Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #21009
next resume »»
CONTACT INFORMATION:
View contact information...
EXPERIENCE
February,2004 – Present Arab Technical Construction Company (arabtec), Dubai, UAE
SENIOR PLANNING ENGINEER
AL Fattan towers Project.
Responsible for the planning & Monitoring activities for Al Fattan towers (2 residential Towers 52 story each sharing a 3 level podium & 3 level basement Total area of typical floor is approximately 1500 square meter for each tower and total Area of each floor of basements is 11000 square meter)
Le Reve Residential tower Project.
Responsible for the planning & Monitoring activities for Le Reve tower ( residential Tower 51 story approximately 1400 square meter for each tower (Two very prestigious flats in Each level up to level 36 and one flat per floor above level 36)
Dubai Pearl Project (Tower A1, A4 & A5).
Responsible for the planning & monitoring activities for 4 packages of Dubai Pearl Project (Hotel Tower 62 story in addition to 2 residential Towers 52 story and the shared 3 levels podium of a total area of approximately 66000 square meter per level)
July,2001– December,2003 A. A. Turki Corporation ATCO Dammam, KSA
Planning & Cost Control Section Manager
* Managing the planning Cost control section for the Company and successfully directing the planning and cost control team utilizing an advance planning and cost control system (PRIMAVERA ENTERPRISE) to monitor and control the cost of company Projects assuring timely completion of projects within budget.
* Assisting General Manager in preparation of Enterprise strategic plans and fiscal budgets.
* Planning recruitment in addition to the preventive maintenance and renovation of enterprise owned resource pool.
* Assessing vendors/ subcontractors technical proposals for alternatives enhancing schedules and costs for critical items specially during tendering stage.
* Providing tendering stage schedules, resource loading and cash flow and analyzing risks of all new tenders on company cash flow and resources to obtain board of directors' approvals on tendered projects which exceeded a value of 1.2 billion SAR during 2002.
* Planning Execution, Monitoring milestones and obtaining clients approvals on Projects construction schedules.
* Monitoring Execution and preparing weekly reports and look-ahead schedules for all projects and consolidating projects reports into monthly reports to Higher Managements.
* Coordinating and circulating resources (between 14 Project through out 2002 & 2003) in various fields (Infra Structure, Industrial, Residential Complexes, Palaces and high rise buildings).
* Scheduling, budgeting and monitoring variances for all procurement activities to assure timely arrival of materials to sites while registering records and alarming for variances in quantities and prices.
* Preparing recovery schedules and action plans for recovering variances and/or assessing changes impact on schedules and budgets and preparing time extension claims.
* Major Projects:
1. EASTERN PROVINCE CEMENT COMPANY HEAD OFFICE EPCC (Dammam – Khobar Highway)
The (SAR 70M) project was a 19 Story CIP Framing Building with curtain Walls Cladding. Built on loose soil utilizing Pile foundations. It consists of a basement, Ground Floor, a technical floor, 15 repetitive stories and a roof. The building has a built up area exceeding 20,000 m2 with high quality finishes and modern electro-mechanical systems (Addressable fire detection system, fire fighting system, intelligent power saving lighting system, MATV, CCTV, LAN and Chilled water HVAC system) Most of which are monitored and controlled by a sophisticated BMS.
2. ABDUL-KAREEM COMMERCIAL BUILDING SAMC (Dammam Cornish Road)
The (SAR 30M) project was a 10 Story CIP Framing Building with curtain Walls Cladding. Built on loose soil utilizing Pile foundations. It consists of a basement, Ground Floor, a Mezzanine floor, 6 repetitive stories and a restaurant on the roof floor. The building has a built up area exceeding 12,000 m2 with high quality finishes and modern electro-mechanical systems (Addressable fire detection system, fire fighting system, intelligent power saving lighting system, MATV, CCTV, LAN and Package type HVAC system) Most of which are monitored and controlled by a sophisticated BMS.
3. ATEF SAEED COMMERSIAL BUILDING (Khobar Pepsi Road)
The (SAR 13M) project was a 6 Story CIP Framing Building with curtain Walls Cladding. Built on loose soil utilizing Raft foundations. It consists of a basement, Ground Floor, a Mezzanine floor, 3 repetitive stories and a roof floor. The building has a built up area exceeding 7,000 m2 with high quality finishes and modern electro-mechanical systems (Analogue fire detection system, fire fighting system, intelligent power saving lighting system, MATV, CCTV, LAN and Package type HVAC system).
4. AMCDE ENGINEERING OFFICE BUILDING – Khobar Rakah
The (SAR 13M) project was a 5 Story CIP Framing Building with curtain Walls Cladding. Built on loose soil utilizing Raft foundations. It consists of a Ground Floor, a Mezzanine floor, 3 repetitive stories and a restaurant on the roof floor. The building has a built up area exceeding 6,000 m2 with high quality finishes and modern electro-mechanical systems (Analogue fire detection system, fire fighting system, lighting system, MATV, CCTV, LAN and Package type HVAC system.
