Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #11509
next resume »»
CONTACT INFORMATION:
View contact information...
OBJECTIVE:
To obtain a challenging position in the Oil & Gas or Power Industry that will allow me to utilize my education, experience and personal abilities.
EDUCATION:
3 Years Course in Mechanical Engineering with First Class passed in 1987 from M.R.K Polytechnic Institute, India.
EXPERIENCE:
17 years experience in the Oil / Gas & Power Sectors.
PROFILE OF EXPERIENCE
Construction
- Review the Engineering design and construction work in accordance with the Project Specifications and applicable Standards.
- Review inters-disciplinary interfaces and follow up with the Engineering team.
- Write construction specifications for mechanical construction activities and interface with construction personnel during construction and testing.
- Review and clarify the Technical / Engineering queries of the various sub-contractors.
- Check, review and ensure that all the Field Design Modifications / Changes, Contract Engineering Data Sheets are processed and recorded.
- Ensure all the field modifications are recorded and the "As-Built drawings are incorporated in the drawings.
- Review of the Project procurement materials with the concurrence to the relevant design an drawings.
- Review, Coordinate and monitor the manufacturing plans of various vendors and contractors, give them target dates based on overall project plan and also make inspections during the fabrication stage.
- Review the FAT punch and follow-up the punch list clearance process.
- Project Planning and scheduling of construction to link up with other infrastructure facilities and hand over.
- Make, review and implement method statements for execution of Construction.
- Review and monitor the rigging methodologies with Job Safety analysis made and implemented by the Contractors
- Issue Mechanical progress figures with daily, weekly, and monthly discipline reports.
- Push & make improvements for achieving the various milestones & targets during the construction phase.
- Coordination with Client, vendors, plant personnel, other departments and contractors.
- Ensure that all the Non-Conformance Reports issued during Procurement and Construction phase are closed promptly by the concerned responsible group
- Make, publish and ensure the signing off the Mechanical punch list.
- Implement & maintain Safety Standards and codes.
- Identify the back charges and ensure to notify the concerned contractors of the deviations.
- Issue of Field instructions, make change orders and progress valuations.
- Review and ensure the contractors compliance with all Quality Plans, Procedures, Inspection Test Plans, Erection Completion Packages in coordination with the QC Dept
Commissioning
- Preparation of the commissioning procedures and schedules.
- Ensure that adequate care and maintenance / preservation of equipment are being carried.
- Make all Mechanical Sub-System Pre-commissioning specific tools dossiers at RFC stage.
- Plan the critical commissioning, operational spares for all the Equipments.
- Review and ensure that any requests raised for waive off's and concessions by the contractors quickly resolved
- Prepare, review and Ensure that the Technical Documents are issued and controlled within the commissioning group in accordance to the Project procedures.
- Reviewing specifications and procurement requirements to ensure adequate provision been made for testing, flushing, cleaning and other pre-commissioning functions.
- Prepare, Review and complete all Commissioning check lists as per the specifications.
- Perform checkout, cleaning and commissioning tasks on various equipments.
- Ensure that adequate care and maintenance of Equipment / Preservation of Equipments
- Undertake mechanical run tests of all Rotating Equipments and their trouble shooting.
- Maintain commissioning and start-up records.
- Preparation of preventive maintenance & lubrication schedules.
- Utilize the safety tagging and lockout procedure/process.
- Planning, scheduling and performance of equipment maintenance during the commissioning and start-up of the plant.
- Supervise assigned construction craft labour.
- Participate in Facility performance and acceptance testing.
- Preparation and implementation of preventive maintenance & lubrication schedules
- Compilation of maintenance data for review and analysis.
- Shutdown planning and co-ordination with the contractors.
ORGANIZATIONS WORKED
Fisia Italimpianti, Federal Electricity & Water Authority's Ro Project, Ghalilah, UAE.
Senior Mechanical Engineer, May 2004 – Till Date.
