Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #86545
next resume »»
CONTACT INFORMATION:
View contact information...
Shaw Group/Stone & Webster Asia Inc. (SWAI), Hong Kong
Project Controls Manager/Client-China Light & Power~Exxon Mobil
Oct 2008 – Feb2009
Responsible for/Managing (around 8 SWAI Project Control personnel) in a EPCM role-Planning (Primavera P3), Cost Control/Forecasting, Contract Administration, Accounting departments for SWAI at Castle Peak Coal Fired Power Station (4x800mw supercritical coal plants)-scope of work included emission controls-FGDs (Flue Gas Desulphurization), SCR/BOFA (Selective Catalytic Reduction/Booster Over Fire Air) and other related work to make plants environmentally compliant by Feb 2011. Oversight, Due Diligence over EPC Contractors' Project Services function-by Streamlining EPC Scheduling (by assuring proper Planning, Reporting, Trending, Criticality), Cost Control, Contract Administration, Coordination-SWAI/Contractors
-and assuring Tools/Processes/Procedures are in place to optimize Project Controls efforts.
Siemens Energy Inc., Orlando, Florida, USA
Planning/Scheduling Engineer/Client-GenPower LLC (Massachusetts)
June 2008 – Sep 2008
Planning/Scheduling for Commissioning a 695 megawatt supercritical coal plant in Maidsville, West Virginia- meetings with Vendors~ collection/entry into P3 of scope/sequence of commissioning activities from Vendors and Siemens, aiding in Integrating commissioning schedule with Master Schedule.
KJO (Kuwait Joint Operations-Saudi Aramco/Kuwait Oil Company), Cairo, Egypt
Project Controls Specialist/Business Administrator (Key KJO Team Member)
Oct 2007 – Dec 2007
Responsible for/Managing (around 10 KJO personnel) in a PMC role-Planning (Primavera P6), Cost Control/Forecasting, Contract Administration, Procurement, Document Control (Primavera Contract Manager/Expedition) departments for KJO at main Contractor's Offices in Cairo for US$772 Million Al- Khafji (Saudi Arabia/Kuwait partitioned zone) Offshore project. Oversight, Due Diligence over Contractor Project Services function, Business Administration for KJO-by Streamlining EPC Scheduling (by assuring proper Planning, Reporting, Trending, Criticality), Cost Control, Procurement, Contract Administration, Document Control (initiated reduction of duplicate/superfluous paperwork by 30%); Coordination with Engineering & Procurement (ENPPI) and Fabrication/Installation Contractors, KJO Site Installation Team.
Alstom Power, Zurich (Baden), Switzerland
Senior Project Planning Engineer (Lower Level Executive MK03)
May 2007 – Sep 2007
Strategic Planning/Scheduling, Project Controls, Monitoring, Forecasting, Trending, Reports, Client Coordination (P3-Ver. 3.1, P3e/c-Ver. 5.0; Alstom's EPC Tool Set, Progress Supporter, MS Office)- Combined Cycle Projects (particularly Staythorpe UK Power Project-containing Alstom's GT26 Combustion Turbine machines)-on International Ventures with a US$ value of circa 1.7 Billion.
Riley/Babcock Power, Charlotte, North Carolina, USA
Manager, Project Controls
December 2006 – May 2007
Guided, Mentored and Supervised Project Controls Personnel working on Power Plant Betterment/Environmental Modification Projects (FGDs, SCRs) out of Riley/Babcock Power's Charlotte, NC, USA office. Also, hands-on Strategic Planning & Scheduling/Monitoring on an Earned Value basis (P3-Ver. 3.1), Cost Forecasting/Financial Control (Deltek's Costpoint software), Reporting/Trends, Risk Management, Contract Administration, Client Coordination.
