CONTACT INFORMATION:
View contact information...

Position: Project Controls Manager
Date of Birth: 27 October 1953
Nationality: British
Qualifications: MBA (Open)
MAPM: Full Member - UK Association of Project Managers (1992)
IPMA: Member: International Association of Project Managers
Summary of Key Experience and Responsibilities

GENERAL

25+ years Upstream Project Controls Management across all stages of Oil & Gas E&P Business Process Life Cycle:

(Feasibility /Technical/Economic/ Risk Analysis, Conceptual Design, Detail Design, Procurement, Fabrication, Installation, HUC and ongoing Asset Integrity Maintenance)

Extensive Client/PMT/EPMC experience in:
Oil & Gas EP Greenfield & Brownfield Fixed Platform, Subsea and FPSO incl development of FDP's, PEP's and EPIC Projects (Planning, Cost Control, MOC and Risk Analysis)

Interfacing Corporate and Project Environments on:
Fixed and Floating hardware with optimal SURF as Asset Solutions for major Operating Companies to enable direct and enhanced hydrocarbon recovery.

PROGRAMME / PROJECT CONTROLS:
Development of:
Work Breakdown Structure (WBS), Cost Breakdown Structure (CBS) Risk Breakdown Structures (RBS), Critical Path (CPM)
Networks for optimising Cost Time Resources (CTR), Schedule / Cost Risk Identification and Risk Mitigation (QRA) models'

Providing the basis for:
Business and Project Control Templates in single and multi-project (Programme Management) environments with varying contracting strategies'

Implementation and Monitoring of
Programme / Project Schedule baseline by physical progress capture, earned value analysis, variance analysis, float trends Predicted Time/Cost over / underruns, resource conlflicts/ saturation and overloads with corrective mitigation of same by resource smoothing and re-analysis of Critical Path at contractually agreed periods with clients or stakeholders

PROGRAMME / PROJECTS PERFORMANCE REPORTING:
Development Implementation and circulation of:
Daily/Weekly/Monthly/ Quarter / Year-end cyclic & close out Programme / Project reports with auditable quality assured (QA) statistics, graphics and textual content as per QMS Reporting Procedures
Corporate audience Level 1 Monthly / Fiscal Year / 2 & 5 Year rolling horizon reports within mission and vision objectives.
Corporate / Project Safety / Schedule / Cost Performance Indicator calculations and reporting.
Contract / Project reporting cycle calendar commitments Textual, tabular and management graphics presentations, facilitated progress / performance / continuous improvement plans

Fully conversant expert user level with:
PRIMAVERA P3,P3/e,P6, Monitor Management Systems (I-suite), ARTEMIS, OPENPLAN (OPP), Microsoft Project 2007, PERTMASTER, @RISK)

Special interest in
Development/ Implementation of Cost / Schedule Integration (C/SCSC) and EVMS methodologies as working Project Management techniques to enhance Project Controls
Services to decision making processes

Sept 2008- Present

WorleyParsons – Singapore
Project Controls Manager (Major Projects)
 Shell LNG
 ExxonMobil SPT (Parrallel Train)
 SRC
Multi- project EPCM Planning, Cost Control & Cost / Schedule Risk Analysis.
Diverse portfolio but only one New Business Development Prospect (SRC) – FID now deffered until 2010
Multiple Subsea FEED studies with acquistion of INTEC
Reporting to Singapore Country Manager and Manager of Projects

Apr 2008- Set 2008 Head of Planning & Risk Management Premier Oil (BV) – Ho Chi Minh City – S.R. Vietnam
Lead Planning & Risk Analysis processes on CAPEX/DRILLEX $1.04BN USD Greenfield WHP + FPSO + Future Subsea Tie-Backs in Development Phase through the Capital Value Process to Sanction Gate and into Execution Phase – this for the Chim Sao Block 12W Prospect in Vietnam.
Produced special Cost / Schedule Risk Analysis (using Pertmaster v.8) to produce p10, p50, p90 cost/schedule reports for Stakeholders to aid investment decision process to Project Sanction and provide Baseline Execution Schedule and Class 3 Cost Estimate.
Planning Management Development Phase and bid selection process to RFA involving 3 EPCI contractors for Fixed Facilities and 5 FPSO Charter Party contractors with optimised SURF and provision for future Subsea Tie-backs
Development of Level 3 Planning CPA Networks in Primavera P6 and Pertmaster for transition from Development to Execution Phase.
Reporting to Development Manager

