Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #9597 next resume »»
CONTACT INFORMATION:
View contact information...

INTRODUCTION
Electrical Engineer with (15) years of experience in multi national projects in India (4 years) and Middle East Power projects (11years) Construction and Project Management field especially in High Voltage Substations and Power Station environment
Brief Performance Appraisal
Substations / Power Station (SSD) Senior Project Engineer / Manager with 15 years experience coordinating all components and subsystems for turnkey High / Medium voltage substation orders. Performed all essential functions of Lead Project Engineer for multiple, concurrent small to large SSD project orders. Coordinated the engineering of all components and subsystems for turnkey high voltage substation orders, such as gas insulated substations, circuit breakers, disconnect switches, transformers, cables, control and protection systems, etc. Provided support during the manufacturing, installation and testing phases of a project order. Assured resolution of all customer & supplier technical requirements questions. Handled Contractual and commercial tasks related to Projects.
Supported the preparation of proposals for new orders by reviewing and commenting on customer technical specifications; preparing drawings, technical & purchase specifications, cost estimates, engineering time and manpower estimates. Conferred with the SSD Sales and major equipment manufacturers, other engineering personnel throughout project execution. Have supported company in formulating and implementing QA/QC procedures.

CAREER AIM
To become thorough project management professional for management of Complex Power
Projects
Presently Looking forward to an assignment in Project / Contract / Procurement / Tendering fields

SPECIALIZATION
Project / contract / Procurement management in HV transmission and distribution and power projects.

Sub-specialization
Electrical equipments installation and support to testing and commissioning activities.

EXPERIENCE with Transmission & Distribution Ltd
As Project Manager
(1) Project Repair & Rehabilitation of Power Transformers and associated Protection modification works, Abu Dhabi, United Arab Emirates
Duration: From Jan 2004
Project value 13 MUSD.
Owner / Engineer Abu Dhabi Water & Electricity Authority and PB Power
Project in detail Design, Engineering, Manufacture, Supply, install and testing/commissioning of 140MVA 220/33KV Transformers and 40 MVA 132/11KV Transformers in Abu Dhabi and Al Ain area. Involves removal of old transformers and replace with new transformers and transformer HV & LV protection equipments and Cabling along with Fire detection and fire fighting systems. Construction of new transformer bays and handling of local transportation and installation.

(2) Project: Addition of 132KV GIS Bus-coupler in to existing 132KV Substation and related control, protection works. Al Taweelah, United Arab Emirates
Duration: From February 2003 until March 2004
Project Value 2 MUSD
Owner / Engineer Al Taweelah Power Company / ESBI International

(3) Project Modifications in existing 132/11KV Substation (W24) – 11KV Switchgear up gradation and Ring Main Units and Cabling, Abu Dhabi, United Arab Emirates
Duration From March 2003 until April 2004
Project Value 1 MUSD
Owner / Engineer Abu Dhabi Water & Electricity Authority and PB Power
Project in detail Design, Engineering, Manufacture, Supply, install and testing / commissioning of 11KV Air insulated Switchgear mfg. by ABB Calor Emag Schaltanlagen AG. Supply and installation of 11KV RMU and 11KV Cabling.

(4) Project Extension of 33KV GIS Switchgear & 11KV AIS in Break Water Substation
Duration Feb 2002 until September 2002
Project Value 1.5 MUSD
Owner / Engineer Abu Dhabi Water & Electricity Authority and Mott Macdonald Ltd
Project in detail Design, Engineering, Manufacture, Supply, install and testing / commissioning of 33KV GIS (ZV2) extension, 33/11KV Power transformer, 11KV Air insulated Switchgear. Supply and installation of 11KV Cabling and associated control and protection works

(5) Project Design, Engineering, Manufacture, Supply, install and testing / commissioning of five nos. of 1500KVA Diesel Generator set with acoustic control.
Duration January 2003 until September 2004
Project Value 4 MUSD
Owner / Engineer Abu Dhabi Water & Electricity Authority / Mott Macdonald Ltd

(6) Project Extension of 33KV GIS (ZV2 to ZX2 with double bus bar) and related control, protection and monitoring systems
Duration January 2001 up to June 2003
Project Value 2 MUSD
Owner / Engineer Abu Dhabi Water & Electricity Authority and Ewbank Preece Ltd
Project in detail Extension of existing 33KV ZV2 GIS with ZX2 GIS and associated Control & Protection system and 33KV Power Cabling etc.

