Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #80806 next resume »»
CONTACT INFORMATION:
View contact information...

DETAILS OF QUALIFICATION

Exam Passed Year of passing Name of University / Board Remarks

Diploma in Mechanical Engg. 1970 Board of Technical Education Tamilnadu, India
Diploma in Tool Design 1975 Board of Technical Education Tamilnadu, India
CSWIP 3.2 - Sr. Welding Inspector May 2000 TWI London Valid up to April 2010
Level III in PT, MT, RT and VT Nov 1999 ASNT Valid up to NOV 2009
ISO9000:2000 Series Auditor/Lead Auditor 2008 LRQA

8. COMPUTER LITERACY Microsoft word, Excel, FoxPro, Access & WinPCS

9. BRIEF SUMMARY OF EXPERIENCE:
QA/QC/ CERTIFICATION / DOCUMENTATION /COMPLETION / TURNOVER

a. Preparation of Quality Plan, Inspection and Test Plan.

b. QA/QC on Equipment/Structural/Piping erection, Welding and Documentation.

c. Preparation of WPS and conducting PQR/WQT as per ASME Sec IX, API 1104 & IBR

d. Auditing and Surveillance as per Procedures.

e. Welding visual Inspection.

f. MT, PT, UT and Radiographic film Interpretation.

g. Preparation of test packs, Arrangements for Piping/Valves testing, Co-ordination and Inspection.

h. Stores incoming Material Inspection-Equipments, Valves, Pipe, Fittings, Insulation, etc.

i. Certification/Turnover - Organising and Managing Certification/Turnover Department activities
Verification of MRB, Inspection reports for Mechanical, Piping, Civil and E&I as per QCP, Documentation of Inspection reports, Preparation & Submission of Mechanical completion dossiers to cover Construction, ProComm and Commissioning Completion. Preparation of required Programmes, Reports and Status In FoxPro Database. Activities to satisfy ISO 9000 series requirement.

j. Co-ordination with Construction, QA/QC, Planning and Engineering departments.

k. Scanning and Final Handover of Original documents to the client.

l. Organising and Managing the Punch List Activities, Database files and Reports.

m. Equipment, Structural, Piping and Pipeline fabrication and erection.

n. Site co-ordination, progress monitoring & preparation of progress reports and Billing.

o. Computerisation involving data entry, preparation of database and reports.

- 2 –

10. DETAILS OF EXPERIENCE:

COMPANY / PROJECT / CLIENT / PERIOD / POSITION / EXPERIENCE

A. Teknica (U.K.) Ltd.
Mellitah Oil and Gas BV, Gas Division
HSEQ Corporate office, Tripoli, Libya - Sr. Certification Engineer

Nov 2008 – As of Date

Preparation of Procedures as per the requirement of Projects.
Review and Approval of Contractor and Sub-Contractor Procedures, Work Instructions and
Inspection & Test Plan.
Review and Revision of various Department Procedures.
Internal and External Auditing.
Ensure the required QA/QC requirements are fulfilled by the Projects and indicating the exact requirements
To satisfy Corporate/Project Procedures, ISO 9000 and International Standards.

QA/QC Co-ordination to Projects for Contractors and Sub-contractors activities

Review of Mechanical Completion Packages, MRB and Final Turnover Documents during the phase of Construction, Pre-commissioning and commissioning to ensure all these packages are arranged as per Project Procedures and as per the required Standards.

B. Consolidated Contractors Int'l Co., Abu Dhabi, UAE,
Habshan Gas Complex Expansion Project, GASCO
Sr. Certification / Turnover Engineer

April 2008 – Sept 2008

Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client. Checking of Tags requirement and assigning tags as per Drawing for which tags not issued by Client. Assigning System No. for Tags as per System limit Drawings. Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per specification and procedures.
Execution of All disciplines Inspection Reports Filing and arranges to locate for easy traceability.

