Sixteen (16) years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control systems and techniques, analysis, estimates, reporting, statistics, curves and histograms. Proficient with Microsoft products and Auto Cad. Supervised and executed construction of Residential & Commercial Buildings and various civil projects.
TRAINING and SEMINARS
ľ Project Control Cost System (FD Cost)
Fluor Field office, Jubail Industrial area, Kingdom of Saudi Arabia
ľ AUTOCAD 2002-2D, 3D Computer Aided Design Drafting and Color Rendering
Meralco Foundation Institute, Pasig City Manila Philippines
ľ Steel Reinforced Concrete Design for Building Construction
Construction Manpower Training Center, Philippines
ľ Anaerobic Waste Water Treatment Technology
Paques BV Environmental Technology, P.O. Box 52 8560, A.B Balk, Holland, The Netherland
ľ Water Works Supply Program
Pasar / Philphos Training Center, Isabel Leyte, Philippines
PROFESSIONAL EXPERIENCE
FLUOR ARABIA LIMITED (FAL) COST ENGINEER
Sipchem ¡V Jubail Acetyls Complex (JAC) Project March 2008 to Present
Jubail, Industrial Area, Kingdom of Saudi Arabia
Acetic Acid (AA), Vinyl Acetate Monomer (VAM) Plants and new Utilities including cooling water, steam generation, and associated other utilities. EPC Project with a Construction Cost of $455MM USD and 20MM construction hours.
* Prepare and update the In Kingdom (IK) cost reports that includes, contractors / vendors contract and invoices status, commitment modification work based on CSI log.
* Preparation of Monthly Staffing plan, forecast and budget including housing, vehicle and equipment schedules, analysis of policy and escalation.
* Monitor the field purchased order commitments incurred and expended.
* Evaluation of subcontractors progress billings, value of work done (VOWD) and review of quantities.
* Quantity Surveyor assistance with Quantity take-off by contract pay items.
* Prepare weekly and monthly construction progress status report (PSR), hours spent, statistical S-curves, Power point slides including progress photos for internal management references and client coordination meetings.
* Development a project deviation log with cross references for all types of changes. The log tracks prime accounts and areas and is also used for back-charges purposes and reconciliation between extra works against contract quantities.
* Cost estimation for additional works, modification, with respect to design and field changes.
* Check and evaluate contractors and vendors invoices, to ensure that the man-hours and unit rates are in line with the approved timesheets and contracts.
* Purchased Order log, segregation of cost using Fluor standard cost codes, and by prime commodity.
SAIPEM CONTRACTING NIGERIA LIMITED (SCNL) COST CONTROL ENGINEER
Gbaran Pipelines, Field Logistic Base; Offshore Wellhead Project July 2006 to February 2008
Aker Base, Rumuolumeni, Port Harcourt, Nigeria.
Onshore and Offshore Project for SHELL Field Logistic Base and Fabrication of Wellhead Platforms for Exxon Mobil. Engineering, Procurement, Construction and Management (EPC) Project.
* Develop and manage effectively a cost control system which allowed the project to complete within the approved budget using a WBS based on Saipem standard coding.
* Maintained the control budget (revenue & costs) with all agreed changes and necessary internal transfers.
* Monitored subcontracts for progress, value of work done (VOWD) and milestone completion against invoices.
* Reviewed forecasts, deviations and analyzed SAP data to recommend corrective actions.
* Supported the contract claims process providing the cost impact analysis and the close-out report.
* Preparation, Cost Control Report (CCR), Budget and Project Status Reports (PSR).
* Coordination with the Planners on any revision of schedules.
* Develop an operating budget, from the approved bid contract amount for cost control monitoring.
JOINT VENTURE: TOYO ENG, IDRO, JGC & DIC (TIJD) COST CONTROL ENGINEER
South Pars Gas Development Phases 6, 7, & 8, Onshore Project October 2004 to May 2006
Assaluyeh, Bushehr Province, Iran
National Iranian Oil Company (NIOC) for Pars Oil and Gas Company (POGC). Engineering, Procurement, Construction and Management (EPC) Contract.
* Developed cost procedures for weekly and monthly job cost, man-hour, productivity and cost detail reports to determine expended, earned value and the variances against project baselines.
* Prepared back charges, costing of work orders and change orders based on the approved unit rates.
* Develop project cost reports and maintain project cost control system.
* Cost forecasting, contingency and escalation analysis, evaluations, estimate reconciliations, scope comparisons, quantity analysis and cost studies utilizing historical data, statistical analysis, committed cost, activities to-date, productivity and cost quantity comparisons
AL-YUSR TOWNSEND & BOTTOM CONSTRUCTION (AYTB) COST ENGINEER
Titanium-Tetra Chloride Production Facilities Project April 2003 to July 2004
SABIC Industrial Complex for Research & Development, Riyadh K. S. A
* Developed and established the overall project budget by cost code to segregate elements based on the approved bid estimates.
