CONTACT INFORMATION:
View contact information...
SUMMARY OF QUALIFICATIONS
Experience: -Twenty Seven years experience as a Piping Designer/Drafter
-Seventeen years (31,000 hours) experience using CAD
-Eleven years (22,000 hours) experience of board drafting
- Five years self employed general contractor, residential construction
-Co-Generation Power Plants
-Aerospace/Commercial Airplanes
-Petroleum
-Chemical
-Pulp & Paper
-Water treatment
-Natural gas processing & distribution
-Coal & Nuclear power
-Materials handling
CAD Experience:
1999 - 2002 AUTOCAD – Ver. 2000i, 1,000 Hours
REBIS Autoplant 3D pipe modeling with Explorer 3D navigation and walk through, Ortho's & Iso's, 1,000 Hours
1996 - 1998 CATIA - V4R1.7, 5,000 Hours
3D Solid Parts Design & Drafting
1988 - 1996 AUTOCAD - R10, R11 & R12, 16,000 Hours
2D & 3D Design & Drafting, Software installation, implementation, development and customizing.
1992, 1995 CADPIPE - Ortho's & Iso's 3,000 Hours
2D Design & Drafting
1984 - 1988 CADAM - R20.1.2. 8,000 Hours
2D & 3D Design & Drafting
EDUCATION: Bachelor of Science Business Administration, 1994
UNIVERSITY OF PHOENIX, Salt Lake City, Utah.
Engineering courses, 1975 - 1976, 1981
UNIVERSITY OF UTAH, Salt Lake City, Utah.
General education courses, 1972 - 1973
WEBER STATE COLLEGE, Ogden, Utah.
EMPLOYMENT HISTORY
1/03 – Present Owner, Dungeness Builders Inc. – General contractor, residential home construction.
9/99 - 9/02 NEPCO (Enron Subsidiary) Bothell, Wa.
Lead Senior Piping Designer for Gas Fired Cogeneration power plants. Duties included: Planning, scheduling, organizing and leading design team for 3D modeling and preparation of site general arrangements, orthographic & isometric construction drawings. Prepared DCN's for engineering changes and FCCR's for field changes. Systems included high & low pressure steam, natural gas, feed water, condensate, cooling water, instrument air, service air, chemical feeds, water treatment, potable water, service water, storm drains and sewer.
Management Training 80 hours
On site construction support 1,000 hours
AUTOCAD – Ver. 2000i, 1,000 hrs.
REBIS Autoplant 3D pipe modeling with Explorer 3D navigation and walk through, Ortho's & Iso's,
1,000 Hours
10/96 - 10/98 Resource Management International Inc. - Contract Employment:
BOEING Commercial Airplane Group, Everett, WA.
Mechanical design for Electrical Equipment Installation: 747-400 Jumbo Jet, 3D Solid Parts Design & Drafting for Racks Shelves and Trays. Duties included: management of satellite communications rack; determining configuration per customer selected options; design & drafting of solids & sheet metal parts; preparing DCN's & ADCN's for engineering changes; completing LDAR's & ELCCR's for shop revisions; SDRC parts input. Trained in and used: CATIA solid modeling, assembly modeling, advanced construction techniques, surface modeling, DCAC/MRM, REDARS, SDRC, APLG, PLINQ, DIOLS, WIRS, ELI, and GD&T.
CATIA - V4R1.7, 5,000 Hours.
2/96 - 7/96 Engineering Corporation Of America - Contract Employment:
A. H. LUNDBERG ASSOCIATES Bellevue, WA.
Piping & Mechanical design for Pulp & Paper facility: International Paper Company, Bastrop, Louisiana; 3 Effect Evaporator System & NCG Incineration. Duties included preparation of construction drawings from p&id's and piping specifications. Plant/equipment layout, pipe routing, control valve stations, hangers and supports, instrumentation placement. Systems included black liquor, cooling water, natural gas, vapors, and air.
AUTOCAD - V12, 1,000 hrs.
10/92 - 2/96 Mini-Systems Associates - Contract Employment:
ZURN-NEPCO Redmond, WA.
Piping & Mechanical design for Smithfield Cogeneration Facility, Smithfield, NSW Australia; 160 Mw Combined Cycle Cogeneration. Duties included preparation of Orthographic & Isometric construction drawings from p&id's and piping specifications. Plant/equipment layout, pipe routing, control valve stations, steam/condensate traps, hangers & supports, instrumentation placement. Systems included high & low pressure steam with expansion loops to steam generator, natural gas for turbine generators, feed water, condensate, cooling water, instrument air, service air, chemicals, utilities, water treatment.
Piping & Mechanical design for 40 MW Wood-Fired Power Plant Modifications - Alternative Energy Inc., Livermore Falls, Maine; Duties similar to above.
INDUSTRA INC. Seattle, WA.
