EDUCATIONAL
- Diploma Degree Electrical Engineering International Correspondence School Singapore Certificate
- Bachelor Degree Power Engineering INSTITUT TEHNOLOGI PEMBANGUNAN SURABAYA Certificate. GPA: 3.13
Careers Summary
Having experience more than 20 years in various electrical instrument projects
Construction, pre commissioning and commissioning as:
Construction Superintendent E / I, Field Electrical Instrument Engineer,
E&I Commissioning Engineer, QA / QC Electrical Instrument, E&I Supervisor
Areas of Expertise
-Construction, pre commissioning, commissioning 60 MW Combine Cycle Power Plant, 10 MW coal fire steam turbine, gas turbine generator, various electrical equipment, 150 KV & 70 KV Sub station, 11 KV, 70 KV &150 KV Power transformer maintenance, 11 KV Over Head Line Power Distribution & 70 KV Transmission Line
-Electrical instrument construction engineering, pre commissioning, commissioning, electrical & instrumentation system at Oil & Gas, Power Plant, mining, QA/QC electrical instrument, Motor control system, Maintenance planner
-Project Dossier, Project estimator, piping system, Project Management, MS office, MS project, MS Visio, Computerize Maintenance Management System ( CMMS ) Maximo & MIMS
Course Attended
-Electrical Industry in the Electrical Industries Training Center Certificate
-Basic Power Distribution and Transmission Lines at State Owned Company of Electricity Certificate
-Advanced Power Distribution and Transmission Lines at State owned Company of Electricity Certificate
-Cherry picker, crane truck operator, driving license
-Programmable Logic Control Allen Bradley.
-Leadership
-Project Management certificate.
-Safety Training Observation Program certificate.
-Advance Safety Auditing certificate.
-HSE awareness & Scaffolding certificate
-Fire Fighting and Breathing Apparatus certificate
-Risk Assessment Certificate.

WORKS EXPERIENCES

1. May, 2007 – Feb,2008
Total Indonesie E & P of Oil & Gas Company as Construction Superintendent Electrical & Instrument for Construction, Pre commissioning of Electrical & Instrument System of Offshore Oily Water Treatment and Gathering Testing Satellite Project TP-12

Job description
-Liaise to electrical instrument contractor for installation of electrical instrument equipment, erection and outfitting activities at onshore fabrication site and during offshore installation hook up, pre commissioning of electrical system.
-Monitor and control the contractor to achievement in accordance with the contractual requirement in areas such as safety, technical requirements, planning etc
-Review design drawing, specification, data sheet, tie in procedure, pre commissioning, witness test electrical equipment and other technical documents and standard to ensure compliance with applicable contract requirement, ensure that works which requires completion offshore is recorded on interface schedules, Review & prepare progress report and solve problem related to the execution of the works.
-Prepare project dossier, review BOM/MTO which provide by contractor
-Control of the project construction & supervise of electrical & instrument project and liaise with other discipline safety, ensure that the quality of the works is acceptable conform to design and specification

2. Oct, 2005 – April, 2007
Sub Contractor E&I at PT. Kaliraya Sari EPC as Construction Manager Electrical Instrument of Electrical & Instrument Project for Construction Engineering, Pre commissioning, Commissioning of Electrical Instrument system at off & on shore Chevron Sapi project development consist of well head platform, process platform and VICO Indonesia LP Compression project

Job description
-Manage of project construction electrical and instrument, erection and outfitting activities at onshore fabrication site and offshore installation hook up consist of well head instrument control system and process platform, coordinator commissioning team, attend relevant project meetings with client
-Review design drawing and other technical documents to ensure with applicable contract requirement, project estimator, forecast man power, prepare progress report and solve problem execution of the works
Prepare completion project dossier for submission, review BOM/MTO which prepare by engineering, prepare as built drawing and planning daily activities construction.
-Supervise team of electrical instrumentation supervisors in their control of the project construction and liaise with other discipline safety, cost, planning, administration section, ensure that the quality of the works is acceptable conform to approved design and specification
Remarks: Completed Project.

3. June 1998 – September,2005
VICO Indonesia E&P On shore & Off shore Oil and Gas Company as Electrical/Instrument Engineer for project engineering, construction, commissioning, project estimator of various electrical instrument project under Engineering & Construction Department.
Report to Construction Manager

Job description
-Supervise and manage of electrical instrument project construction and re engineering upgrade electrical & instrument existing facilities & new project.
-Pre commissioning, commissioning & performance testing E / I equipments of various project consist of MP,LP,VLP compressor, MCC, MV switch gears, power distribution transformer etc
-Prepare weekly construction progress report, monitor electrical instrumentation equipment delivery and FAT¾ of electrical instrument equipment, prepare MTO/BOM etc
-Prepare Electrical & instrument tie in and commissioning procedure, approved as built drawing, prepare completion report document & turn over document.
-Prepare estimate quotation of project base on construction drawing & review quotation cost of project from contractor and review & approved construction progress report contractor.
-Preliminary engineering to produce electrical single line drawing and work with electrical & instrument designer to develop logic flow diagram.
-Prepare materials specification & data sheet, evaluate proposal from electrical instrument equipment and recommendation proper suppliers.
-Approved and review of vendor drawing to perform detail electrical & instrument design of system.
-Prepare scope of work construction of electrical instrument system and engineering.
Remark: Completed Contract

