Twenty-five years in Oil/ Gas and Power Generation project management and engineering.
Areas include Project Controls (planning, scheduling, cost tracking) and Field Supervision for EPC turnkey projects, plant modifications and outages. Experience is multi-project, union and open shop, foreign and domestic, with budgets to $850MM. Recent projects have been in Offshore Development, Gas Pipeline and Fossil Power. Software includes Primavera P3, P6, Artemis Project View, Pro-Log, FDCost, Milemarker, SAP, Monte Carlo and MS Office.
------------
WORK EXPERIENCE:
------------
Jan 09-Sep 09; Total Oil, Lagos, Nigeria Project Controls Mgr thru Dover Engr of Port Harcourt for Initial Engineering and scope allocation for the EGINA Field FPSO FEED (300,000 man-hours) then PCM for all Sub-sea scope. Developed the estimate and budget for 59,000 man-hours and associated costs to produce 310 Sub-sea FEED deliverables. This included extensive Nigerian content requirements. Generated spreadsheets and the Primavera network to baseline, track and forecast hours, costs, physical progress and earned value. Implemented and managed the processes to produce weekly and monthly reports while interfacing with sister and client engineering efforts.
Oct 07-Jan 09: Chevron, Accra, Ghana (contract) Project Controls Mgr for the West African Gas Pipeline.
$850MM. The project has seven partners with six sites in four countries; 600km offshore, 55km onshore, compressor station and 5 terminals. Subs were T&M and Lump Sum, 6 currencies. Developed, implemented and managed the programs and processes for scheduling, cost control and physical installation measurement. Captured and reported costs, quantities, productivity, earned value and schedule performance data. Assessed variance from forecast and budget. Identified areas of risk, tracked changes and developed recovery efforts to meet targets. P3, P6
Jul 04-Oct 07: Shaw-Stone/Webster, Trenton, N.J.(contract) Project Controls Mgr for the development of estimate, budget, schedule, performance metrics and contracting strategy for a $470MM FGD/ESP air quality project at a three unit PP&L fossil site. Construction started May 06. July 04 to Sept 05 PCM on a $550MM, 500MW Combined Cycle power project in Astoria, N.Y. Directed in-house and subcontractor planning, scheduling and progress reporting. Tracked costs and identified variances and trends. Used P3 Sub-Project restoration for statusing.
Jun 03 – Jul 04: Washington Group Int'l (contract) Scheduling and Controls Lead for Steam Generator and Reactor Head replacement at Oconee Units 1&2 and Prairie Island Nuclear Power Stations. Planned, scheduled, integrated and tracked networks of 3500+ activities each. Managed implementation of project controls systems and processes for major component replacement. Outages averaged 74 days breaker to breaker. P3e, Artemis PV
Apr 02-Jun 03: Reliant Energy, Hunterstown, PA (contract) Project Controls Manager for a $510MM EPC combined cycle power station, 2.6MM man-hours, 800MW. Managed cost, schedule and performance tracking and reporting. Progress, milestones, systems turnover, quantities/rates, change orders, costs, cash flow, invoices, variances, forecasts, impact analysis and recovery efforts were primary areas of responsibility. P3
Mar 01-Apr 02: Duke-Fluor Daniel, Beverly. OH (contract) Controls Team Lead on a 620MW combined cycle EPC power station project, $370MM. Provided cost tracking, planning/scheduling, progress and performance metrics, and change management supervision. Conducted weekly site reviews and coordinated monthly project reports; client and internal. Assessed budget and schedule deviations while directing efforts toward milestone achievement. P3, FD Cost
May 00-Mar 01: General Electric, Joliet, IL (contract) Site Manager, five unit simple cycle GE 7FA's. Site installation budget $78MM. Primary responsibilities were oversight of the prime contractors (civil and balance of scope) while monitoring and coordinating interdepartmental functions, targeting efforts for budget/schedule achievement and providing site support needs. Job scope also included emergent issue resolution, addressing client concerns, invoice review, local staffing and sourcing, as well as home office liaison and reporting.
Mar 99-Apr 00: Consumers Energy, Bay City, MI (contract) Construction Manager, D E Karn fossil station dual fuel low NOx conversions. Work was in-plant on two of four 650mw units with outages required. Included gas supply piping, burner replacement, two aux boiler rebuilds and cooling tower reconfiguration. $46MM.
Aug 98-Mar 99:D C Cook Nuclear Station, Bridgeman, MI (contract) Lead Scheduler in Work Control for a two unit restart program. Produced daily production schedules and lookaheads. Responsible for core offload and core safety train fragnets. Developed level II logic for system work windows and steam generator replacement. P/2
May 98-Aug 98:Texaco, Longbeach, CA (contract) Construction Manager, nightshift, refinery modifications and refit during turnaround. In-plant work, operating facility. 280,000 man hours, $34MM.