Co-ordination with Construction, QA/QC, Pre-com and Commissioning Departments for the requirements to achieve Mechanical Completion and Commissioning as per Project Schedules.
Compiling of Specific and Generic inspection reports as per System to handover to client. Tracking of Progress, informing Status to Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve Commissioning.

Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Computerisation of data including preparation of Software/Programs in FoxPro for entry in Database, preparation of status / report as required. Punch list Tracking, Status and Preparation of required Reports.
Scanning and Turnover of Documents as per Project Procedures.

Cont…3

- 3 -

C. Chiyoda Corporation, Chiyoda Technip Joint Venture, - QGX II LNG Project, State of Qatar
Sr. Certification Engineer
Feb 2007 – Dec 2007

Turnover / Mechanical Completion Department
Execution of Activities:

Ensure the proper setup of Sub-Contractors certification Department with required resources.
Ensure Sub-Contractor's database for documentation is developed to meet the project Procedures requirements to track the progress and producing Reports for the required Details.
To check transfer of the required tags from Contractor's WinPCS system to Sub-contractors database and to ensure the forecast of the required Inspection and test reports, Data entry into Database for the required details and filing of the documents as per Project Procedure requirements.
Co-ordination between Sub-Contractors, CTJV Turnover Group and Client for all Certification issues in resolving day to day problems,

Organising Databases and Reports as required for assessing the Progress and Status of Systems for CTJV personals.

Arrange required reports to ensure components required for Systems are completed with the appropriate Inspection Reports to submit with Mechanical Completion Package.
Co-ordination with Sub-Contractors, CTJV Construction/QC/Commissioning & Turnover Departments to keep the target date of the Mechanical Completion.
Arrange to Issue the progress /outstanding Reports to ensure the System completion as required.
To ensure Sub-Contractors maintain outstanding items in Punch List Database incorporating required details and closing of the activities after completion. To produce required reports to track the punch list outstanding and completed.

To ensure Sub-Contractors maintain Specific and Generic inspections reports for easy traceability and as per project procedures.
Indicate the requirements for arranging and Turn over of Original Documents as per Project requirements with appropriate files & indexes and to ensure all the required Specific and Generic documents are included.
Assisting Turn Over Group for the Preparation of Mechanical Completion and Commissioning Dossiers, Scanning of the Documents and
Turn over of System Original Documents to Client as per schedules.

D. Global Petroprojects Services, Saipem, Sakhalin, Russia - Phase 2 Oil & Gas Pipeline Project

Sept 2005 – Jan 2007 Certification Engineer
QA/QC - Certification Dept.
Execution of activities:
Preparation of Main System / Sub-System Limit Drawings and components as per Project requirements.

Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client. Forecast of required tags for Pipeline & AGI Activities. Assigning System No. For Identified Tags forecasting ITP requirements, Receiving Inspection and Test Reports, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for all Disciplines and to check the completion as per specification and procedures.
Checking of sub-contractor's Pre-test, C&G and Final Test packs as per Project and Procedure requirements and to issue clearance for the activity.

Compiling of Western and Russian Documents as per System to handover to Client. Tracking of Progress, Preparation of CRR, informing Status to Spread/Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve ProComm / Commissioning. Ensure outstanding activities are carried over to Punch, tracking of Punch List Status and Preparation of required Reports.
Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Coordinating the activities with All Pipeline Spreads and organising Main Database, to achieve final completion of the Project.
Scanning and Handing over the Documents as per Project Procedures.

Cont…4

- 4 -

E. Consolidated Contractors Int'l Co., Sultanate of Oman - Oman – Sohar Refinery Project

June 2005 – July 2005 Certification Engineer
Certification Department Activities (As indicated in Sl. No.K )

F. Consolidated Contractors Int'l Co., Sultanate of Oman - Oman – India Fertilizer Project

Oct 2004 – April 2005 Certification Engineer
Certification Department Activities (As indicated in Sl. No.K )