* Cost coding of all invoices to monitor costs against the proper Budget items.
* Prepared and updated equipment costs, direct/indirect labor and monitor against forecasts and budgets.
* Monitored costs and identified changes and impacts to in budgets, cash flows and profit/loss analysis
* Prepare weekly job cost, man-hour, progress and earned value reports using BCWS (budget cost work scheduled), BCWP (performed) and ACWP (actual) methods.
* Estimated changes, prepared invoices and administered back charges.
* Site visits to verify and monitor the actual progress status of the project.
PRIVATE CONSULTANT PROJECT ENGINEER
Libas, Merida, Leyte, Philippines July 2001 to January 2002
* Contracted to design and construct a two story residential building (PHP 3,875,000) and miscellaneous Barangay infrastructure projects. Create plans, design, and specifications, Bill of materials, schedules, cost estimates and building permit. Supervise Contractors.
DAELIM SAUDI ARABIA CO. LTD (DSA) COST CONTROL ENGINEER
Petrokemya Olefins III Project April 1999 to January 2001
Jubail Industrial Area, Kingdom of Saudi Arabia
EPC Project for Arabian Petrochemical Company, Jubail, Saudi Arabia assigned to Project Controls.
* Cost coding of all invoices to monitor costs against the proper Budget items.
* Prepare and update equipment costs, direct and indirect labor and monitor against forecasts and budgets.
* Monitored actual costs and identified changes in budgets or cost impacts.
* Prepared weekly job cost, man-hour, productivity and cost detailed reports for expended, earned values progress and variances as to the forecasts.
* Site visits to verify and monitor the actual progress status of the project.
DAELIM MALAYSIA SDN. BHD. (DMSB) CIVIL QS - SCHEDULER
Gas Processing Plant 5 & 6 Pipeline and Marine Terminals January 1997 to January 1998
Paka, Terengganu, Malaysia
Gas processing plant 5 & 6 Pipeline and Marine Terminals. A joint venture with Mitsubishi and Marubeni of Japan, Snamprogetti of Italy, IJM in Malaysia and Management by Petronas Gas Berhad (PGB).
* Assigned in Engineering and Construction contracts that included all disciplines.
* Reviewed and verified submitted quantities, calculations and approved take off quantities.
* Worked with Project Controls on budgets, estimates, and weekly progress and manpower reports.
* Coordinated with Finance, Planning and other disciplines to monitor and report against budgets,
* Participate in the preparation of technical information for change orders.
* Review contractors' monthly invoices and quantity measurement based on actual site progress.
* Field planning, resource identification/allocation, man-hour estimates and equipment hour estimates.
* Developed, and evaluated schedules for milestones, trends and problems and suggested corrective actions.
PNOC ¡V ENERGY DEVELOPMENT CORP. CIVIL SUPERVISOR
Tongonan, Ormoc City, Philippines May 1996 to November 1996
* Repaired damage to miscellaneous foundations, access roads, pipe supports and staff housing.
TIERRA INTERNATIONAL CONSTRUCTION (TIC) CIVIL/STRUCTURAL ENGINEER
Upper Mahiao Geothermal Power Plant (128 MW). July 1995 to March 1996
Tongonan, Ormoc City, Philippines
* Performed evaluations, construction drawing checks and prepared material lists for each structure.
* Structure analysis, preparation of sketches and proposals for client approval.
* Coordinated with the site engineer/ supervisor during execution until completion of the project.
* Prepared field designs in accordance with project agreements.
* Implemented project construction quality control requirements.
* Prepared deviation reports to document and control nonconforming conditions as required.
* Implemented design document distribution and control for the project.
* Prepared field material requisitions for permanent plant materials as required.
* Performed system/area turnovers including as-built documents and inspection.
SUPERMAX ENGINEERING ENT. CO. LTD. (SEECL) CIVIL SUPERVISOR
Pushin Brewery Plant Project February 1994 to May 1995
Taoyuan,Taiwan R. O. C
* Construction of a wastewater treatment plant and a packaging building. Supervision and monitoring subcontractor's daily work activities, quality and schedule within the Project guidelines.
* Preparation of daily and weekly progress reports, field mismatch reports, inspection Reports. Coordinate final structure inspections and punch list completion.
* Prepared material, tool and equipment requisitions to suit project requirements.
* Coordinated with subcontractors, anticipating problems and solutions to support construction activities.
* Supervised design of temporary construction facilities. Assured proper warehousing was in place.
* Reviewed specifications, purchase orders, subcontracts, inspection reports, delivery schedules, instruction manuals and technical data to assist and advise management.