Senior Project Controls Consultant Carigali-Hess Operating Company – Petronas Towers - Kuala Lumpur - Malaysia
Contract in Kuala Lumpur developing and managing Integrated Planning Team for Offshore Greenfield and Brownfield developments 3 x WHP + Processing Platform retrofit + Subsea Tieback studies (joint - CAPEX ~$1.1BN) within MTJDA (Malaysia Thailand Joint Development Area)
Target Production upgrade from 400mmscfd to 930mmscfd output by Jan 2008.
Also Business Process, PEP and FEED Planning for possible Phase 3 (2007-2012) with subsea tie-back options
Review and Analyses of Contracts programmes and schedule including delay assessments and reporting.
Reporting to Head of Project Engineering and MTJDA Shareholders Committee

Apr 2006 to Apr 2007: Project Services/Planning Manager
Shenhua International / AMEC IPMT – Beijing (China)
Programme Management proposals for new business Dvelopment (4 x LNG Terminals) in China
Planning Management for control of Execution & Implementation Phases of $1.8 BN NCPP (Coal - Syngas – Methanol – Propylene – Polypropylene) Project with aggressive time-schedule constraints - via AMEC (China) IPMT on behalf of Shenhua International.
Use of Primavera P3 for Project WBS, Integrated Planning & Scheduling and also
Reference Convero Project Management System (Cost Planning & Change Control).
Monthly Progress Reporting to SNCG Corporate and AMEC China Regional Directorate.
Managing IPMT Planning Team over Execution & Implementation Phases
Reporting directly to AMEC Project Controls Director
July 2003 – Mar 2006: Senior Project Controls Manager QG2 / Exxon Mobil LNG Project (Japan)
Client International Project Controls Manager Consultant based in Yokohama - Japan
Projects Control of $4.2 BN EPC Contract (2 x 9.8 MPTA Trains) on behalf of QG/Exxon Mobil with CTJV (Chiyoda / Technip Joint Venture)
Planning and Controlling Cost / Schedule on behalf of XOM Business Management Group and Implementation of MOC Processes to monitor scope deviation.
Use of Primavera P3 and SAP JVA for Schedule / Cost Control.
Production of Monthly Report to Venture Management & Excom
Responsible for managing PMT Project Controls Team in Japan
Reporting directly to Business Manager & Venture Controls Manager

Jul 2003 – Jul 2004: Lead Planning Engineer TECHNIP Aberdeen & Cairo for BG Egypt
West Delta Deep Marine Concession - Simian/Sapphire Fields Development NNM Platforms with complex Subsea Infrastucture
Managing schedule-driven EPIC Projects Planning for $750MM subsea (SURF) element of $1.4BN Simian/Sapphire Field Development to recover 800 mmscf/day of Gas in West Delta Deepwater Egypt for Burullus (BG Egypt)
Planning and Controlling Contract Master Schedule on Primavera P3e at Level 3.
Controlling 9 EPIC sub-contractors in Europe, Egypt, Brazil, Mexico and London
Managing Project Schedule/Risk to maintain critical path to 1st Gas 2005.
Using latest Planning techniques proactively as management tool for monitoring forecasting of schedule deviation and aid corrective decision making
Reporting directly Technip / BG Project Directorates (Aberdeen Paris Cairo)

Jun 2002 – Jul 2003
Deputy Head Project Management Services – Shell EP Projects SHELL INTERNATIONAL EXPLORATION & PRODUCTION The Hague
When based in The Hague – Shell Technology Exploration & Production
Projects Management - Cost Planning using P3e and SAP for E & P Upstream projects (mainly Deepwater FPSO & SUBSEAs asset solutions) for Major CAPEX projects ($800MM-$2.8BN USD)
Achieve maximum ROACE across Deepwater EPIC contracts placed by Shell EP. (Major Projects Portflio CAPEX $18BN USD)
When based in Houston - Shell Deepwater Services
Optimal Deepwater FPSO + SURF asset solution for West African Block OML 118
Plan / Cost Schedule & Reporting, Contract Control of Shell Bonga SW Deepwater FPSO + SUBSEA Facility - Base Case was New Build FPSO – Design was Bonga "clone" Topsides, Mooring & Installation with optimised SURF.