Mar 93-Jun 95:Arco Chemical, Freeport, TX (contract) Site Manager for tanker offloading, pumping and storage facilities. $46MM. The project included three berth tanker docking, and three salt dome storage wells with brine reservoirs. Coordinated subcontractors, engineering, QC, project controls, services, facilities etc.
Oct 91-Feb 93:River Bend Station, St. Francisville, LA (contract) Outage Scheduler. Planned, scheduled, loaded and tracked assigned systems, equipment and tests during refueling. Included were ILRT, MOV signatures, DG rework and 14 systems. Revised the network to accommodate emergent work, scope changes and various constraints.
Nov 90-Jun 91:Trojan Nuclear Plant, Rainier, OR (contract). Construction Manager for plant mods during outage. Pre-outage prep including engineering, procedure approval, material procurement and staging, was required for projects in the 1000-25000 man-hour range.
Jan 90-Nov 90:Calvert Cliffs Nuclear Plant, Lusby, MD (contract) Construction Engineer, independent dry fuel storage facility, new construction, $40M. Included cask handling equipment, barge dock alteration, dredging, and transporter access. Security considerations were extensive.
Dec 88-Jan 90:FP&L Port Everglades, Ft Lauderdale, FL (contract) Outage Coordinator. Scope of responsibility included pre-outage prep, overhaul execution and restart for both contract and in-house efforts, 2 units. Coordination of craft with engineering, materials, specialty services, QA/QC, safety and cost were core requirements.
June 87-Dec 88:General Electric, Bayonne, NJ (contract) Construction Manager, four unit turnkey co-generation power project. Coordinated contractors, vendors, and specialty services with deliveries, commissioning and other constraints. Resolved interferences, conflicts and priority issues.
July 85-Mar 87:Virginia Power, Chester, VA (contract) Outage Coordinator. Assignment consisted of pre-outage preparation through shutdown and startup. Typical concerns: Need/priority evaluation, in-house vs. contract analysis, scope control, procurement, contract admin, craft allocation, work around resolution and cost/schedule impact.
July 82-May 85:Westinghouse Gas Turbine Division, Concordville, PA Construction Manager at two sites in Saudi Arabia and one in Mexico. Issues included area, discipline and system oversight, force allocation, materials, turnovers, local procurement, commissioning to operations transition and owner's engineer relations. Configurations were both simple and combined cycle. Saudi, Ha'il $380M, Saudi, Quaseem $170M, Tula, Mexico $18M.
Nov 80-Apr 82:Westinghouse Nuclear, Angra, Brazil Start-up Support Mgr. Coordinated the materials, equipment and craft for start-up on an 850MW nuclear plant from hot functional thru commercial op.
Apr 78-May 80:Aramco,Dhahran, Saudi Arabia Construction Manager for the Abu Ali water injection and desalting project. Interfaced production and engineering with the construction effort. Directed sub-contractors and force account work. Implemented change orders, approved draws, assured timely procurement and delivery.
EDUCATION & CERTIFICATION:
------------
B.S. Civil Engr.
Los Angeles Univ. April 1978
Courses inn Piping Design, I&C,
P.E. Prep (Mech), Radiology and various programs and systems.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 601 to 650 of 1817)
Go to Search Parameters...
Brief Description
I am lead piping engineer ,supervised 6 engineer ,6 autocad drafter and 7 PDMS staff.I am familiar with all international stds related to oil&gas ,petroleum and power plant.
17 years of legal work experience as DA, Chief Judge, Legal Advisor and part time professor
HSE Manager in major energy, power generation, oil and gas sectors covering technical and commercial requirements. With professional experience in directing and mananing health, safety and the environment protection & sustainability development aspects as per OSHA framwork and guidelines. Strong abi
18 Years including 10 years in oil & Gas - Construction experienced Safety Specialist , having Mechanical engineering Degree from Bangalore University and Diploma in Industrial Safety From RLI Chennai, India & OSHA 30 Hours Trained - Key skills : Construction Safety Mangement, Auditing, Trainer
Senior Primavera 6.2 Planner / Scheduler or Management Skills
Highly skilled graduate Project Manager/Civil Engineer and Project Controls Lead with more than 25 years related domestic and international experience in project and construction management.
NDT Resume
PLANNING/SCHEDULING ENGINEER & BACHELOR OF ENGINEERING (CIVIL)
A multi-skilled mechanical/piping, Construction Superintendent/manager, QA/QC Engineer, with over 20 years international experience in the oil, gas, petro-chemical and power generation industries
It is with great interest that I am forwarding my resume for your consideration. My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
•Over 9 years experience preparing detailed estimates for Capital Projects involving all engineering disciplines including process design, civil, structural, mechanical, piping, electrical, instrumentation, and process control for Mining and Heavy industrial Projects.
