MMG (July 2005 – Present)

VICE PRESIDENT CONSTRUCTION

Responsible for complete construction execution from front end input on contracting strategies, execution methods, and logistics, through to pre-commissioning including the definition of interfaces and interface management of construction and engineering deliverables. Broad based experience of safety, engineering, quality control, cost, scheduling, contracting and contracts management gained over 20years on a wide variety of successful projects.
Currently handling projects with a total value in excess of 3.2 Billion SAR.

FLUOR ARABIA LIMITED (Oct 2001 – Jun 2005)

PRE-COMMISSIONING MANAGER / CONSTRUCTION MANAGER

World-scale Petrochemical Complex:
* Ethylene (1,000 kTa) / Ethylene Glycol (575 kTa)
* Linear Alpha Olefins (150 kTa)
* Utilities and Offsites Jubail United Petrochemical Co.
Al-Jubail, Saudi Arabia

Construction manager responsible for overall management of construction activities for the Utilities and Offsites (U&O) portion of the project. Vertical contracting strategy incorporated three major multi-discipline subcontractors, as well as several smaller specialty subcontractors. Managed site establishment and preparation including initiation of site safety program. Also responsible for all permitting and coordination with local authorities. Initially responsible for the oversight of all construction activities within the Utility block and assumed complete control of all construction activities upon the departure of original construction manager.

Pre-commissioning manager responsible for the identification and execution of all pre-commissioning activities, including hydrostatic testing, loop checking, cleaning and drying. Coordinated a multi-discipline organization to ensure timely completion of pre-commissioning to support an aggressive schedule that overlapped construction and commissioning.

FLUOR INTERCONTINENTAL, INC. (HOUSTON) (Jan 2001 to Oct 2001)

SENIOR CONSTRUCTION MANAGER

Prior to mobilizing to the United project in Al-Jubail, completed construction preparatory efforts in Houston. Primary responsibilities included input into the general construction execution philosophy, preparation of initial construction schedules, and contributing to the development of overall contracting plans. Completed analysis of the technical and execution sections of contractor proposals and conducted constructability reviews of major construction activities.

FLUOR ARABIA LIMITED (May 1998 to Aug 2000)
CONSTRUCTION GENERAL SUPERINTENDENT

World-scale Petrochemical Complex:
* Ethylene (760 kTa) / Ethylene Glycol (420 kTa)
* Polyethylene (515 kTa) / Polypropylene (250 kTa)
* Utilities and Offsites Saudi Yanbu Petrochemical Co.
Yanbu, Saudi Arabia

General Superintendent for the U&O portion of the project, consisting of two new 150 kTa boilers, three new ground flares (2 Polymers and 1 Ethylene), revamp of four existing boilers, a new caustic area, eleven new storage tanks, three new compressors and all the associated support systems.

FLUOR DANIEL SOUTHERN AFRICA (Mar 1991 - Feb 1998)

PROJECT MANAGER
COAL LOCK EXPANSION GAS Project Sasolburg (Oct 1996 - Feb 1998)
Project Manager responsible for overall project. Work was a Lump Sum services contract with a value of 30 million Rands.
PRINCIPAL STRESS ENGINEER
Lead Stress Engineer responsible for supervision of a multi-person stress group. Teams ranged in size from three to eight depending on project size and schedule requirements. Analysis included high-temperature, high-pressure systems, complex geometric piping layouts, and revamp work.
Air Products Vanderbijl Park (Aug 1996 - Oct 1996)
Caltex Plant 63 FCCU Revamp Cape Town (Jan 1995 - Aug 1996)
Sasol Polifin Project Sasolburg (Jan 1995 – Aug 1996)

Principal stress engineer responsible for general stress work associated with a visbreaking unit and sulphur unit. Specific requirements included two phase flow and slug flow problems.
Genref Visbreaker Project Durban (Jul 1993 - Dec 1994)
Genref S R C Project Durban (Apr 1993 - Jul 1993)
LEAD STRESS ENGINEER
Sasol I Renovation Project Sasol I Sasolburg (Mar 1991 - Mar 1993)
Lead stress engineer responsible for all stress analysis, supervision of stress group, manhour estimates and schedules. Stress analysis included tie-ins to existing piping systems and equipment such as centrifugal compressors, exchangers, pumps, fired heaters, tanks and vessels.