Siemens Power Generation, Orlando, FL, USA
Part Time Project Controls Consultant/Self Employed
September 2005 – November 2006
Responsibilities included Analysis of Delays postponing completion of project according to Baseline Program for the Kirkuk Iraq Projects (Simple Cycle Project - Siemens V64/V94 machines); including Schedule Analysis, Resources & Equipment/Material Usage/Forecast review, Subcontractor Execution & Implementation Plan examination, aiding in the Financial/Commercial Impact studies and preparation of relevant Reports to be used as a basis for Claims Presentations (Client – US Aid/Bechtel International). Self Employed – Day Time Internet Stock /Currency Investment Trader for Personal Income/Earnings enhancement.
Senior Project Controls Engineer (Project Controls Manager)
January 2000 – September 2005
Developed summary & detailed EPC/Eqpt.Supply schedules for Simple & Combined Cycle Power Plants upto 600 MW (Including Industrial Steel/Concrete Structures-Generation/Control Room Buildings & Field Erected Tanks), maintained/monitored schedules, aided in selecting General Contractors' Lead Project Controls Representative and continuously guided/mentored General Contractors' Project Control function, reviewed/assured adherence to commercial, financial and technical aspects of LSTK/T&M Contracts by Clients/Consultants/Contractors/Vendors, provided corrective action/recommendations & developed/monitored cost/schedule forecasts & variances for Domestic/Int'l projects (P3-3.1, Primavera Enterprise 5.0 for Power/Process and E/C, MS Office, Lotus Notes, SAP R/3 4.6-Finance Module). Was Presented several Performance Awards and Citations.
Black & Veatch/Black & Veatch Pritchard, Overland Park, Kansas, U.S.A.
Senior Planning/Scheduling Engineer
March 1996 - December 1999
Developed summary EPC & Start-up/Commissioning Power Plant schedules for various technologies at domestic/international locations (Including Industrial Steel/Concrete Structures-Generation/Control Room Buildings & Field Erected Tanks), and specifically developed, maintained & monitored detailed EPC schedules for Pulverized Coal, Simple & Combined Cycle Power Plant projects (upto 600MW) & SCR Modifications in Indonesia, Pakistan, Korea & the USA (P3 2.0b & 3.0, B&V's Powertrak Scheduling System, Lotus 1-2-3, MS Office). Was Presented Performance Certificate. Tenure included working @ Black & Veatch/ Pritchard as a Sr. Project Controls Engineer on major Petrochem/Oil & Gas Projects-including "Coke Gasification to Ammonia" and LNG Plants-domestic/overseas.
Gulf Consolidated Contractors, Doha, Qatar
Project Services Supervisor (Project Controls/Quantity Surveying)
May 1994 - May 1995
Prepared and monitored computerized schedules (Primavera Project Planner-P3, Lotus 1-2-3, Microsoft Office) for construction control of LNG (Liquefied Natural Gas) infrastructure development project for Qatar Petroleum (QP) at $5 billion LNG plant at Ras Laffan. Attend progress review meeting, formulate weekly progress reports, prepare interim valuations for ongoing projects, tenders for submission to prospective clients, and follow up post-tender enquiries and submittals; supervised Project Services function.
Humphreys & Glasgow, Bombay, India
(Subsidiary - Jacobs Engineering - USA; Affiliate - Humphreys & Glasgow, UK)
Principal Planning Engineer
November 1993-December 1993
Produced feasible Project Programs - Engineering and Construction - using precedence network techniques with specific regard to contractual requirements, milestones, time and resource limited scheduling and carried out performance monitoring for this DEG (Diethylene Glycol) to TEG (Triethylene Glycol) conversion construction project costing $50 million using P3.
Independent Project Controls Consultant/Contractor, Bombay, India
January 1992-October 1993
Worked as Independent Project Controls Consultant/Contractor – providing services to Manufacturing/Industrial/Commercial facilities' EPC Firms, General Contractors, Owners (Turnkey Projects ranging from $5 Million~$50 Million)-individually handling planning/scheduling, estimating, quantity surveying and commercial/cost control.