Sr. Piping Design, Lead Des, ACAD 3D, Microstation 3D
Strategic marketing, business development and executive search professional with strong record of implementing sales and strategic plans that support corporate and financial goals. An effective executive search director & professional.
* Exceptionally qualified Professional with more than twenty years of experience as a Field Engineer in the industrial and power industry
Accomplished technical and managerial career qualified by 24 years of measurable achievements in the construction and mining industries. Highly skilled in identifying, evaluating and negotiating joint venture and other international business opportunities with government officials, the private sect
Project engineering/managment
Mechanical?Electrical Engineer,Steel Expert,Steel Plant operation Incharge Marketing & Sales Incharge ,QMS,EMS.OHSAS Regd Lead Auditor,MBA9Business Admin.Professional Doctorate in Environmental Management.,Handled Projects as well as Maintenance,Director,European Quality Body,Managing Directoer Asia
Senior Mechanical / Piping Engineer
Project Engineer, Assistant Project Manager, Architect, LEED AP, BIM
Experienced Contracts Manager professional with CLA credential, MBA (December 2009) and proven track record with more than 15 years of business expertise in financial analysis, logistics, engineering, FAR knowledge, strong legal background, and project management.
A self-motivated, highly disciplined and hard working graduate electrical engineer with over 26 years of extensive experience in various disciplines such as Specifications, Tendering, Design & Engineering, Construction, Project Management and O & M.
Free ! YOUNG POTENTIAL in FINANCE & ADMINISTRATION
To meet the needs of your company by incorporating project management, estimating, and scheduling experience, with a diverse project background.
Construction Manager Ranging from Field Design, Construction Management, Engineering and Project Engineering Management of Contractors and Inspection. Results-orientated with an ability to stimulate work, reduce costs and
I have US and overseas QA/QC project supervisory experience in the construction, petroleum, mining, and aerospace industries. I am a CWI, Level II in MT, UT, PT and RT film interpretation. Past project duties and responsibilities have included review of purchase orders and exceptions,
Engineer with Business management,
I have more than fifteen years of progressive professional experience and have matured from a background in material / inventory control, coordination, and warehousing techniques for oil and gas maintenance, construction and manufacturing industries.
Over 18 years of extensive experience Maintaining a Safe Work Culture, Budgeting, Strategic planning, Policy Development/Implementation, Finance/Leasing, Fleet Maintenance/Management
Experienced Supply Chain Manager
Action oriented, contracts-project manager
Estimator, Project Manager, Project Engineer, Construction Administrator, Architectural Designer, CAD
Free!
Oil & Gas Finance, Commercial Manager. 30+ years industry and 20+ years international experience.
Has 15 years of top, diversified logistics/operations management experience.
Over thirty years engineering, construction, remediation, operations, start-up, and manufacturing experience includes: project management; project planning, sched¬uling and analysis; cost engineering; cost, schedule, and earned value analysis and reporting; WBS, OBS development; EAC, SPSPI and CPI
Radiation Safety Officer, Certified Health Physicist, Environmental Manager
as below
Vast Experience in Business Development, Administration and Management, Business correspondence.
Construction Project Manager Restaurant (Swiss, 39, Trilingual E/F/G) is looking for a new international career opportunity. 10 years experience in construction project management (McDonald's restaurants and General Contractor). Willing to re-locate in the US/Australia/NZ/Canada.
QA/QC, CERTIFICATION, TURNOVER
Experienced Buyer/Purchaser, very versatile background from different countries and industries.
Interior fitouts Project Manager - expertise in Site execution, Management, Planning , Procurement, Coordination between Services. A Go-Getter and Self-Motivated Engineering Professional.
19 years of experience as a Camp / Accommodation-Facilities Management (Staff Welfare Operation and Maintenance) in Oil & Gas, EPCC, Company (Road & Bridge, Electro-Mechanical Contractor.
I am a master electrician with 35 plus years in the management of large construction projects. I have over three years experience working in Iraq, working with many different cultures and in adverse conditions.
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
Senior Electrical, Energy Model, LEED, sustainable, Head, Manager, renewable, coordinator, building commercial, residential, healthcare, Education, industrial, parks, Hotels
Career Objective
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
Highly experienced Project Mgr in construction and environmental projects. Extensive experience in Federal & State projects, contaminated soils & groundwater, demolition. Hands on and takes ownership. Extensive experience in massive soil relocation and placement. Available for overseas projects.
Construction verification, Cost estimation for mechanical systems involving process piping, heavy civil structures, Plumbing, and fire protection. Project management with Profit-Loss responsibility, Project cost control, Project execution, project control & close out.
I am Danish construction engineer. I have worked as a construction manager for about 3 years. The projects have been large infrastructure projects, commercial, and industrial projects. I have experience in site management and project management,
1
2
3
4
5
6
7
8
9
10
11
12
[ 13 ]
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com