experience of Petrochemical, Oil & Gas and Chemical Projects. Have also seccessfully executed few projects as Project Manager.
To acquire a technical/management position where engineering experience and managerial skills will significantly contribute to use the skills obtained through my experience and qualifications to benefit my employer and grow my self with organization.
Project Management, Cost Control, Estimating
Highly qualified Project Management Professional offering more than 20 years of project and construction management experience in managing and administering complex engineering and construction projects. Results focused and effectual leader with proven ability to set up project management systems
Employed as Sales Applications Engineer, I have supplied industrial, marine, mobile construction, process plant and aerospace markets pumps, valves, hydraulic & pneumatic components and systems since 1986.
Over twenty years experience covering all aspects of Document Control and Information Management responsible for the supervision of junior staff and the management of Document Control. I have worked in a variety of locations in the UK and overseas (Libya and Qatar)
Lead Control Systems Engineer / Project Manager having more than 16 years of experience with multinationals
Civil Engineer, board topnotcher and full Academic/University scholar. Expert and hands-on experience in Primavera P3.
Experienced EPC Project Executive with proven results through leadership and technical aptitude.
Planning, Scheduling and Cost Control Engineer
Detailed structural design and engineering, feasibility studies, project / contracts management, plant and building trouble stooting, QA / QC, contracts, project estimation, preparation and review of specifications,
Proficiency in using Primavera (P3), Primavera Enterprise, Expedition, Suretrak, Microsoft Project, Access, Excel And Other Related Software.
Over thirteen years track record for success in all phases of Landscaping Design, Project Management, and Nursery Operations
Industrial Construction Project Management
Management, Computer, Welding, Safety and Contruction Experience
Control & Instrument Commissioning / Maintenance Engineer 01.10.2006
20+ yrs progressive exp. as a Sr. Supervisory Planning/Scheduling & Project Control Engr/Mngr with Risk/Contracts Exp, Int'l w/Utilities, EPC Firms/Consultants, Turnkey OEMs and Constructors within the Energy Sector. P3 Ver.3.1, Primavera Ent. P3e/cVer.5, Pertmaster, Claim Digger, MS Office, Acrobat
18 years of experience in the field of Inspection, QA/QC, Quality Audits, Design, Procurement, Construction, Project Management in a wide range of activities for Chemical Processing Plants to Oil and Gas Plants Piping, Static and Rotating Equipments, Storage Tanks, Pressure Vessels, Structures and
A higly qualified technocrat having more than 33 years of experiance inoperations, projects, and marketing.
Shipyard Coatings Program Manager
I am a Mechanical Engineer graduated from the University of Bangalore who passed out during September 2000. I got more than six years of professional post qualification experience in the Mechanical Engineering field. As a young budding Engineer, I am very much eager to join your Esteemed Organizatio
Chemical Engineer and experienced Engineering Facility Manager with strong project management skills and over 15 years experience in a highly regulated industry
Sales Planning & Execution, Sales Budgeting & forecasting, Senior level Negotiation, New Product introduction, Team building & Organizational leadership
Projectmanager process watertreatment wastewater water biofuels bio fuels plantengineering plant engineering engineer claimmanagement commissioning basicengineering, detailengineering sitemanager tendering scheduling calculation
Experience includes government procurement, commercial and R&Dcontracts, environmental, international (primarily renewable energy projects in the Middle East), limited intellectual property activities, and varied management and staff functions. Will relocate worldwide on a single status basis.
Over 22 years experience with sour oil & gas processing, acid gas injection, and heavy oil production facilities, on and off-shore. Over twelve years managing various technical support, trades and operations staff. Over nine years of overseas/foreign experience.
1
2
3
4
5
6
7
8
9
10
11
12
[ 13 ]
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com