Saline Water Conversion Corporation (SWCC)
Al Jubail Power/Desalination Plant, Jubail, Saudi Arabia
Planning Engineer (Area Planning - Scheduling Engineer/Acting Superintendent)
March 1988 to October 1991
As Area Planning Engineer mainly accountable for comprehensive co-ordination of major overhauls and plant betterment outage inspections of boilers/turbines/desalination units and auxiliaries (Including Industrial Steel/Concrete Structures-Generation/Control Room Buildings & Field Erected Tanks) - Phase 1 Operations - 6 x 60 mw oil/gas fired steam turbines, 2 x 30 mw gas turbines & 5400 cubic meters per hour water production (MSF). Identification organization, computerization of work scope & schedules to meet time/manpower restraints on overhauls (Primavera, Visischedule, Lotus, dBase IV).
Supervising & guiding 1 foreman/2 planners in cost engineering and planning, scheduling, coordinating corrective, preventive and modification maintenance activities for assigned areas - Ph.1 Power/desal plant & associated auxiliaries.
As Acting Planning Superintendent (2 mths. of tenure) developed site wide Plant Outage Program (for the period June '89 - May '93), for 10 x 120 mw, 42,000 cub. mt. / hr (Phase 2 units) & 6 x 60 mw, 5400 c.m./hr (Phase 1 units) - fossil fired/MSF - a long range turnaround/overhaul/outage and cost control plan for power/ desal units classifying critical activities to bring outage inspection program on track. In the same capacity served as Plant Insurance/Claims Administrator, addressed work areas causing departmental conflict and focused management's attention on crucial issues thus aiding in productivity improvement/budget savings. Supervised 15 planning personnel.
Public Service Company of Colorado/Xcel Energy
Fort St. Vrain Power Plant, Platteville (Denver), Colorado, U.S.A.
Scheduling Engineer (Nuclear Production Dept. - "NPD" - Preventive Maintenance Coordinator/Environmental Qualification - "EQ" - Scheduler)
December 1985 to December 1987
As NPD Preventive Maintenance Coordinator (12/85 to 12/86) was responsible for complete coordination, administration, and implementation of a plant wide preventive maintenance program which maintained qualification of equipment per NRC (Nuclear Regulatory Commission) guidelines. Wrote and implemented NPD procedure "Preventive Maintenance Planning/Scheduling Implementation" at this $300 million/330 mw HTGR (high temperature gas reactor). Activities centered on developing maintenance data base on PPMIS (Power Plant Maintenance Information System - IBM 8100 mainframe) and scheduling/monitoring activities on PREMIS PMS.
As EQ Scheduler/Overseer (12/86 to 12/87) developed/scheduled engineering work packages (manual/PREMIS) for deficiency correction on environmentally unqualified equipment per NRC guidelines & coordinated (on shift/2 other supervisors) planning, engineering, contractor manpower & quality control efforts toward scope completion.
Stone & Webster Engineering Corp., Boston, Massachusetts, U.S.A.
Beaver Valley Power Station # 2, Shippingport, Pennsylvania
Field Planning Engineer (Area Planning-Scheduling Engineer/Milestone Cost-Scheduling Engineer)
December 1981 to October 1985
As Area Planning/Scheduling Engineer (12/81 to 12/82 & 12/84 to 10/85) responsible for Construction Planning/Scheduling of piping- mechanical, civil, electrical, insulation, instrumentation activities for assigned areas - Service/Control/Turbine buildings, using S&W's PMS-4/CMS scheduling-monitoring information systems at this $3 billion /880 mw PWR (Pressurized Water Reactor) nuclear power plant. Other activities included Level III contractor schedule validation, critical path analysis and bulk commodity installation monitoring. In the capacity of Milestone Cost/Scheduling Engineer (12/82 to 12/84) prepared studies (CPM schedules/ reports) relative to specific detail design, construction, procurement and startup which directed the completion of commodity installation to support system turnover, testing and milestone acceptance.
Davy Powergas, Bombay, India
(Subsidiary - Davy International, UK now Kvaerner John Brown E & C, U.S.A.)