DAVY ENGINEERING LTD (Feb 1990 - Mar 1991)

FIELD / STRESS ENGINEER
Mossgas Onshore Project Mossel Bay (Feb 1990 – Mar 1991)
Field / stress engineer responsible for general stress work related to large diameter tanks, blending area, high-pressure area and utilities and offsites. Trouble shooting and on-the-spot decisions associated with stress problems were required to discharge duties.

FLUOR ENGINEERS S.A. (PTY) LIMITED (Dec 1988 - Feb 1990)

STRESS ENGINEER
Mossgas Onshore Project Mossel Bay (Dec 1988 – Feb 1990)
Stress engineer responsible for the thermal, dead-weight, pressure and wind analysis of piping systems on various units, including:
NGL Recovery HF Alkylation (Isomerisation)
Tail gas processing Naphtha Hydrotreater
NGL Fractionation Hydrogen Platformer
Butamer Distillate Hydrotreater
Penex

STEFFEN ROBERTSON AND KIRSTEN CIVIL INC. (Nov 1985 - Dec 1988)

CIVIL ENGINEER
Civil engineer involved in the design of channels, earth dams, roads and evaporation ponds. Varied computer programs used to simulate storm water generation. Resident Engineer responsible for the design and construction of the Drakensberg Sun dam and spillway.