4. November 1995 – May 1998
Rolls Royce Industrials Power System LTD EPIC Contractor, Turn Key Project 60 MW Samarinda Combine Cycle Power Plant as Electrical Engineer

Job description
-Construction, Pre commissioning, Commissioning and Start up of 60 MW Power Plant consist of 2 x 20 MW gas turbine & 1 x 20 MW steam turbine and 150 KV Sub station, gas treatment plant, water treatment plant, MCC, 30 MVA step up power transformer 11KV to 150 KV, 2,5 MVA power distribution transformer, MCC and other miscellaneous electrical equipment and attend factory acceptance test of electrical equipment
-Inspection of electrical equipment and manage & supervise of construction project, Project control, review of construction drawing and contract document
-Prepare progress report project, approved as built drawing, review quotation of electrical instrument, documentation project, responsible issued electrical instrument materials, Etc
Remark: Completed Project

5. February 1993 – October 1995
BOW VALLY LTD oil Company joint operating body with PERTAMINA-Tanjung at South Kalimantan as Field Electrical Supervisor for construction Open Cycle Power Plant, Water Treatment & Water injection Plant

Job description
-Construction, pre commissioning, commissioning & start up open cycle 2 x 3 MW gas turbine generators, water treatment plant & water injection plant 150.000 BPD and supervise construction team, planning project activities and perform Hi pot test MV cables
-Documentation project, as built drawing, progress report & arrangement workers
-Installation of electrical equipment & instrument device, prepare as built drawing
-Prepare progress report project, plant maintenance, rectify electrical troubles shorting
Motor control system
-Construction, commissioning & maintenance of 6,6 KV over head line power distribution
Remark: completed Project

6. August 1990 – January 1993
PT. KALTIM PRIMA COAL mining at Sangata East Kalimantan as Electrical Supervisor for construction, pre commissioning, commissioning and maintenance of Coal fire steam turbine & Diesel generator, 70KV transmission lines & 11 KV power distribution system over head, under ground and Facilities maintenance plant.

Job description
-Construction, commissioning, start up and maintenance of 2 x 5 MW coal fire steam turbine & 3 x 2 MW diesel generator, 70KV & 11KV sub station, 70KV transmission line, 11 KV power distribution over head line & underground system, HV switch gears, steam Turbine MCC, Over land conveyor, Stacker, un loader, Re claimer, ship loader etc.
-Construction & maintenance step up 70 KV Power Transformers & 11 KV power distribution transformers
-Rectify generator troubles shorting, construction and maintenance of power distribution system over head line and street lighting.
-Prepare progress report project, scheduler electrical plant maintenance, project documentation, prepare as built drawing and daily activities project construction.
Remark: Resign own my request

7. June 1984 – July 1990
PT. Sangkulirang Bhakti Plywood Company at Samarinda East Kalimantan as Electrical Supervisor for Construction & Maintenance plant facilities
Job Description
-Construction, commissioning electrical & instrumentation system, start up plant and maintenance 4 MW diesel generators.
-Installation cabling system, scheduler plant maintenance; prepare daily report activities project & plant maintenance and arrangement workers,
-Rectify electrical troubles shorting, and generator maintenance, etc
Remark: Completed Project & resign on my request