G. Consolidated Contractors Int'l Co., Aksai, Republic of Kazakhstan - Karachaganak Project

July 2001 - Sept 2004 Certification Supervisor

Certification Department Activities (As indicated in Sl. No.K and also executed the works as per the requirements of ROK Standards and Procedures. )

H. Consolidated Contractors Int'l Co., Abu Dhabi, UAE - Onshore Gas Development Project, Phase 2
Abu Dhabi National Oil Company

May 1999 - April 2001 Certification Supervisor
Certification Department Activities (As indicated in Sl. No. K )

I. Dodsal Private Ltd., Muscat - Gas Pipeline Project, Petroleum Development of Oman

FEB 1999 - APR 1999 Sr. QA/QC Inspector
Duplex Stainless Steel Piping/Pipeline Fabrication,Erection,Welding Inspection,PT,UT and QA/QC activities

J. Consolidated Contractors Int'l Co., Doha, Qatar - Khatiyah Degassing Plant and pipeline.
Pressure Water Injection project
Ras Laffan LNG Project,
Qatar General Petroleum Corp.
Ras Laffan LNG Company

Jan 1997 - Oct 1998 Sr. QA/QC Inspector

QC Dept. - Welding Procedure preparation, Conducting PQR, Qualification of Welders, welding visual Inspection, Piping spool dimensional checking, MT, PT, Radiographic film interpretation and co-ordination, PWHT / Pressure test co- ordination and inspection, preparation of Pressure Test Packs, Material Inspection, QA/QC on equipment, structural/ piping fabrication & erection and preparation of Project
Dossiers.

K. Consolidated Contractors Int'l Co., Abu Dhabi, UAE - Onshore Gas Development Project, Phase 1
Abu Dhabi National Oil Company
Nov. 1993 -July 1996 Certification Supervisor
Certification Dept. Activities: Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client-Assigning System No. for Tags as per System limit Drawings. Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per specification and procedures. Compiling of inspection reports as per System to handover to client. Tracking of Progress, informing Status to Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve Commissioning.
Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Computerisation of data including preparation of Software/Programs in FoxPro for entry in Database, preparation of status / report as required. Punch list Tracking, Status and Preparation of required Reports.
Scanning and Handing over the Documents as per Project Procedures.

L. Consolidated Contractors Co, Dhahran, K.S.A - Gas & Oil Separation Plant, Saudi Aramco Project
Jan 1992 - Sept 1993 QA/QC Inspector
QA/QC inspection on structural fabrication / erection, equipment erection & CS/SS/RTR piping fabrication and erection. Inspection of internal and external coating/painting for vessels and piping. Preparation of Procedures, progress, planning schedules and Turnover of Original documentation to Client.