* Reviewed, analyzed, supervised or prepared construction estimates, cost studies, schedules and budgets.
* Assisted procurement in inspection and acceptance of field materials against project specifications.
* Developed punch lists and administered the clearance of punch list items.
MANSTEEL INTERNATIONAL CONSTRUCTION (MIC) Civil / Structural Supervisor
Disteleria Bago Incorporated La Tondena Distillery March 1992 to December 1993
Bago City, Negros Occidental, Philippines
.
* The Project included the fabrication and installation of four unit 36-meter diameter, 10,000 metric tones tanks and associated with civil, buildings and piping.
* Responsible for construction of the expansion facilities. Prepared weekly plans, schedules and progress reports. Conducted weekly progress status meetings and coordinated inspections and punch list completion. Prepared documentation required for project turnover.
MILITANTE CONSTRUCTION (MILCON) PROJECT ENGINNER
Building Construction Project, Cebu City, Philippines August 1989 to June 1991
Responsibilities included construction of a ten story residential/commercial building, steel structure warehouse, hotel bank building and a five million peso sport complex. Prepared field estimates, material requisitions, equipment requirements, tool requisitions and schedules for project execution. Prepared daily work schedules, progress reports and conducted Safety meetings
CABEA CONSTRUCTION & DEVELOPMENT CORP. PROJECT ENGINEER
Isabel Leyte, Philippines May 1988 to July 1989
Executed a ten (10) kilometer concrete road project. Prepared progress and field-testing reports. Responsible for a laboratory building renovation and access road. Procured materials, equipment and tools for the project.
PRIVATE CONSULTANT PROJECT ENGINEER
Libas, Merida, Leyte, Philippines February 1987 to March 1988
Contracted to design and construct a one unit residential building (PHP 1,685,000). Create plans, design, specifications, Bill of materials, schedules, cost estimates and building permit. Supervise Contractors.
MANCAO CONSTRUCTION CE AIDE / DRAFTSMAN
Pasar, Isabel Leyte, Philippines July 1986 to January 1987
Prepare field material take-offs. Create drawings, sketches and revisions for site implementation. Coordinate with Site Supervisor during Construction. Update daily work progress charts and manpower schedule.
PROFESSIONAL SKILLS
Ability to do Cost Control Works, Supervise and execute construction of the following structures: Residential & Commercial Buildings, Flood channel, pipe rack Foundation, pipe supports, box culverts, pipe sleepers equipment & tank foundations. Computer Aided design drafting works.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 651 to 700 of 1817)
Go to Search Parameters...
Brief Description
Curtain Wall Civil Structural Engineer Manager
Engineer with practical business, design and management experience in the areas of Civil and Geotechnical Engineering. Educated professional, committed to continuous improvement, ethics, teamwork and quality service. Detail oriented, excellent communicator, and capable of managing multiple projects
16 years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control s
Senior Project Coordination/Management Engineer-Oil Gas Petrochemical Energy & Infrastructure
Twenty+ years of Materials and Procurement Management experience including supervision and management of warehouse contractors, material control, procurement activities including vendor sourcing, requisitioning, procurement and expediting, warehousing including receiving and issuing.
Working towards CSO designation, WHMIS trainer, Aerial Work Platform trainer
.
Demonstrated expertise in the life cycle of software development. Proven success track in managing people, resources and processes within a worldwide organization while effectively building internal and external relationships. Have a credible track record in resolving customer-related issues
Experienced Civil Engineer Technician. Proven professional. Highly efficient, confident communicator with both clients and on-site staff. A team player, not easily flustered, who enjoys the challenge of on-site problems.
A versatile Civil Engineering and Engineering Project Management Masters Graduate with proven track record of management of complex engineering projects pursues a career in the Engineering Project Management field.
In-charge of setting-up document control center and formulating procedures for the project in EPC and project management as well.
GIS Manager/Technician
Project Manager, Business Development Manager Latin America
Experienced HSE Manger with a proven track record, Strong pro-active leader, empowering staff to take ownership
Safety Professional with over ten years experience in the EH&S field working on major construction projects, turnarounds, expansions, revamps, startup and commissioning and maintenance in the oil/gas, petrochemical, and power plant industry. Hold professional certification as a CHST.
SUMMARY · Bachelors Degree in Engineering Technology · 5 Years Commercial Project Management Experience · Previous to securing my degree I have 15 years experience in construction accounting and management.
My current contract –FCEO for United Nations (UNDOF Syria/Israel)- will be finished June 04. In the last fourteen months I could learn a lot about how to deal with the morals and costumes in Middle East, therefore my preference is an (construction) engineering/manager job in this area
Have working knowledge of all aspects and stages of a construction project. Know what it takes to meet safety demands, schedules, productivity, and quality. Bechtel trained and certified in many fields, for example, certified rigging and crane instructor.