I am responsible for the Erection and Commissioning of all rotating and static equipments. Which consist of Pumps and Compressors, EOT Cranes, Filters, RO Modules, Exchangers and Vessels. Lead a multinational work force consisting of Engineers, Supervisors and workmen of different crafts and trades and reporting to the Site and Commissioning Managers.
DODSAL PTE LIMITED, Occidental's Northern Oman Gas Project, Safah, Oman.
Mechanical Engineer, October 2003 – Feb-2004.
I was responsible for the Erection and Commissioning of rotating and static equipments. Which consist of Compressors driven by Superior Engines(GSI Weatherford) and Gas Turbines (Taurus 60 units supplied by Solar) & Atlas Copco and their related Air Coolers, Exchangers, KO Drums, Scrubbers & other Package units. Lead a multinational work force team and report to the Chief Construction and Commissioning Managers.
ENELPOWER, DEWA K-II POWER STATION, Dubai, UAE.
Commissioning Engineer, October 2002- October-2003
I was involved in the Commissioning & Maintenance activities of the Gas Turbines (3nos each with cap of 242MW), Gas Station, Auxiliary Boilers (2nos 370tons/Hr), HRSG's (3nos 700tons/hr), and Demin Water Station. I was very responsible for carrying out Mechanical Commissioning and Maintenance activities of the total plant. Headed a multinational workforce team and report to the Site and the Commissioning Managers.
DODSAL PTE LTD, DEWA K-II POWER STATION, Dubai, UAE.
Mechanical Engineer, September 2001- September 2002
I was responsible for the Erection of all Rotating & Static Equipments. Which include Siemens make Gas Turbines (V93.4) 238 MW, Gas Compressors of Nuovo Pignone (SRL) & Boje makes, CBI make FD Fans, BFW's Pumps of Thermo Mechhanica & process pumps of Garbarino makes, Diesel Gen Sets (Deutz make) & Static Equipments like Feed Water Tanks, Dearetors, Total Gas Station Equipments including storage modules, GPRS skids, Gas filters & flare, demin plant equipments like mixed bed filters. Headed a multinational workforce team and reported to the Chief Construction & Commissioning Managers.
MECON, AT NGL-4, DUKHAN SITE, Qatar.
Mechanical Supervisor, March 2001- September 2001.
I am responsible for the Erection and Commissioning of all Rotary {Gas Turbines Nuova Pignone make Frame-V (MS-5002) & Alstom's Tornado 8 MW}, Nuova Pignone, Mitsubishi, Maffi Trench, Demag Laval make Reciprocating & Centrifugal Compressors), Pumps of various makes. Lead a multinational team of Consisting of, Formens, & workmen of different crafts and trades and reporting to the Construction Manager and the Lead Commissioning Engineer.
RELIANCE PETROLEUM LIMITED, Jamnagar, India.
Maintenance Engineer, Sept 2000 – March 2001
This is the world's largest refinery. I was responsible for the Commissioning & Maintenance of Gas & Steam Turbines, Pumps, Centrifugal and Reciprocating Compressors of Alfa Laval, Ingersoll Rand. & Pumps of different makes, maintenance of Columns, Storage Tanks etc. in the Aromatics Plant and was reporting to the Maintenance Manager and the Plant Manager.
ABU DHABI GAS LIQUEFACTION CO (ADGAS), Das Island, UAE.
Mechanical Supervisor (1999-2000).
My Roles included technical service and maintenance to ensure safe and reliable operation of the plant. Some of my responsibilities are associated with the breakdown and preventative maintenance. Supervise and co-ordinate a multi-disciplined work force in the day to day running of a CENTRAL PRODUCTION FACILITY, which includes gas & steam turbines, Centrifugal and Reciprocating Compressors & pumps, valves. Supporting production operations by ensuring high reliability, and availability through maintenance work in a planned, safe and efficient manner. Lead a multinational team of Consisting of, Formens, & workmen of different crafts and trades and reporting to the Maintenance Manager and the Lead Mechanical Engineer.
Consolidated Contracting International Company,
RAS Laffan Lng Onshore Facilities Project, State Of Qatar.
Mechanical Supervisor, 1997-1999.