Piping & Mechanical design Pulp & Paper facility; Western Pulp Port Alice, B.C.: Secondary Treatment & Bleach Plant Modifications. Duties included: determine on site piping tie-in locations, as-built existing piping, preparation of construction drawings with p&id's and piping specifications, plant/equipment layout, pipe routing, control valve stations, hangers and supports, instrumentation placement. Systems included black liquor, cooling water, natural gas, vapors, and air.
CHRISTENSON ENGINEERING CORP. Bellingham, WA.
Piping & Mechanical design for Petro-Chem Refinery; Shell Oil Co. Anacortes, WA. Isom. Feed Prep. - Clean fuels project. Duties included: determine on site piping tie-in locations, as-built existing piping, preparation of construction drawings with p&id's and piping specifications, plant/equipment layout, pipe routing, control valve stations, hangers and supports, instrumentation placement. Systems included hydrocarbons, cooling water, natural gas, vapors, and air.
ZURN-NEPCO Redmond, WA.
Piping & Mechanical design for co-generation facility; Saranac Energy Co. subsidiary of Falcon Seaboard Power Co. Plattsburgh, New York: 240 Mw combined-cycle cogeneration power plant. Duties similar to ZURN-Nepco work listed above.
AUTOCAD – Ver. 11 & 12, 3,000 hrs.
CADPIPE - Ortho's & Iso's 3,000 Hours
Board Drafting - 1,000 hrs.
10/88 - 10/92 EKONO INC. Bellevue, WA.
Piping & Mechanical design for Pulp & Paper facilities:
Lead Piping & Mechanical designer. Duties included: Installation, management & customization of AUTOCAD. Preparation of construction drawings for site plans, topo's, general arrangements, flow diagrams, p&id's, piping spec's, & line lists. Client & vendor coordination. Systems included; digesters, deckers, bleaching, steam, condensate, peroxide, black liquor, effluent, turpentine, mill water, cooling water, natural gas, ncg's, vapors, air, hvac.
AUTOCAD - V10, 8,000 hrs.
3/88 - 10/88 HARRIS GROUP INC. Seattle, WA.
Piping & Mechanical design for Pulp & Paper facility; Simpson Tacoma Kraft, Tacoma, WA: New bleach plant including pulp storage, and a 3-stage bleaching and washing process. Duties included: preparation of construction drawings for plant/equipment layout, pipe routing, control valve stations, hangers/supports & instrumentation placement for first floor of new bleach plant. Systems included bleaching, steam, condensate, black liquor, chemicals, mill water, cooling water.
Board Drafting - 1,000 hrs.
11/81 - 2/88 NORTHWEST PIPELINE CORP. Salt Lake City, Utah
Piping & Mechanical designer for hydrocarbon processing; natural gas compressors, sales meter stations, fire water pumping, environmental clean-up of PCB contaminates, compressor foundation repair and re-grout, district offices, shops, & warehouses.
Duties included: determine on site piping tie-in locations, as-built existing piping, preparation of construction drawings for site plans, general arrangements, plant/equipment layout, pipe routing, control valve stations, hangers and supports, instrumentation placement, office building, compressor & metering building, process buildings, survey interpolation for topographic maps.
Systems included hydrocarbons, steam, condensate, butane, ethane, cooling water, natural gas, vapors, and air.
CADAM - R20.1.2, 8,000 Hours, 2D & 3D Design & Drafting
Board Drafting - 6,000 hrs.
5/78 - 11/81 PM ENGINEERS INC. Salt Lake City, Utah
Piping, Mechanical, Structural & Architectural design for chemical & mining facilities:
Duties included: determine on site piping tie-in locations, as-built existing piping & material handling, preparation of construction drawings for site plans, general arrangements, plant/equipment layout, conveyors, hoppers, chutes, pipe routing, control valve stations, hangers and supports, instrumentation placement, office building, compressor & metering building, process buildings, survey interpolation for topographic maps.
Systems included hydrocarbons, steam, condensate, beryllium, phosphate, cooling water, natural gas, vapors, and air.
Board Drafting - 8,000 hrs.
1/77 - 5/78 JELCO INC. Gillette, Wyoming
Piping design and engineering support for power piping construction at Wyodak Coal Fired Power Plant. Duties included: piping redesigns, scheduling, progress reports & punch lists, as-builts, piping and hanger designs.
Board Drafting - 3,000 hrs.
8/74 - 9/75 JELCO INC. Salt Lake City, Utah
- On site Engineering support for the process instrumentation construction at the Trojan Nuclear Power Plant, Rainier, OR, duties included progress reports, as-builts, & redesigns.
- Shop detail drafting, administration and engineering support for nuclear and conventional power piping fabrication, Salt Lake City, UT.
Board Drafting - 2,000 hrs.
6/72 - 8/73 ASSOCIATED PIPING & ENGINEERING Clearfield, Utah
Piping fabrication detail drawings for nuclear and conventional power plants.
Board Drafting - 1,000 hrs.
View contact information... |