Post Graduate in Advanced Construction Management from NICMAR, Hyderabad. 1 year of work experience,8 weeks of managerial summer internship in a construction firm. I can work on Primavera P3e/c and Expiditation.
A highly experienced Human Resources Practitioner with a comprehensive and strategic understanding of HRM, business and operational issues and organisational change. Able to devise and implement coherent HR strategies whilst improving internal processes and procedures within demanding environments,
26 years ; Contract Admin/Manager----Procurement
Experienced Construction and Engineering Management Professional in commercial and residential projects including site development
Over 25 years of progressive mining industry experience with significant achievements in management of mine development, engineering and operations. Proven track record of delivering results and affecting change.
To obtain a challenging position in the field of civil engineering in a developing organization where my experience can be put to the best possible use and my potentials can be effectively tapped. A Position that gives me opportunities, apply my knowledge, skills and experience in addition to hard w
20+ years of international experience in the study, process design, engg., procurement & project management & operations. Having led multifunctional teams for EPCM for hydrometallurgical( Leaching, SX-EW), benificaition & pyro( Smelter & Electro refining) for copper, Cobalt, zinc and lead metals.
Discovered 2 World Class & 2 Medium Size ore deposits - base and precious metals, gold, platinum, iron, open pit, under developed contries, Spanish, Portuguese, English, reg mining engineer & geologist USA & Brazil, Central & South America, Africa, Amazon, excellent Vice President, General Manager
Masters in Construction Management candidate.Worked in different positions such as junior field engineer, project controls coordinator, project engineer, supervisor, scheduler and quality checking for final deliveries. Strong working knowledge of Microsoft Word, Excel, PowerPoint, Access, Primavera
Respected Sir/Madam, I have around two years of experience in construction from design phase to the project closeout with client interface.
IM Supervisor, DM Manager, Expediter, Technical Writing skills in authoring procedures, Business Development with Green conceptual ideas
Supervisor maintenance and of trades/millwright / mechanic/water/rail
A results-focused manager and leader who drives project teams to deliver outstanding results. Professional Engineer with 21 years of diverse experience in the hydrocarbon processing and minerals processing industries. Has exceptional experience on owner & EPCM teams.
17+ years Experience of Supply Chain (Materials Planning, Purchasing & Inventory Management). Track record in statistical base forecasting, scheduling, presentations, negotiations and software based Purchase & inventory control, warehousing management and team leadership. Highly organized, analytica
Financial Controller or Accountant
Automobile Engineer with more than 12 years expertise in Maintenance of HEMM, with MBA and MS(Software) qualifications
20+ years of experience working in Materials Management, Inventory Control, Materials Planning Scheduling & Logistics, in both home office and field site locations on the construction of large petrochemical plants, natural gas plants, electrical power plants, and mining facilities.
Skills include: mechanical maintenance management, process engineering, project management, documentation and training, planning, procurement and contract management, budgeting, and sales.
Experience: Contract Management: Lining up contacts, Qualification: M.Tech.
Qualify E&I Site Supervisor, QA/QC Inspector, Project Coordinator, Project/Electrical Engineer and as well as Construction Manager. Excellent Documentation Skill for Project Management.
Open Pit Slope Design, Tailings Dams, Plant Foundation Investigations, Earthworks
Civil Engineer / project manager
Stakeholders Mgt, Social Impact assesmment, Negotiation skill, Participatory devt Planning, Monitoring/Evaluation, Team Player (B.Sc. M.Sc, Ph.D)
Diploma in Mining Engg, AMIE Sec A&B in Mining Engg from IEI.
-Planning and scheduling using Primavera Project Planeer P3.1 &P6, Microsoft Project Professional / Structural Engineering Design Using Computer Softwares such as STAAD-PRO 2007, ETABS, SAP2000
Experience, professionalism, skills, physically fit, able to work long hours in tough environment and stressful conditions, availability for traveling abroad.
Project Management
Mining engineer and experienced manager with over 20 years of successful executive management, project development, engineering, construction and operations experience in the mining, tunneling, fossil power, rail and heavy construction sectors.
Procurement, Supply Chain and Contracts Professional
Seeking position as HSE/Training/Emergency Management for Petrochemicals or Refinery Operations
Construction Management professional with Heavy Industry ,Power, Energy, Mining sector experience
Transformational Human Resources Manager with strong business orientation and multi-site experience in a broad range of HR Generalist functions including recruiting, staffing, talent development, HRIS, organizational development, staff management, and many others.
1
2
3
4
5
6
7
8
9
10
11
12
13
[ 14 ]
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com