5. AL JERAISY RESIDENTIAL COMPLEX – Riyadh
The (SAR 50M Excluding Material Prices) project consist of 2 Prestigious Residential palaces, 6 Sons Villas, Reception palace, 2 diwanias, a mosque, a driver quarter, for a total built up area exceeding 22,000m2 and annexes surrounded by more than 2000 m of pre-cast concrete perimeter fences. The project contains intensive high quality landscaping that contains –but not limited to- Seven swimming pool, Artificial lake, fountains and plantation
6. PRECISION FORGING PLANT. (Dammam Second Industrial Area)
The (SAR100M) Heavy industrial Project consists of a Production building, an administration building, main incoming substation building, 2 underground water tanks (Fire and sweet Water), a septic tank, a reverse osmosis plant building, a water well, a weighing bridge, a material storage area, perimeter fences and guard house in addition to several buried supporting utilities.
The Main production building was an 8,000 m2 Steel Structure Building that contains 2 presses (2500 Ton & 4000 Ton) in addition to Material Cutting and Staging for Both Carbon Steel and stainless steel flanges, Die Manufacturing lines, car hearth Furnaces, totally computerized Milling Machines in addition to 2 Overhead Cranes and the associated control rooms, electrical rooms, mechanical rooms, labs and technical offices).
The administration building was a 2500 m2 2 Story steel structure building supported by modern electro-mechanical systems.
7. APPLIED MEDICAL SCIENCES FACULTY – King Faisal University Dammam
The (SAR 50M) Project consist of a 3 Story CIP Concrete Building (15,000 m2) Built in KFU compos over a very loose sand enhanced by soil replacement Method (Stone Columns).
The building contains several class rooms, offices, labs, Dean & Staff offices, auditorium and Plaza are with all accompanied sophisticated electro-mechanical system for such construction like LPG, oxygen and Vacuum lies, LAN, Fire detection and fighting systems, MATV, CCTV and chilled water HVAC system.
8. AL KHALEEG VILLAGE –Saudi Hotel & Resort company SHARACO Half-moon
The (SAR 15M) Projects was the infrastructure for a Village. It was to construct a 6 km 12m Road under which Sewer lines, Fire Water Lines, Raw Water lines, Medium Voltage Cables and telecommunication cables. The scope of work included the street lighting, 3 Lift Stations, 3 Electrical Substations and several Manholes and Holes in addition to the surrounding landscaping and side walks.
9. ARAMCO POWER DISTRIBUTION DEPARTMENT HEAD OFFICE BUILDING –ABQAIQ
The (SAR 17M) project was to Construct a 6000m2 Steel Structure Building Head office Building in addition to a workshop, Truck and Trailer Shelter, Musalla and Covered Storage Area. The project scope of work included all Civil, Mechanical, Electrical, HVAC and furniture work adopting the well known ARAMCO standards and procedures.
10. SCECO SUBSTATIONS – Dammam & Faisaliah
The Scope of work was to construct 2 Substations for the 36.6 KVA Stations located in Dammam first industrial Area and Faisaliah. Each was approximately 450m2 with all required electromechanical Systems, cable trays, Duct Banks and trenches adopting SCECO well known Standards & Procedures.
11. AL TURKI COMMERCIAL CENTER – Khobar Cornish Road
The Scope of work was to construct a three steel Building shopping center with pre-cast concrete cladding, with glass shop fronts and electrically operated doors. The scope included providing three transformers, package type AC Units, Fire Fighting system in addition to external work that consists of Underground water tank, asphalt work. Side walks and fountains. Internal Finishes were left to tenants
July,2000–July,2001 ELMANDEB EST Dammam
Projects Control Section Manager
* Responsibility included Projects Planning, Monitoring activities, Coordination between projects, Procurement activities in addition to managing the Engineering Activities for Establishment owned Pre-Cast concrete factory, providing principal contact with the customer and review of all contracts and claims for several projects constructed by establishment in three major Fields, namely: Pre-cast Concrete Construction, Water Supply and Sewerage and Building construction.
1998–2000 FEMCO Al Khobar
Planning Engineer promoted to Section Manager
* Developing project plans (Master Plans Macro Plans) and schedules, and subsequently manage efforts to insure completion of projects within time, scope and budget.
* Organizing and controlling the cost of resources (Manpower, Equipments, Materials and Subcontractors)
* During the execution phase of the work, preparing and maintaining several levels of increasing detail, time phased schedules. Providing status updates to schedules and analyzing progress, scheduling performance and variances from the plan. Obtaining and/or recommending corrective actions for mitigating deviations from the plan. Identifying and mitigating project risk areas, and developing risk mitigation plans.