Dec 2000 – Jun 2002: Head of Project Planning - Specific Brownfield Projects Wood Group (N.Sea UK & Dutch Sectors) Aberdeen
BP Amoco North Sea Greater Forties Later Life Projects Planning. (SUBSEA solutions)
BP Amoco North Sea Power Project – Development Planning.
NAM HiCAL Fields Gas Evacuation Upgrade Projects – Planning & Cost Control of Integrated Services Contract (EPC) to manage Subsea Field developments obtaining optimal Gas Recovery by upgrades to extend field production life.
Software: Controller for Oracle, Microsoft Project 2000, and MS Office.
Reported to Corporate Planning Manager and Integrated Services Team.

Apr 1998 – Sep 2000: Senior Planning /Cost Engineer HALLIBURTON (KBR) Alliance with CHEVRON / AMEC
Conducted the Planning for CHEVRON ALBA PHASE II refurbishment. (TCE £74mln)
Appointed to accelerate existing CMS to perform time / cost optimisation and completion of contract milestones within Level 1 Field Planning constraints and ensure completion dates were in compliance with offshore hook-up and commissioning programme to meet critical 1st Gas dates.
Software: Primavera P3 v2 for Windows, Microsoft Project 98, and Excel 97.
Also maintained Project /Corporate Performance Measurement indicators.
Reported to Halliburton Project Management and Corporate Planning.
Apr 1997 – Apr 1998: Lead Planning Engineer Consultant TOTAL OIL MARINE / J R McDermott JV (Singapore)
Development of Contract Master Schedule (CMS) Logic, Time & Resources to facilitate Projects Control and reporting mechanism for 2 Fields: TOTAL YADANA Greenfield Surface and Subsea and TOTAL BONGKOT Brownfield developments
FEED Singapore / Fabrication Indonesia / HUC Thailand Bongkot Brownfield -TCE=US$200mln
Planning software: Artemis 7000 v7.6.3, Primavera P3 v2, Excel
Oct 1996 – Apr 1997: Head of Project Planning & Cost Reporting
SHELL / AGIP / SAIPEM JV - Port Harcourt – (Nigeria)
FEED Plan / Cost & Contract Control / Reporting for the Soku Gas Plant Contract in Nigeria. (TCE=US$ 1.1 BN).
Oct 1994 – Oct 1996: Planning Manager NORSKE HYDRO / SHELL / AKER-KELLOGG - Troll Phase II (Norway).
Planning, Control and Reporting on the infrastructure development for Major Process Equipment installation for the Troll Phase II Gas Gathering Plant at Sotra near Bergen in Norway. TCE= 233Bn Kroner (£2.33BN).
Level 2 Contract Control and Level 3 ""working" CMS Development & Control using Artemis 7000. for precedence network analysis and scheduling.
Reported to Norwegian Consortium (Norske Hydro /Shell).
Mar 1993 – Oct 1994: Senior Planning/Cost Control Engineer MOBIL NORTH SEA LTD – (Aberdeen)
Employed to accelerate the development/implementation of IPCS (Integrated Project Control System) to model cost/schedule trends based on offshore man-hour liquidation on Beryl Field Subsea tie-backs and Process Platforms modifications.
The system was designed to model plans at Level 3 on OPENPLAN and use the results of network analysis as the "phasing" element for cost (earned value) reports via the COBRA module providing Project Managers with 'snapshot' trends and forecast over/under runs on time or cost.
Nov 1992 – Mar 1993: Deputy Head of Integrated Operations Planning (OPS/2) BRUNEI SHELL PETROLEUM CO. Sdn Bhd – (Brunei)
Short term contract to initiate new department within Shell Brunei for development and production cross-business function Integrated Plans: - 90-Day Plans/ 2 year rolling horizon Integrated Plans to facilitate 5-year Corporate Plan with specified mission/vision objectives.
Reported to Shell Brunei Senior Management and Shell International Petroleum (SIPM) for Programme Proposal approvals.
May 1990 – Mar 1993 (cont'd):

May 1990 – Mar 1993 Senior Planning Engineering Consultant (FEED) McDermott Engineering (EUROPE) Ltd for SHELL EXPRO (Aberdeen)
Seconded in October 1990 from Shell Expro Northern Business Unit to McDermott Engineering (Europe) after award of Engineering Services Contract (ESC) for Shell Expro Northern Fields in the North Sea.
Subsequent analysis of FEED (Front-End Engineering Design) planning data by developing Business Control Templates using Precedence Logic Networks for: Project Life-cycle models, critical path analysis, what-if scenarios, resource scheduling / optimisation, man-hour / cash flow (S- Curves), progress monitoring /updating and periodic network re-analysis resulting in monthly cost and plan reports production on OPENPLAN