8. February 1982 – March 1984
BECHTEL Inc in the Balikpapan East Kalimantan as Electrical Foreman for Construction & Maintenance of Refinery Project
Job Description
-Installation cabling system, power, control, instrument and electrical building
-Prepare daily report project activities, plant maintenance and arrangement workers.
Remark: Completed Project.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1 to 50 of 1637)Go to Search Parameters...
Brief Description
Free! A seasoned, highly organized construction professional with over 38 years of heavy industry experience which includes both industrial construction sites and field/shop fabrication locations in the Pulp & Paper, Petro-Chemical, Government, Hydro Electric, Institutional, Mining, Nuclear and Wind Power
Free! Commercial Manager ( Contracts & Procurement ) / Project Control Manager with cost and planning background
Free! Instrument Engineer and technician with 27 years experience in design, installation, commissioning, start-up, operations and maintenance of oil and gas facilities worldwide.
Free! Experienced Safety engineer, CSP. Bilingual Spanish/English. Authorized to work in the European Community.
Free! International Oil and Gas LNG Supply & Logistics, Procurement, Inventory Control, Material Control,Expediting, Warehouse, Contracts Administration, SAP R3 MM 4.6 and Spare Parts Cataloging
Free! I am a Canadian, "Hands-on", Project Manager/Superintendent interested in International work again. My extensive experience is in Heavy/Civil and Oil & Gas Pipeline Construction. I have a reputation for completing on-time, safe and cost-effective projects in various climates and nationalities.
Free! Electrical with 25 plus years encompassing all divisions of the electrical industry.
Construction Project and Contracts Manager
Chartered Civil Engineer with 30 plus years' experience in project control, construction, & design of major infrastructures, including reclamation, highways, water, drainage, sewage treatment works, underground and above-ground railways. Specialised in Geotechnical Engineering.
Project Planning and Management
Chartered Civil Engineer , B.Sc in Civil Engineering w/ experience in Project Management & Execution,Conceptual and FEED Studies , Administration, Cost and Schedule Control, Site Construction Management, QA/QC, Subcontracts, Procurement, Material/Logistics,Commissioning,Operation
Management of complicated technical and custom design projects (all stages of Turn-key projects). Industrial, residential, commercial property. Power supply, distribution. Permitting and solving questions with state structure.
Senior Civil Engineer - Power Line
Senior Project Manager with wide international experience in (large to medium scale) Civil and Mechanical/Electrical/Construction Projects in the fields of of (high rise) buildings, real estate development, (underground) infrastructure, utilities, services and transportation. Experience with FIDIC.
Planning Manager & Project Controls Manager in program management, construction management and project controls for rail, airport and community development projects.
Electrical and Power System Engineer with over thirty–one years of experience in the field of MV and LV power system related equipment.
30 YEARS OF INTERNATIONAL PROJECT MANAGEMENT EXPERIENCE
Structural Design and Planning
Experienced in general building, electrical and mechanical construction and installation, mechanical/electrical engineering supervision, and construction accounting.
Free! 30 plus years in hospitality, condominium,& resort construction/development management
Subcontracts Director / Program Manager / Materiel Manager and procurement professional with over twenty-five (25) years experience for “hands on” manufacturing and services corporations. Skilled in the preparation and issuance of Request for Proposals; subcontract/procurement negotiation for goods
Highly motivated individual
Kuangtonese, (IN Taiwan) work in English more than 20 years, good at highway bridge, road ,tunnel, TBM,
Construction Superintendent Electrical & Instrument
Engineering graduate, with proven track record of successfully setting up and managing diverse industrial and project / serviceoriented
End to End Project Management for the construction of EHV Transmission Line
I am a person with tertiary degree in economy. For 18 years I have been involved in tunneling operations (drill & blast, auger drilling, hand excavation, pipe jacking and culvert jacking pipelaying including hands on experience. I did prepare SWMS and OH&S plans as well.
Dir of Construction / Project Manager / Owner's Rep.
I have more than 20 years of experience in the area of engineering and project management with several governmental organizations and international private contractors as a Program Manager, Contract Manager, Resident Engineer and as a Project Engineer.
Professional having over 25 years experience in EHV Substation & Transmission Projects Management
In my 26 years of working in the consultancy, construction and engineering field, I have gained enough experience to offer my services in the areas listed below. My experiences range from design, engineering to field operation and contract management and business management including business dvm't
Design, Design Review, Shop Drawings and Project Management
25 years experience in construction management of mining operations, highways, dams, site preparations, environmental, airports and petrol – chemical projects. Management assignments in 12 major projects.
Innovative procurement department head with a high level of integrity and more than 20 years experiences at engineering & construction company.
Experiienced in estimating, forensically challenged change orders, cost analysis, bid analysis and project supervision. I have accreditation for osha 10, 30, and osha 500(certified to teach the osha 10 & 30 hour classes)
Chief Finance Officer of Group having One Islamic Investment Bank in Dubai and Asset Mangement Company in Malaysai,
More than 15 years of civil engineering experience and at least 10 years experience within project planning/project control of which 7 years are within tunnelling experience. BSc Civil enginnering & MBA business management
Detail-driven engineer with a B.Sc in Mathematics & Management. Skilled problem identifier and trouble shooter able to pinpoint and resolve errors in early stages to avoid time/cost expenditures. Efficient, organized leader with success in coordinating efforts to reach and surpass expectations.
Seasoned Procurement and Materials Management professional with leadership qualities and multifaceted experience in excess of 29 years, seeks managerial position where knowledge, skills and experience are considered an asset.
Graduated in B.Eng civil 1976 and Post grad Hydraulic in 1982, total 28 years experience in civil, infra such as steel, timber, road, car park structures and sewer and pipe laying as well as tunnels and pipe jacking works.
More than 20 years management experience in power plant design, construction, operations and maintenance. My experience includes work in Canada, Australia, Taiwan and Indonesia and covers the full range of issues from strategic planning, project conception, finance and environmental compliance.
Engineering and construction executive with MS in civil engineering and construction management and BS in general engineering, with extensive hands on and executive level experience in project, construction, and contract management in multi-deceiplinary projects in the international arena.
MBA Graduate in Finance & Accounting
Construction Engineer/Manager-Pike Company, Rochester, NY
Health Safety Environment Risk Mining Engineer
QA/QC construction Manager
License: Florida State Certified Building Contractor (1985 – Present
Having 17 years of work experiance in MEP construction feild willing to take up challenging job.
International Project Management for 5 and 6 Star resorts and golf course experience.
International Project Management Residential Commercial Industrial
[ 1 ]   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com