(7) Project Design, Engineering, Manufacture, Supply, install and testing / commissioning of 2 nos. of 33/11KV Package Substations with 33/11KV 15MVA Power transformers and 500KVA Station Auxiliary transformers
Duration Jan 2001 until March 2002
Project Value 1 MUSD
Owner Abu Dhabi Water & Electricity Authority

(8) Project 2 x 66/11KV GIS Substations for Aluminium Bahrain (ALBA) in Bahrain
Duration July 1999 until Dec 2000
Project Value 20 MUSD
Owner / Engineer Aluminium Bahrain (ALBA) / Ministry of Electricity & Water Authorities / Kennedy & Donkin Middle East Ltd., Dubai, Handled all site related activities as Site Manager / Project Engineer

(9) Projects Various. As Project Engineer supporting Project Manager and Contracts Manager for multiple 132/11KV Substation projects for Project / Contract Management and support to Tendering and Sales department
Duration February 1998 until June 1999

PREVIOUS EMPLOYMENT HISTORY (In UAE)
(1) Company CIMEL Abu Dhabi (George Forest International Group Company)
Duration From July 1995 up to January 1998
Designation Project Engineer
Projects handled 4 Nos. of Complete 33/11KV Primary Substation from start to completion responsible for planning, procurement and execution of equipment installation covering 33KV, 11KV Switchgears and ancillary equipments including HVAC control system and Fire Fighting work (Project Value 20 MUSD)
6 x 175MW Power Generation Station + 6 x 12mpd desalination station project in Al Taweelah. Handled equipment erection and Lighting and small power, Telephone system works etc. (Project Value 12MUSD)

(2) Company ETA-ASCON group Company – Power Projects Division
Duration From February 1995 up to June 1995
Designation Field Electrical Engineer Project handled all site related activities and provided support services to Testing / commissioning team
Project (1) 3 MW diesel generators and 11KV network installation in Abu Al Abiyad Island for H.H. Sheikh Khalifa's Palace
Project (2) E20/92 East Coast system "Up rating to 132kV system" including 3x132/11KV Substation, 132 & 33KV Cabling (Mitsubishi), 132KV Transmission lines

PREVIOUS EMPLOYMENT HISTORY (In India)
- Engineering Projects India Limited (a Govt. of India enterprise) as Electrical supervisor handling various industrial / commercial and Mass housing projects electrification works. Between August 1988 up to Jan 1993

ACEDEMIC QUALIFICATIONS
- B.S. in Electrical Engineering
- Diploma in Electrical & Electronics Engineering

PROJECT MANAGEMENT TRAINING
- Project leadership, Management & Communication course conducted by ESI & ABB in association with George Washington University in Bangkok, ABB Thailand during June 2004
- Contracting for Project Managers course conducted by ESI & ABB in association with George Washington University in ABB during March 2004
- Project Management Application course conducted by ESI & ABB in association with George Washington University in Rotterdam, ABB Nederland during November 2003
- Project Scheduling, Cost Control and Risk review course conducted by ESI & ABB in association with George Washington University in ABB during March 2003
- A Course on Microsoft Projects from Cambridge Educational Training Institute, Abu Dhabi, (2004)
- A Course on Primavera Project Planner from Chennai, India (1999)

COMPUTER COURSES
- A Course on SCO - UNIX, NIIT, Bahrain (2000)
- A Course on Windows NT server 4.0 from Galaxy Computer Est. Abu Dhabi (1998)
- AutoCAD up to advanced level (1995)

ON JOB TRAINING
- A course on process, control & instrumentation in a chemical factory environment, advanced technical institute, Madras, India, (1993)
- Site training on 132 kV cable installations by Mitsubishi cable industries (Japan) limited in Fujairah, UAE (1993)

COMPUTER SKILLS
- Practical knowledge on operating Systems Microsoft Operating Systems
- Excellent knowledge on using MS Projects, MS Word, MS Excel and various other application programs

MEMBERSHIPS
- Associate Member with Ontario Association of Engineering Technicians and Technologists, Toronto, Canada (Since 1999)
- Graduate student membership in Institute of Electronics and Tele comm. Engineers association, New Delhi
- Have competency certificate to supervise and commission HV/MV/LV electrical installations issued by Chief Electrical Inspector to the state