Senior Planning Engineering Consultant
SHELL EXPRO - NORTHERN BUSINESS UNIT (Aberdeen)
Was responsible for all FEED / Detail Design Planning of Shell Northern Fields Platforms Brownfield scopes.
(3month/1year/5 year plans with TCE= £600m). - Interface with Operations.
Development of Corporate Plans to outsource all MMSC functions into an ESC / Joint Venture environment for 5 year asset management programme.
Development and implementation of planning and control procedures.
Responsible to Shell Northern Business Unit Manager.
Nov 1986 – May 1990: Principal Planning Engineering Consultant
TRAFALGAR HOUSE (CJB) - LONDON and GLASGOW
EPIC Project Control - development of BP Bruce Field. Jacket & PUQ Topsides.
Software: Extensive use of ARTEMIS 7000 for precedence network preparation, analysis, updating and reporting.
Responsible to BP Senior Project Directorate.
1981 – 1986: Senior Planning Engineer/ Deputy Planning Manager HOWARD DORIS (STRUCTURES) - SCOTLAND & LONDON
Major North Sea hardware (Jackets & Topsides) construction planning with special responsibility for claims analysis/ preparation and client interface.
Extensive use of ARTEMIS for precedence/arrow networks, logic-link barcharts, CTR catalogues and other documentation specified in ITT (invitation to tender).
1972 – 1981: Planning Engineer BROWN & ROOT Highland Fabricators (Nigg, Scotland)
Planning & Scheduling the fabrication of nodes, pile guides tubulars and other components for inclusion major North Sea hardware.
BP Forties (Alpha & Charlie), Magnus, were the major contracts of the period
.
Computer Skills: Workstation Platforms: Windows Professional / Xp LAN and WAN architectures.

Specialist: Primavera P3, P3/e, P6 Artemis, Monitor i-suite, Openplan/Cobra, MS Project 2007, SAP/R3 (PS, FI, JVA), @RISK, Pertmaster V8.10

Common Operating Environments: Microsoft Office XP (Word, Excel, Outlook, PowerPoint, Visio etc.), Microsoft Sharepoint
E-Mail: MS Outlook, Lotus Notes. Utilising Internet, Intranet and Extranet environments