Site Supervisory Engineer
August 1977 to August 1978
Major duties involved preparing/updating project schedules, developing quantities/costs and ensuring their accuracy with project documentation. Periodically monitored and analyzed costs/variances and provided corrective action. Expedited delivery of equipment and material from vendor through installation and aided in engineering - construction coordination efforts at this $50 million polystyrene manufacturing construction project. Aided in the design of Industrial Steel Buildings (with paneling) for this project before taking the project to the field and coordinating their erection.
EDUCATION/ M.B.A., Management, August 1981
TRAINING Southern Illinois University, Carbondale, Illinois, USA
(Graduate Assistant, School of Physics & Engineering)
B.S. Civil Engineering, April 1977
Indian Institute of Technology (I.I.T.), Kharagpur, India
I.S.C.E. (High School Cert-sponsored by Cambridge Univ., England), April 1969
St. Mary's High School, Mumbai (Bombay), India
Professional Training
Construction Project Simulation Workshop & Construction Management
Systems (CMS) -- Stone & Webster Eng. Corp.
PREMIS -- Project Management/Scheduling System -- Public Service Company of Co.
QRS --Maintenance Planning & Database System -- Saline Water Conversion Corporation
PRIMAVERA PROJECT PLANNER / PRIMAVISION -- Certified -- Evans Tech. Inc.
Several Training Certificates/Courses taken at Black & Veatch, Siemens Westinghouse (among others) in Project Controls,
Project Management, Business Process Management, Contracts Administration, HSE, Operations & Maintenance.
Evaluated/Provided Recommendations for P3e-Primavera Enterprise Program-@ Siemens Westinghouse. Sr. Project Controls Engineer on "High Desert" & "Silverhawk" (@ Siemens Westinghouse)-Power Magazine's "Power Plants of the Year-2003/2004".
.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 451 to 500 of 1811)
Go to Search Parameters...
Brief Description
Major skills are in construction and people management
Free!
HSE Manager - Value Assurance Manager - Asset Integrity Manager
Senior level position with EPC company executing large scale infrastructure and industrial projects, where a strong background in contracts, project controls, engineering, and effective communication skills, and a complete knowledge of project management can be used to improve project
I have 34 years experience in my trade. I completed Ordinance Maintenance Course, Advanced Maintenance Course, Advanced Diesel Course, then went on to teach Advanced Diesel Courses while I was in the military.
Seeking a position where I can apply technical and management skills in a dynamic environment and continually face new challenges.
Project Management / Construction Management / EPC / EPCM / PMC
Energy (coal/gas/nuclear) -- ISO 9001 -- ISO 14001 -- Published -- International
Experienced health and Safety professional, excellent Computer Skill, knowledge of H&S MS (OHSAS 18001); EMS (ISO 14001) and QMS (ISO 9000:2000; Qualified Auditor, Training Instructor.
I have served 20+ years in the Marine Corps and possess great Manager skills. I have an active Top Secret/SCI Clearance. Security+ certification (Network Security). I am looking to make a difference in the Civil sector as I have in the military.
More than 30 years experience as a Contract Engineer, Contract Administrator and Quantity Surveyor, including expertise in Project and Construction Management; working with Oil Companies, E.P.C. Contractors and Consultants on a variety of Oil & Gas, Petrochemical, Building, Civil and Power project
Experience in Project Management and Marine Construction
Planning, Scheduling, Project Controls
Drafter, Designer, AutoCAD, Revit, CADD Manager, VB, VBA, AutoLisp, Access database, MS Office
B.Tech., Diploma., Civil engineering
Construction Manager with 22-years experience in Mechanical Construction discipline for Industrial Projects (Oil & Gas, Refineries, Petrochemical Project and Power Plant Projects).
MAINTENENCES MANAGEMENT OF HEAVY EARTH MOVING AND CONSTRUTION EQUIPMENT
I have been involved in Health, Safety and Environment in excess of 25 years and I am an experienced and qualified Health and Safety Professional in a Construction, Oil /Gas, Drilling Off-shore and On, Aviation and Petrochemical environment. This has enabled me to undertake the following:
3D Modeling, FEA, ANSYS, GTSTRUDL, STAAD, RAM, RISA, CAESAR II. USA, British, Euro, China, Russia Codes and Industries Standards.