Driving License LMV d/l from Canada, India, UAE & Bahrain

View contact information...
«« previous resume next resume »»
Search Results (Resumes 651 to 700 of 1637)Go to Search Parameters...
Brief Description
A higly qualified technocrat having more than 33 years of experiance inoperations, projects, and marketing.
Shipyard Coatings Program Manager
I am a Mechanical Engineer graduated from the University of Bangalore who passed out during September 2000. I got more than six years of professional post qualification experience in the Mechanical Engineering field. As a young budding Engineer, I am very much eager to join your Esteemed Organizatio
Chemical Engineer and experienced Engineering Facility Manager with strong project management skills and over 15 years experience in a highly regulated industry
Sales Planning & Execution, Sales Budgeting & forecasting, Senior level Negotiation, New Product introduction, Team building & Organizational leadership
Projectmanager process watertreatment wastewater water biofuels bio fuels plantengineering plant engineering engineer claimmanagement commissioning basicengineering, detailengineering sitemanager tendering scheduling calculation
Experience includes government procurement, commercial and R&Dcontracts, environmental, international (primarily renewable energy projects in the Middle East), limited intellectual property activities, and varied management and staff functions. Will relocate worldwide on a single status basis.
Over 22 years experience with sour oil & gas processing, acid gas injection, and heavy oil production facilities, on and off-shore. Over twelve years managing various technical support, trades and operations staff. Over nine years of overseas/foreign experience.
I currently hold over 18 years of government contracting experience including purchasing commodities, service contracts, repair, maintenance agreements and construction contracts via oral solicitation, request for bid (overseas), sealed bidding, and negotiated agreements.
Over 12 years experience of materials management in one of the largest oil fields of the World (Tengiz, Kazakhstan). I am looking for a Materials Coordinator, Materials Controller, Warehouse Supervisor or any other materials or logistics related job preferably in oil and gas industry.
Degrees in Electronics and Instrumentation.Highly detail oriented, and organized. Good planner, a self-starter with ability to meet deadlines, and personable. International experience in & gas and other industries.
Senior Planning Engineer, > 15 years experience in upstream oil&gas projects, construction.
15 years of experience in design, technical assistance and consultancy for railways, highways, motorways, bridges, metallic structures, consolidation of slopes, arrangement of platforms. Experience in setting out, cost estimates and materials engineer.
Construction Manager/ Plant Maintenace Manager
Over 34 Years of experience in NDE Field.
Experience of about seven to eight years of Managerial post and having responsibilities of monitoring of project in all aspects.
I hold a Master Degree in Civil Eng. – Canadian Equivalent and possess 17 years of professional experience in Project/Construction Managt, Design and Manfg of Structural Steel and Pre-Eng. Buildings. Regstd PE in Canada on August 05.
Legal and Commercial Consultant specialising in Project and Contract Management. Specialist in O&G, Environmental, Engineering and Utilities
An experience individual with excellent knowledge of Freight handling / Exports Management with the objective of achieving organizational goals and making it a strong profit center, seeks an opportunity in managerial capacity.
Business Management professional - travel, tourism, travel e-commerce and travel process outsourcing
cable management, electrical construction supervision, electrical assistance
Please refer. my Resume below
Electrical Engineer with over 21 years' varied experience in Projects- contracts, engineering, construction, project management with EPC-MNC, Large Process/Chemical and Electricity Utility companies
I am a Piping / Pipeline Construction Manager or Superintendent in the Oil and Gas Sectors, I have a wide and varied experience of overseas Projects, with expeience of Construction, Maintenenance and Production work on and offshore.
Rigging Superintendent
Site Manager, Construction Supervisor and Crane AP.
Instrument/electrical eng. , electrical engineering, present position instrument section head, broad expert in instrument, chemical and mining industry experience, hig do to say ratio
To offer a background 0f 15 years experience in EPC & Commissioning including 4 years in construction management and 4 years in project engineering & 7 years in field of construction projects with proven strength in inspiring the confidence and trust of Owners & others of Petrochemicals projects/ref
Conduct daily inspection of buildings and work areas,conduct a toolbox meeting,report all incident and accident,making jha,and teach the workers to wear always their ppe
15 years of broad based management experience in diverse development projects. Experienced in planning, execution, monitoring, training, consultative, information dissemination, research analytical and evaluative services in project implementation. Recognized as a gutsy, hardworking and dependable t
Professional contract negotiator & administrator
Project Engineer - Electrical Electrical Engineer with (15) years of experience in multi national projects in India (4 years) and Middle East Power projects (11years) Construction and Project Management field especially in High Voltage Substations and Power Station environment
Senior Manager with 30 years of proven strong management skills in problem solving management.
Senior Accountant, Chief Accountant
Proposal and Project Management
Project management,QA/QC,Construction,Maintenance
23 years in safety field in Petroleum Refineries, Petrochemical Plants, Pipeline Projects, Well Services, Wireline Operations, and Wastewater Treatment. 8 years with Safety Instructor tasks, 7 years in Construction Projects, 5 years with Q/A Q/C tasks, and 7 years in Managerial level
Graduate/Mechanical Engineer-Working in Project Engg., & Management for Oil, Gas & Petrochemical
Project Manager Deepwater, Regulatory Compliance
Senior electrical engineer with experience in oil and gas , power generation and industrial projects
Greater than twenty five years of experience in power & Oil & Gas projects. Fully experienced in preparation, implementation of QA system & auditing of inspection procedure & personnel. Experience includes writing, monitoring, instructing, witnessing & approving Quality Procedures, Welding Procedure
QA/QC Engineer
Msc Quality & prodt. Mgr 16 Yease Experiance
Environment, Health & Safety Manager in a Manufacturing and Software Research & Development facilities with 6+ years of exp.
Senior Program, Project, and Construction Management Engineer
Management and Supervision Material Cordinator- control, expeditor
Project Management - Oil & Gas; Plant Equipment Maintenance.
Quality Assurance, Quality Control, Inspector, Sr. Inspector, Sr. Surveyor, QA/QC Inspection Engineer– Supply / Construction, Quality Coordinator / Administrator, Procurement Quality Inspection Services Manager / Coordinator, Expeditor, Lead Mechanical Engineer.
BE-Mba graduate with good academic records
Stanford MBA, BSc, (Mechanical Engineering); Seasoned Oil & Gas professional with 14-years international leadership experience in engineering, project management, procurement and contracting, and commercial activities
1   2   3   4   5   6   7   8   9   10   11   12   13   [ 14 ]   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com