* Major Projects:
1. IBN HAYYAN PLASTIC PRODUCTS CO. TAYF-1 project (A multi national industrial rush project for Saudi Basic Industries Co. SABIC.) The Petrochemical Industrial project was a three plants project with their utilities, namely an Artificial Leather Products Plant, a Wall Covering Products Plant and a Cellular Extruded Product Plant with a provisional contract value of $200M.
2. HRH PRINCE SULTAN BIN ABDUL-AZIZ CITY FOR HUMANITARIAN SERVICES.
Participated in the Monitoring and control process the Bid Packages 5,6 and 10 of the project
* Additional activities:
-Participating in three projects along with Whinny Murray Co. (Ernest Young) as a coordinator to:
1. Restructure the company
2. Management Reporting system
3. Certify the company with ISO 9002.
1997–1998 Grand Amman Municipality Amman
Building licensing and Operation & Research Engineer
* Licensing of newly established and modified buildings
* Participation in an O.R. team in coordination with the consultant office in the university of Jordan to restructure the procedures and formats used in the municipality
1996–1997 SIGMA Amman
Site Engineer / Planning Engineer
* Joined two departments of the project namely "Technical offices and Site offices to participate in several Inspection activities for Skeleton, finishing activities, project control monitoring and plan follow up".
DEGREE
BSC in Civil Engineering (University of Jordan)
LANGUAGES
Arabic (Mother Language), English, French & Turkish.
CERTIFICATION
1. Planning & Monitoring with P3e. (102)
2. Advanced Topic with P3e (106)
3. ISO 9002
4. ARAMCO Work Permit Receiver
COMPUTER SKILLS
1. Operating Systems: DOS, Windows 95, 98, ME, 2000, XP
2. Project Management: Primavera Project Planner, Primavera Enterprise, Progress reporter, Primavision, Portfolio Analyst & Ms. Project
3. Strategic Planning: Business Plan Pro & Smart Business Plan
4. Contract Management: Primavera Expedition
5. Accounting Software: Fair Knowledge of ACCPAC.
6. CAD: AutoCAD & Bentley Micro station
7. Databases: DB2, DB5, Ms. Access, FoxPro
8. Spreadsheets: Excel & Lotus 123
9. Word Processing: MS Word, Word Perfect & Adobe
10. Programming Languages: Basic, Fortran, Pascal, C, SQL, AutoLISP, HTML
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1051 to 1100 of 3124)
Go to Search Parameters...
Brief Description
Piping detail, scheduling, field work and design in refineries, chem plants offshore prouction platforms, onshore and offshore oil drilling rigs sugar mills using acad,( short term cadworx,rebis, smartplant) and on the board
LAND SURVEYOR
Seventeen years experience in electrical engineering design, construction supervision, commissioning & start-up for major international EPC and Consulting firms specialized in power generation, T & D grids, oil and gas petrochemical fields
Summary of Qualifications,Combined experience in Industrial Refrigeration Technician / Electrician Technician in the Pharmaceutical Industry,Petro chemistry, Building Management System (BMS), Ship Systems, Maintenance and Troubleshooting.
Design engineer
25+ yrs progressive exp. as a Sr. Supervisory Planning/Scheduling & Project Control Engr/Mngr with Risk/Contracts Exp, Int'l w/Utilities, EPC Firms/Consultants, Turnkey OEMs and Constructors within the Energy Sector. P3 Ver.3.1, Primavera P3e/cVer.5, 6.2,Pertmaster, Claim Digger, MS Office, Acrobat
Fifty Years Total Experience in process engineering and technology development. Including More Than Twenty Years Process Engineering Experience on petroleum refinery, oil & gas production and petrochemical projects. Experience includes process simulation software Hysys/Pro II/Dynsim/Aspen.
The majority of my 15 years of experience has been applied to inspecting in-service pressure equipment and piping in a refinery setting. I am an excellent communicator with exceptional organizational skills geared toward inspection, NDE planning and crew leadership.
Mechanical Engineer with over 20 years experience in major Oil & Gas Construction and Maintenance. 12 years in Project Management, 10 years in Pre-commissioning/Commissioning and Start up of various facilities, 12 years in Installation, 11 years in QA/QC Inspection.
Chief Engineer (Manager) in Technical Office for a large construction progect :High Rise building, Under ground Metro line, Industrial projects, Preparing and checking structural shop drawings with B.B.S., Coordination, Methods for constructions, using ISO 9000 - 2000 Prep. of Claims and V.O etc.
Senior Planning Engineer well versed with Primavera, Suretrack, MS Project
Technical office Manager.