Cont…5

- 5 -

M. AICAM Engg. Pvt. Ltd., Madras, India. Nuclear Power Project, Oil Natural Gas Project, Offshore Project
Aug 1990 - Dec 1991 Deputy QA/QC Manager
Fabrication, Welding, NDT and QA/QC of Nuclear components, Pressure vessels and tanks. Planning, estimation, fabrication, welding, erection and QA/QC for Jacket.
N. Foster Wheeler - SNC, Canada, Zia Fertiliser Co. Ltd. Bangladesh (129 TPH Process Boiler)
Nov 1989 - July 1990 Mechanical site Engineer
Planning, erection of structurals and stack. Fabrication & erection of LP & HP piping, welding, NDT, Insulation & painting. Preparations of field run piping drawings/As-built drawings and QA/QC.
O. GEC Power Engg. Services, New Delhi, India - GEC TGIL, UK, Balco Captive Power Plant (68MWx 4)
Ennore Thermal Power Plant (110MW)
Malaysia National Elect. Board(210MW)
July 1986 - Nov 1989 Deputy Manager
Erection of equipments and piping. QA/QC on erection, testing, welding, NDT, store and documentation. MT, PT, UT and Radiographic film interpretation. Computerisation to maintain drawing, welding/NDE status and other documentation. Maintenance of pumps, boiler and other piping systems, Insulation and painting.
P. Vijay Engg. & Trading Co., Bangalore, India - Tamilnadu Newsprint Plant,
Tamilnadu Ind'l Explosives Plant
Mettur Thermal Power Plant-210MW
Sept 1983 - June 1986 Resident Engineer
Erection of recovery boiler, erection of all types of equipment and piping. Welding/NDT, QA/QC, Planning, Estimation, Procurement, store, accounts etc. associated with site.
Q. Mukund Iron & Steel Works, Bombay, India - Reactor Research Centre, Kalpakkam, India
June 1982 - Sept 1983 Piping Engineer
Fabrication & erection of Nuclear piping and testing. Welding/NDT, Quality Control and inspection.
R. Madras Atomic Power Project, Dept. of Atomic Energy, India - Madras Atomic Power Station-235MW
May 1974 - Apr 1982 Senior Supervisor
Erection of all types of equipments, HP & LP piping, Planning, Estimation, Inspection, Procurement, Control of sub-contractor, Billing, Preparation of as-built sketches and commissioning of the systems.
S. Tamilnadu Transport Dept. Madras, India - Workshop
Nov 1972 - Apr 1974 Chargeman
Vehicle maintenance, planning, estimation, procurement, Inspection & workshop activities
T. Pallavan Transport Corporation, Madras, India - Workshop
Jan 1972 - Nov 1972 Engg. Apprentice
Vehicle maintenance, planning, estimation, procurement & inspection
U. Vel Engineering Works, Madas, India - Workshop
June 1970 - Jan 1972 Engineer
Procurement and inspection of automobile parts