I was responsible for the erection and commissioning of rotary equipments such as Gas Turbines GE make frame VI, Compressors of Ebara, Elliot Mitsubishi, Demag Laval makes, Pumps, Sea Water Intake equipment Erection of Columns & fixing internal trays. Lead a multinational team of Consisting of, Charge-Hands & workmen of different crafts and trades and reporting to the Lead Construction Engineer.
HINDUSTAN POLYMERS, VISAKHAPATNAM, INDIA.
Mechanical Engineer, 1987-1997.
CONSTRUCTION STAGE: 1987-1989
I was involved in the project activities for Styrene, Expandable Polystyrene and Polystyrene plants. Erection and Commissioning of all Rotating Equipments like Steam Turbines 5mw, Compressors (Worthington, Ingersoll Rand, Alfa Laval makes), Pumps (Pacific, KSB, & Worthington makes), Cutters, Vibrating Screens, Mixers, Extruders, & Static Equipments like Fractional Distillation Columns, Reactors, Oil Fired Boilers, Fired Heaters, Flare etc.
MAINTENANCE OF THE PROJECT: 1990-1997
I was transferred to the Central Maintenance Workshop. Some of my responsibilities were
- Planning of day to day as well as annual turnaround jobs
- Trouble shooting of Rotating equipments.
- Standardization of maintenance procedures etc.
- Development of indigenous vendors for imported spares.
- Preparation and implementation of preventive maintenance & lubrication schedules.
- Shutdown planning and co-ordination with the contractor.
KNOWLEDGE / TRAINING:
a) Centrifugal pump training, improving pump system and seal reliability.
b) Steam Turbines maintenance training.
c) Familiar with codes and standards. API 610,614,617,618,619 & 650
d) Safety Inducted for H2S, safety & fire fighting procedures.
e) Finished a Safety Course in "Safety at Construction Sites" conducted by Bureau Veritas, Dubai.
f) Done a First Aid Course.
COMPUTER SKILLS: Primavera, MS Office 2000, Visio and MS Office.
REFERENCE: Available on Request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1351 to 1400 of 3119)
Go to Search Parameters...
Brief Description
An Engineer + MBA from Mumbai University and having good experience in Construction Industry
Emad Toubar is currently employed by Saudi Consolidated Engineering, SA as a senior mechanical piping engineer, where he provides engineering design services for Saudi ARAMCO and other major petroleum companies in Saudi Arabia including design of piping systems and petroleum pipelines for new wells.
Highly motivated individual with strong FEA experience. As a stress analyst, I enjoy analysing the products that designers design, highlight potential problem areas and ultimately help product development by saving cost. My aim is to make product more durable and cost effetive.
Electrical & Instrument Designer
Structural Engineer +3 Years EXP.
HSE officer with 6yrs of exp. having Nebosh, Iosh, Osha etc.
Working as Senior Project Engineer in Ontario, Canada with a firm, which specializes in the design of municipal infrastructure, roads and water resource management.
Ability: proficient in window application
Senior Electrical Engineer
I have over 5years and 8 months of combined experience in computer programming and design of electronic appliance controls mainly for HVAC products. Presently I am working as an Electronics Engineer (HVAC Electronic Controls Design, Testing & Approval) in the R & D dept. of Awal Gulf Mft. Co.
This is a resume which will illustrate briefly what I have achieved both with educational and industrial environments.
Sr Structural Designer / PDS FrameWorks Coordinator and project set up.
Estimator, Project Manager, Project Engineer, Construction Administrator, Architectural Designer, CAD
instrument engineer with 6 yrs of experiencer in construction management,projects and commisioning in instrumentation field.
Primavera Scheduler
Facilities supervisor for utilities, electrical disturbution, ammonia refrigeration, power boilers and heat exchangers,production equipment, infrastructure, mechanical contractor for twenty years,
Radiation Safety Officer, Certified Health Physicist, Environmental Manager
Mechanical Engineer, 2 yrs of experience in design and development, cad packages- CATIA V5, solidworks 2006
For the post of Design and draughting
Six years of experience in Project Management, Contract Management, Quality Control and site supervision of high-rise residential and commercial project. About four year of experience in Project Management of an industrial projects.