16 years experience in construction Health, Safety and Environmental. OSHA 500 & 501, B-SAF (Behavioral Safety Audit Formula) developer. International experience. Active passport.
Almost 10 years of active experience in Coordinating Occupational Health, Safety and Environment activities
Cost/Budget Controls Manager
Summary of Relevant Experience: Management career is based on sixteen (16) years experience developed while in long term service with world class engineering and construction organizations.
OBJECTIVE To obtain a position with a progressive construction / development firm in which I will utilize my construction management and business skills
Prepared weekly and monthly schedules and cost reports preparation and submission to Client and in house management• Monitored of the cost & Progress on weekly basis. Invoiced to Client on monthly basis for the project.
Responsible for Civil / Structural works of assigned Projects for both Oil & Gas Industry and Commercial/Residential or Mixed Used Projects.
Degree Bachelor of Science in Mechanical Engineering
Information Technology Vicepresident / Manager / Director / Project Manager
Civil engineering experience. Highly qualified in troubleshooting and problem solving skills in the field of construction and management
I have 29 years of management and engineering experience. Excellent references available.
CAD and IT Administration and Development
Construction Civil Superintendent (Earthworks, Infrastructure and Concrete)
position as an MEP Design management, Sustainable Design, LEED Facilitation, Building Commissioning, and Building Energy Modeling for High Performance Buildings.
30 years experience in civil and horizontal projects
PMP Certified Civil Engineer with MBA(Marketing & Systems) with about 7 years experience in the Middle east
Business oriented leader with a strong commitment to results and service. Significant experience in operations, logistics and supply chain management of complex, evolving organizations.
Construction Engineer
10 years in executive management and marketing and sales in numerous engineering and construction environments.
Extensive experience in finance and accounting, project cost and business office administration in start up companies in the petroleum, construction and heavy lift industries.
HSE Manger
20 years experience in accounts & administration with reputed organisations like Trading, FMCG, Manufacturing, Oil Industry
I am presently working as Manager (Mechanical) with Engineers India Limited an ISO 9001 CONSULTANCY ENTERPRISE of Govenment of India & supervising on behalf of owner all piping and equipments installations in PTA - project of Indian Oil Corporation at Panipat Haryana India.
NCCER certified construction site safety technician; 5-8 yrs experience; bilingual
Former GS 15, U.S. Government Contract Officer (KO) & Administrative Contract Officer (ACO)¡Xcurrent Senior Level Professional seeking a Project/Program Management and or Business Development opportunity
Mechanical Engineer - 20+ years maintenance experience in mining - both Underground & O/Cut. Also Processing Plant maintenance & Project Management on new Greenfields plants.
Seventeen years experience in electrical engineering design, construction supervision, commissioning & start-up for major international EPC and Consulting firms specialized in power generation, T & D grids, oil and gas petrochemical fields
Project Controller with extensive experience of implementation and operation of project management systems. Detailed knowledge of C/SCSC & EVM systems. Experience in Petro-Chem, Oil & Gas downstream distribution, Rail, Defence and Civil Engineering sectors. Extensive procurement experience.
25+ yrs progressive exp. as a Sr. Supervisory Planning/Scheduling & Project Control Engr/Mngr with Risk/Contracts Exp, Int'l w/Utilities, EPC Firms/Consultants, Turnkey OEMs and Constructors within the Energy Sector. P3 Ver.3.1, Primavera P3e/cVer.5, 6.2,Pertmaster, Claim Digger, MS Office, Acrobat
Fifty Years Total Experience in process engineering and technology development. Including More Than Twenty Years Process Engineering Experience on petroleum refinery, oil & gas production and petrochemical projects. Experience includes process simulation software Hysys/Pro II/Dynsim/Aspen.
First Class Professional experienced as Project Engineer/Project /Contracts Manager for more than 30 years in around the globe. A self-starter, motivated individual with well-rounded Project Management training in Man,Material & Money Management
multi skilled engineer
1
2
3
4
5
6
7
8
9
[ 10 ]
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com