View contact information...
«« previous resume next resume »»
Search Results (Resumes 601 to 650 of 1795)Go to Search Parameters...
Brief Description
18 Years including 10 years in oil & Gas - Construction experienced Safety Specialist , having Mechanical engineering Degree from Bangalore University and Diploma in Industrial Safety From RLI Chennai, India & OSHA 30 Hours Trained - Key skills : Construction Safety Mangement, Auditing, Trainer
Senior Primavera 6.2 Planner / Scheduler or Management Skills
Highly skilled graduate Project Manager/Civil Engineer and Project Controls Lead with more than 25 years related domestic and international experience in project and construction management.
NDT Resume
PLANNING/SCHEDULING ENGINEER & BACHELOR OF ENGINEERING (CIVIL)
A multi-skilled mechanical/piping, Construction Superintendent/manager, QA/QC Engineer, with over 20 years international experience in the oil, gas, petro-chemical and power generation industries
It is with great interest that I am forwarding my resume for your consideration. My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
•Over 9 years experience preparing detailed estimates for Capital Projects involving all engineering disciplines including process design, civil, structural, mechanical, piping, electrical, instrumentation, and process control for Mining and Heavy industrial Projects.
Sr. Piping Design, Lead Des, ACAD 3D, Microstation 3D
Strategic marketing, business development and executive search professional with strong record of implementing sales and strategic plans that support corporate and financial goals. An effective executive search director & professional.
* Exceptionally qualified Professional with more than twenty years of experience as a Field Engineer in the industrial and power industry
Accomplished technical and managerial career qualified by 24 years of measurable achievements in the construction and mining industries. Highly skilled in identifying, evaluating and negotiating joint venture and other international business opportunities with government officials, the private sect
Project engineering/managment
Mechanical?Electrical Engineer,Steel Expert,Steel Plant operation Incharge Marketing & Sales Incharge ,QMS,EMS.OHSAS Regd Lead Auditor,MBA9Business Admin.Professional Doctorate in Environmental Management.,Handled Projects as well as Maintenance,Director,European Quality Body,Managing Directoer Asia
Senior Mechanical / Piping Engineer
Project Engineer, Assistant Project Manager, Architect, LEED AP, BIM
Experienced Contracts Manager professional with CLA credential, MBA (December 2009) and proven track record with more than 15 years of business expertise in financial analysis, logistics, engineering, FAR knowledge, strong legal background, and project management.
A self-motivated, highly disciplined and hard working graduate electrical engineer with over 26 years of extensive experience in various disciplines such as Specifications, Tendering, Design & Engineering, Construction, Project Management and O & M.
Free ! YOUNG POTENTIAL in FINANCE & ADMINISTRATION
To meet the needs of your company by incorporating project management, estimating, and scheduling experience, with a diverse project background.
Construction Manager Ranging from Field Design, Construction Management, Engineering and Project Engineering Management of Contractors and Inspection. Results-orientated with an ability to stimulate work, reduce costs and
I have US and overseas QA/QC project supervisory experience in the construction, petroleum, mining, and aerospace industries. I am a CWI, Level II in MT, UT, PT and RT film interpretation. Past project duties and responsibilities have included review of purchase orders and exceptions,
Engineer with Business management,
I have more than fifteen years of progressive professional experience and have matured from a background in material / inventory control, coordination, and warehousing techniques for oil and gas maintenance, construction and manufacturing industries.
Over 18 years of extensive experience Maintaining a Safe Work Culture, Budgeting, Strategic planning, Policy Development/Implementation, Finance/Leasing, Fleet Maintenance/Management
Experienced Supply Chain Manager
Action oriented, contracts-project manager
Estimator, Project Manager, Project Engineer, Construction Administrator, Architectural Designer, CAD
Free! Oil & Gas Finance, Commercial Manager. 30+ years industry and 20+ years international experience.
Has 15 years of top, diversified logistics/operations management experience.
Over thirty years engineering, construction, remediation, operations, start-up, and manufacturing experience includes: project management; project planning, sched¬uling and analysis; cost engineering; cost, schedule, and earned value analysis and reporting; WBS, OBS development; EAC, SPSPI and CPI
Radiation Safety Officer, Certified Health Physicist, Environmental Manager
as below
Vast Experience in Business Development, Administration and Management, Business correspondence.
Construction Project Manager Restaurant (Swiss, 39, Trilingual E/F/G) is looking for a new international career opportunity. 10 years experience in construction project management (McDonald's restaurants and General Contractor). Willing to re-locate in the US/Australia/NZ/Canada.
QA/QC, CERTIFICATION, TURNOVER
Experienced Buyer/Purchaser, very versatile background from different countries and industries.
Interior fitouts Project Manager - expertise in Site execution, Management, Planning , Procurement, Coordination between Services. A Go-Getter and Self-Motivated Engineering Professional.
19 years of experience as a Camp / Accommodation-Facilities Management (Staff Welfare Operation and Maintenance) in Oil & Gas, EPCC, Company (Road & Bridge, Electro-Mechanical Contractor.
I am a master electrician with 35 plus years in the management of large construction projects. I have over three years experience working in Iraq, working with many different cultures and in adverse conditions.
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
Senior Electrical, Energy Model, LEED, sustainable, Head, Manager, renewable, coordinator, building commercial, residential, healthcare, Education, industrial, parks, Hotels
Career Objective
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
Highly experienced Project Mgr in construction and environmental projects. Extensive experience in Federal & State projects, contaminated soils & groundwater, demolition. Hands on and takes ownership. Extensive experience in massive soil relocation and placement. Available for overseas projects.
Construction verification, Cost estimation for mechanical systems involving process piping, heavy civil structures, Plumbing, and fire protection. Project management with Profit-Loss responsibility, Project cost control, Project execution, project control & close out.
I am Danish construction engineer. I have worked as a construction manager for about 3 years. The projects have been large infrastructure projects, commercial, and industrial projects. I have experience in site management and project management,
Curtain Wall Civil Structural Engineer Manager
Engineer with practical business, design and management experience in the areas of Civil and Geotechnical Engineering. Educated professional, committed to continuous improvement, ethics, teamwork and quality service. Detail oriented, excellent communicator, and capable of managing multiple projects
16 years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control s
1   2   3   4   5   6   7   8   9   10   11   12   [ 13 ]   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com