COMPUTER EXPERTISE

Experienced with multiple computer software applications related to the piping stress analysis including Caesar II Pipe Stress Analysis Program. Also familiar with generic office based PC software including Windows Office products, Microsoft Access, Lotus 123, Lotus Notes, Freelance Graphics, etc.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 1649)Go to Search Parameters...
Brief Description
I have experience as a Planning Engineer over a period of 14 years in all civil and electromechanical projects with international contractors. I have a degree in Civil Engineering and a postgraduate diploma in Construction Management. I am currently looking for new challenges.
For the past 5 years I have worked as a contract administrator - contract compliance manager in the middle east. The contracts that I have administered range from $100,000.00 to $42,000,000.00. I have also worked as a logisitic manager tracking the delivery of equipment and machinary.
all Superintendent skills
project manager,bridge engineer,cost/quantity engineer,resident engineer
Construction Supervisor Finishing Works, "Pharma" Food Industry and High-Tech
An experienced and talented Project Management professional with extensive knowledge in luxury family home, multi-family homes, home sales and customer service.
B.Tech Mechanical Working as deputy Project Director looking after Contract Management
Mechanical, Electrical and Civil
MBA and graduate Electrical Engineer with over 19 years experience in Project Management of Oil & Gas / Steel / Mega power projects
Construction project manager, experienced with combined cycle power station construction and upgrades. Interested in assignment in China / Pacific Rim / Southeast Asia.
Electrical Project Management. Extensive Offshore Marine Maintenance Experience. Mechanical and Electrical Education and Experience in the Oilfield. Speak English 1st and Spanish as a 2nd.
I am a hands on bilingual Field administrator. I will get your people to the exploration site and keep secure and train them to be safe. They will learn how to blend in and just do the job they have been hired to perform, and return them back to the U.S. with a minimum amount of fuss.
I have 20 years experience in the building and management business from owning and starting my own company, and project management experience with multi-million dollar home building projects.
Fifteen years of experience in construction management, worked in both public & private sectors. Eight years of which I worked for Turner Company that is a pioneer company in construction management, whereas the balance were in Projacs that is an exceptional company in construction management.
Current position: Senior QA/QC Engineer and Senior Project Engineer ( Civil Infrastructures ), Through knowledge of Qatar Petroleum (QP) standards , policies and procedures.Over 19 years of experience with reputable consulting and contracting firms in Qatar, Dubai, and Jordan
An entrepreneurial professional with eight years management experience in construction, brings to the position an excellent mix of skills in finance, purchasing, and project coordination.
Transformer Design Manager CAD Automation
Plumbing, Construction & Maintenance
Chartered Builder (MCIOB) Graduate Diploma in Building Management Clients Project Manager / Property Development Manager
Manager of proposals and technical support to marketing experience 5 years. Experience in Latin America and Middle East. Previous Project manager experience 15 years: wastewater treatment plants, power plants, solid waste facilities. Excellent technical writing, computer literacy.
Management experience in Russia
14 years of Project Management Skill
Versed in accounts.
A keen HSE professional with NEBOSH (U.K) International General Certificate & IOSH-Managing Safely course with Mechanical Engineering background. The experience profile ranges from: Ensuring internationally accepted Best HSE practices across Process Plants, Construction Industry, Oil & Gas EPC Proje
Construction Management of Roadways, Bridges and Buildings. Roadway Design.
Two Degrees from USA Currently Working as Project Manager in Saudi Arabia
CONSTRUCTION MANAGEMENT Managed major construction projects for established General Contractor. Projects include site development, water and sewer utility work, road, paving, concrete, and wastewater plants for Municipalities, Penndot, Commercial, Industrial, and Institutional owners.
I am proficient in the preparation of contractual documents, RFP's, RFI's, bid analysis, bid negotiations, subcontractor selection, buyouts, conceptual budgets, construction estimates, value engineering, constructability and code compliance reviews.
I am a Canadian citizen having 17 years solid building construction, Civil and structural design, quality Management, project management, construction Management. a dedicated team player/leader exhibiting a high level of energy and initiative under pressure.
Extensive background in Program/Project Management.
Experienced Leader and Project Manager
Over twenty years in the engineering and construction industry, having been assigned supervision and management positions on various worldwide projects. In addition to strong technical skills across multiple disciplines, I strive to develop cohesive teams by fostering and maintaining good rapport w
Cost Engineer/Estimator with supervisory experience. Responsible for budgeting, estimating, budget coordination and total cost management. Identified systems and procedure that are necessary to ensure that the engineering, procurement, construction and start-up phases are properly planned.
Civil Engineer / MBA with 14 years of international construction project management experience.
Dear Sir / Madam, I’m interested a job opportunity with your organization which would require my skills & qualifications. I have 24 years experience Oil/gas & Power Industry, Construction Management/Supervision & QA/QC, Domestic & Overseas.
I am 37 Y rold, have 17yrsp.,after pass Dip. in Mech.engg., and 9yrs exp., after pass Dip. in Industrial safety from reputed institute in India, in Intl. standard Companies like CCIC-Qatar& Kuwait, L&T ECC-India, UB Engg ltd-India& Kuwait, Enelpower s.p.a.-Qatar.My Exp.
Over 6 (six) years experience covering all major systems construction project management experience. Experienced in all kind of system and procedure in building construction work. Project control start from mobilization till completion, involved in procument, detailed design, planning, construction
Many years in Construction Administration and project management with responsibility for Pre-Design to Post construction, putting together all consultants, Architect/MEP and design teams, Manage all project elements and interior design scope, environmental permitting, all portions of the contract.
Seeking a Challenging Position in the area of IT Support with an on going Opportunity for Professional Growth of CHIYODA CORPORATION in Japan.
Engineering / Construction Management
Looking for job in equipment maintenance and repair
Twenty Three (23) + years hands on Industrial, Commercial and Utility Electrical Field experience including installation and maintenance of low, medium and high voltage switchgear.
I have many years experience in Oil & Gas, Power, Chemical, US Embassy, Residential/Commercial and Government work. I have strong Communication, People Skills, Administration and Document Skills.
Building/ Construction technology
Refinery, tank farms, pipelines, gas plants, flow stations and production units. Engineering, procurement, construction and testing/commissioning.
Self-motivated, results-oriented professional with extensive international experience with multinational firms and government-owned facilities in the construction, shutdown, and refurbishing of oil, gas, petrochemical, and power facilities and plants.
INDIAN LEGAL PROFESSIONAL (ADVOCATE) WITH 20 YEARS ADMIN/HR EXPERIENCE IN INDIAN AIR FORCE
30+ years petro=chemical/construction QA/QC experience
Competent Project Controls specialist with Estimating, Claims Management and Risk Management skills. Experience spans 35 years in industries including Nuclear, Fossil and Hydroelectrioc power, Oil and Gas, Refinery and LNG plants. Multi-discipline estimating skills at all levels from FEL onwards.
Supervisor
1   2   3   [ 4 ]   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com