Objective: To contribute my technical skills and to be part of professionally managed Organization that provides excellent opportunities for learning and scope for Individual development.
Architect and Environmental Planner Total Job Experience-2.5 yrs as an Architect 2 Months as a Planner
Bilingual engineer with experience in engineering and teaching. Experience in administration, group management. Dynamic and outgoing by nature.
MSc in Environmental Engineering from University of Nottingham, UK
I am piping engineer with diploma in mechanical engineering to Poli- Technic institute "GH.Asachi" Iasi, Romania
Piping Designer with Over 20 years experience within the Oil and Gas, Petro Chemical, Refinery, Textile, Pharmaceutical and Nuclear Waste Industries
Young academically accomplished geotechnical engineer, practical experience in the mining industry both domestic and overseas.
Application for the post of Safety officer
EXPERIENCED PIPING ENGINEER WITH PDS ADVANCED EXPERTISE / TECHNICAL DATA SPECIALIST
Make, Review and implement Engineering design, construction work,inter-diciplinary interfaces, Construction Specifications, Progress reports, Quality Plans and all the commssioning and Maintenance Procedures.
Knowledge of Hydrotreating & Hydrocracking, Catalytic Cracking, Distillation and Amine plants. Knowledge of Process simulation (HYSYS, ASPEN Plus, PRO II and HTRI), PFD, P&ID, Flare and Relief systems, LDT, Hydraulic calculation, HAZOP review, Equipment sizing, TBE, DPDT and process data sheet
QA/QC, CERTIFICATION, TURNOVER
Interior fitouts Project Manager - expertise in Site execution, Management, Planning , Procurement, Coordination between Services. A Go-Getter and Self-Motivated Engineering Professional.
I have a master degree from the American University in Cairo, excellent computer skills, English & French languages, Excellent communication skills, and presentable. I prefer workin in construction management field
I am a master electrician with 35 plus years in the management of large construction projects. I have over three years experience working in Iraq, working with many different cultures and in adverse conditions.
Develop & implement Contractor’s Quality Control Plan in accordance with contract & technical specifications including writing the Inspection & Test Plan, Quality Audits, Record Keeping, Prepatory Phase Meetings, Resolve NCR's, Process Control, Sub-Contractor Control, every aspect of Quality Control
Im certified coating inspector B-GAS grade2&SSPC-PCI
Senior Electrical, Energy Model, LEED, sustainable, Head, Manager, renewable, coordinator, building commercial, residential, healthcare, Education, industrial, parks, Hotels
Career Objective
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
Experienced Autocad drafter with 5 yrs. structural steel detailing experience seeking employment.
6+ years of software design and development experience with specialization in Client/Server programming, Object Oriented Analysis and Design. Proficient in, C/C++, MFC, Visual C++, Win32 API, COM/DCOM, multithreading.
Curtain Wall Civil Structural Engineer Manager
A structural engineer with experience in design, construction and inspection of buildings and bridges.
11 years of experience in Erection & Installation, Engineering, Design, Commissioning, Inspection and other Management activities in the field of Terminal Automation, Gas Metering, Refinery, Gathering Centers and others.
Engineer with practical business, design and management experience in the areas of Civil and Geotechnical Engineering. Educated professional, committed to continuous improvement, ethics, teamwork and quality service. Detail oriented, excellent communicator, and capable of managing multiple projects
16 years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control s
Willing to accept challenging career in telecom Development Equipment Environment with management and seeking for a position where I can utilize my technical skills and professional experience, to provide the best of mine for the success and growth of the organization and gain satisfaction thereof.
To obtain Position in Project Management or Project Engineering in an International Environment
SAP knowledge,Material engineer,controller.Thorough knowlege of Isometric drawing,fabrication,material manual,and inventory.oil and gas field,gulf and offshore experience.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
[ 28 ]
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com