View contact information...
«« previous resume next resume »»
Search Results (Resumes 401 to 450 of 1810)Go to Search Parameters...
Brief Description
During 19 years, I have gained some practical field experiences & knowledge as a construction civil engineer/ manager which includes, projects construction supervision, project management, quality control, coordination & liaison in the project team, field survey
I am seeking employment on construction/shutdown projects as a QA/QC inspector or planner.
I am 38 years old, good health and have 12 years solid experience on project management for several types of large, complex and fast track International projects.
Senior Construction/ Field Engineer/Superintendent with HND Mechanical Engineering and a member of the institute of incorporated engineers. I have 15 years of experience in Construction management in various roles and locations around the world, working for major EPC contractors.
Well experienced Financial Director with CA(SA) and Masters Degree in Accounting. Vast African and International experience. Was in charge of 18 African operations in 10 countries. Gets the job done within deadlines. Very accurate and technically astute.
Exp.Mechanical & construction manager in Oil & gas , more that 26 years of work with big oil companies.High educated with MSc in Mechanical and offshore engineering from Robert gordon Uni /Uk.
Electrical Project Manager 20+ years experience
Bachelor of Science in Construction Management,National Certificate in Construction studie· Advanced in AutoCAD 2006. Broad knowledge of building trades. Carpentry, Plastering ,Tiling, Plumbing
I am a certified lead auditor in ISO ¡V 9001, OHSAS 18001, ISO 14001 standards.
Licensed Civil Engineer, exposure to project / construction management for 8 years, assigned to do field and office engineering works like field inspection, work monitoring, and cost estimates for 3 years, familiar with basic forms of contracts-FIDIC, CIAP, computer literate - MS office application
Target oriented professional with excellent leadership skills, proactive attitude and mastering strong inter-personal relations with people of different cultures.
Over Ten (10) Years of solid working experience in the sales and customer service environments for Radiology Equipment & Spare parts, Laboratories Equipment & Accessories, Nuclear Medicine, and QC/QA Test Tools. Maintain excellent customer service skills and a proven record as a top sales performer.
20 yrs exp residential contractor
Senior Estimation Engineer for oil and gas construction projects
Circa 30 years work experience (10 years Middle-East / Africa)
25+ years Upstream Project Controls Management across all stages of Oil & Gas E&P Business Process Life Cycle:
Implementation Manager or Technical Project manager
Graduate Civil Engineer working as Senior Quantity Surveyor with over 13 years of experience in construction industry ranging from Bridges, Highways and Building structures. I have also been designated as a Certified Cost Engineer by the AACEI in October 2008. Well versed with FIDIC, CESSM3 & POMI
IT Manager
sr;mechanical engineer /project engineer/construction engineer/manager/engineer
Program/Project Manager
Sr. Geotechnical Engr, Design and Construction of Underground Structures, Mgmt of Multidisciplinary Projects, Numerical Modeling, Rock Mechanics, Ground Support Design, Tunnel Inspections, Hands-on Experience in Applying FLAC, FLAC3d, UDEC and 3DEC Codes in Design, Work Under NQA-1 Q A Program
A good background of Construction Management and Projects Development experience at any Employers Service.
Over 15 Years of Management in Operations, Manufacturing, Installations, Utility / Facility Maintenance, Repairs, Distribution, Capital Equipment Purchasing, Equipment Maintenance, Transportation Maintenance, Minor/Major Construction and Fixed Firm Price/ Contracts
I would like to further my career in maintenance and would enjoy the opportunity and challenges that this opportunity would offer. I believe I have the skills and knowledge that would be an asset to any operations.
OBJECTIVE Senior site agent/ project manager within the commercial construction or civil industry. Remuneration negotiable (from € 50000 p.a. plus benefits), depending on position and region where contract is offered. Would consider any international placement.
Selling Skill, IT-Presales, Management
Facilities Construction Planner and Overseer
Free! Program Director Construction Large Projects SE Asia Hotel, Embassy, High Rise, Medical, Retail, Data Facilities, Power, Roads, MEP Thailand Vietnam Korea Philippines
10 years experience with crane, lifting and rigging. certified in all aspects. looking for a professional company with potential for advancement
Project Manager
To Pursue a Challenging Career in Project Management, Engineering, Construction, Oil / Gas and Power Generation related work Offshore or Onshore.
Professionally qualified accountant in South Africa (CPA). Based in South Africa with work experience in Canada, USA and Mozambique. Varied industries include 10 years in engineering, construction and project management.
Mining Engineer / Project / Operations Manager
Experienced safety professional and proven leader in the Environmental Health & Safety environment. I've developed and successfully implemented several innovative injury prevention programs which has resulted in millions of dollars saved in Workers' Compensation expenditures.
Project Construction Manager (Fabrication, installation, Offshore Hook-up)
Asphalt Plant Manager/Foreman 38 years in asphalt production field
Over 16 years of experience in leadership roles within complex operations, supervising diverse teams and managing challenging programs/assignments within U.S and international locations
Highway Laboratory / QC Manager with 25 years experience in materials
Seeking a position in management with the opportunity for further career advancement through using sound judgment and personal performance. Will consider a staff position with opportunity for advancement.
I am a university-educated Canadian Registered Safety Professional with over 15 years of Environment, Health and Safety experience. This experience has included the development and implementation of EHS management systems, training programs, risk assessments and emergency response plans.
Over twenty-five years experience in Project/Construction Management in an Engineering Procurement and Construction Management environment, specializing in Project Controls, Planning and Scheduling. Project Controls background includes EP, EPC and EPCM.
extensive experience in the field of pre-cast concrete products
Basic education:College of Business Administrartion, Secondary ed. of engineering. Advanced sch: WTA ind.eng.; ISO Quality systems; Turu col of econ. int.marketing; Different schooling in marketing/sales. Lang.: ENG;RUS;FIN; EST. PC-MS Office; MS Project;ind.controllers user interf. Driv.Lic ABCE
Mechanical Master, Master Gasfitter
Objective: My objective is to transition into a new level in my career combining the education and skills I have obtained while pursuing a Masters in International Business with my eleven plus years of construction management experience.
30 yrs. experience in equipment maintenance, operation, and supervision. Expertise: Supervision, planning, cost control, record keeping, PM scheduling, maintenance and repair (electric, diesel, gas), Hydraulics, Pneumatics, Pump and dewatering systems, Milling.
New self-motivated and determined graduate with great credentials looking for a full time challenging and rewarding Project/Construction Management position
22 years experience of which 12 years with in the oil sector where I had to Implement systems, overseeing accounting and carrying internal auditing missions, Significant experience in start up process, J.V. management, Fluent in English, French and Arabic.
Global HSE Manager
1   2   3   4   5   6   7   8   [ 9 ]   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com