Urban Roads and Highway design, Traffic and Transportation planning
Contract Negotiations, Quantity Surveying, Project Handling & Project Implementation, Project Co-ordination
Civil Engineer from REC Kurukshetra, India. Working as Assistant Manager (Civil) with Larsen & Toubro Limited - ECC Division
multi skilled engineer
To offer services as Senior piping designer for onshore and off shore oil and gas projects by using PDMS & PDS 3d model system
TO WORK AS A HVAC SALES MANAGER IN A CHALLENGING HVAC INDUSTRY.
International Weldig Engineer (IWE) , CSWIP 3.1 and Level II(two) Pt,Mt,Ut and RT
Experienced Industrial Structural Engineer - concrete, steel - 20+ years, UK & US codes
7 YEARS OF RIGGER EXPERIENCE
Diploma In Mechancial Engineering+NEBOSH Level-3+Environment, Health and Safety Management Specialist Certification from NASP of USA+ ISO 14001:2004 & 9000:2000 Certified Lead Auditor with 15 Years Experience in Oil&Gas as HSE Advisor/Engineer/Supervisor/Coordinator/
Mechanical Engineer Professional experience of 35+ years in Engineering and Project Management
KEY RESPONSIBILITIES :1. Transmission engineering in designing backbone links,2. Transmission network design, link budgeting for transmission links,4. Planning of STM-1 Ring Network in City and Backbone to have a Reliable Network with a uptime of 99.99%,6. Microwave Projections for the additional Si
Landscape Arch with varied experience of the micro and macro level design and execution of private and govt. projects
To secure a challenging position with a dynamic organization which will enable me to apply my education and creative skills to the benefit of the organization?
Planning Engineer, Certificate of degree Dr. of Philosophy
Professional graduate engineer experienced in Facilities Management, CMMS implementation and application, Technical Writing. Recent 16 months in Kazakhstan. Interested in contract work (rotational or short-term)
I am a Mechanical Engineer with around 9 years of experince, with knowledge in construction project manage. Desing of wellhead equipment, and drilling equipment, certified in none destructive examination.
I have done my M.S.(Control System Engineering) from Texas A&M University-Kingsville with G.P.A as 3.9 /4.0. I am looking for a job of control System Engineer. I have work experience of 1 year and 4 months. I am willing to relocate anywhere in USA. Thanks Rajesh
15 years of experience in repairs and maintenance to construction plant and machinery and 10 years at supervision/managerial level Plant predominantly Caterpillar
Skills: Contract Negotiation, Quantity Surveying, Project Handling & Project Implementation, Quality Control, Co-ordination with various agencies involved in project
Experience in quantity surveying, site supervision, planning, designing over water and over land structures.
I am a Naval Architect and Marine Engineer whom objective is to provide engineering solution in a merit driven environment with an opportunity for career development to face present and future challenges.
Looking for a position with an established engineering company, utilizing previously learned skills
I am a Mechanical engineering diploma holder, over 15 years of experience with CSWIP Plant Inspector, CSWIP 3.2, AWS CWI and ASNT LEVEL II in RT, UT & MT, with valid UAE driving license.
Senior Structural Designer whom has been on both sides of construction. I started out on the tools and made my way into the design and engineering. Please review the letters of reference on my website. My background has always been an asset in the design office.
I have bachelors in mechanical Engineering and Masters in Petroleum Engineering.I have working Experience in Pipe line and EPC Companies
MEP Manager with 14 years of int'l exp. in construction. Verify design, construct and commission. Executed prestigious & high rise buildings project which MEP works value in excess of US$380 M. Supervise and coordinate work acc. to contract ,budget, time, co. procedures & ensure client satisfaction.
Mechanical Draughtsman (AutoCAD,AutoCAD Inventor.)
responsible for the day-to-day operation and control of a CISCO based communications network.
Estimation and Costing,variationsnad claims,Monthly Progressive Bill preparations
A Wide experience in drafting in major of civil works, structural, mechanical, Piping & Instrumentation and architectural drawings, 8 years of overseas experience,Overall 15 Years of working experience in civil, structural, mechanical, piping, and architectural firms
More than 13 years post qualification experience out of which 7 years in Occupational Safety and Health, (4.5 years in oil and gas sector) interested in the development of modern techniques in the construction and oil field industry
Bachelor of Science in Civil Engineering
Rotational Power Infrastructure Manager & International Quality and Safety Systems Management
Civil Engineer, Civil maritime engineer
Computer ?Automation & Controls Engineer
PROFILE: Proficient in shuttering works, Steel reinforcement & fabrication, pipe fittings
I am a Senior Planner/ Project Controller with certified versatile capabilities and experiences in different fields of construction, including, but not limited to, Building construction, massive civil work, industrial construction, petrochemical construction, commercial complex and high rise buildin
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
[ 22 ]
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com