Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #22649
next resume »»
CONTACT INFORMATION:
View contact information...
A graduate mechanical engineer who specialise in maintenance, construction and project engineering with years experience in the management of people and capital equipment using acceptable methodologies to maximise performance and to reduce cost both in the power generation and oil and gas industries.
POSSESSES THE FOLLOWING QUALITIES:
- Good analytical skills that can apply both practical and theoretical knowledge in problem solving.
- Excellent hands-on abilities; able to sum up any problem in an instant and come up with a workable solution.
- Able to work independent with the minimum of supervision but also function well in a team as a team player.
- Project engineering skills able to lead multi disciplinary teams in mechanical engineering design, engineering construction, commissioning and maintenance projects.
- Sound practical experience and knowledge of rotating, high pressure, materials handling (including pneumatic materials handling), steam turbine, oil and gas and power generation equipment.
- Experience in quantity surveying, compilation of bills of material, tender documents and preparation of tender documents (tendering).
- Background as fitter and turner able to successful manage machine and workshops.
- Experienced in budgeting and cost control.
- Development of maintenance strategies for power generation and oil and gas industries and the implementation of reliability centred maintenance systems.
- Computer literate.
08/2002 - Present Amerada Hess Hassi Messaoud, Algeria
Engineer (Maintenance)
Type of Company: Onshore oil and gas
- Develop maintenance strategies for oil and gas handling equipment i.e. Cooper Bessemer KM 4 reciprocating compressors, gas turbine, Sulzer pump, electrical motors, transformers, separators, and various other compressors, pumps and equipment
- Writing the preventative maintenance procedures and work instructions
- Compiling maintenance plans, safety plans and lockout/tag out procedures
- Implementing a computerised maintenance management system (Maximo) and developing the asset register in Maximo (both for Maximo 4.1.1 and 5.20)
- RCM facilitation and maintenance strategy development for the installed equipment
- Supervising the Planning Department and the data upload into Maximo
- Compiling field outage and shutdown programs and plans
- Maintaining the asset register and identifying spares and setting up the minimum and maximum stock holding levels
- Supervise and project manage maintenance outages and shutdowns
02/2002-07/2002 Pyromet Technologies Parktown, Jhb, RSA
Project Engineer and Site Manager
Type of Company: Engineering and consulting (smelter industry)
- Conducting of a feasibility study to relocate and redesign an ingot-casting machine from Iscor PTA Steel Works to Cato Ridge Ferromanganese Smelter for the use of casting high carbon ferromanganese ingots.
- Concept design of the ingot handling plant at Cato Ridge.
- Compilation of bills of quantities (mechanical, civil and electrical) for the whole project including the 20-ton to 40-ton crane bay upgrade required by the ingot-casting machine.
- Compilation of tender documents, contracts, and holding site meetings.
- Evaluating of tenders, compiling a financial model and overview. Writing the final report and motivation for project approval by clients' management board.
Construction Site Manager
- Site manager for the construction of an iron granulation plant at Iscor Saldana Steel Works (Cape Town).
- Instrumental in pulling back an eight-week construction delay to only two weeks delay by proper planning and applying the correct construction methods.
- Managed all the sub-contractors and safety aspects of the construction site.
- Commissioning and handing over of the granulation plant.
10/1999–01/2002 Moya Manyi cc Volksrust, RSA
Public Officer
Type of Company: Maintenance and construction
- Co-founder of a maintenance and construction company performing maintenance and engineering construction in the materials handling and power generation fields.
- Contracted to perform and manage the total materials handling maintenance effort at Majuba Power Station (mechanical, electrical and instrumentation).
- Controlled and managed the maintenance budget of several million rand including budgeting on a yearly base.
- Management and ordering of spares and equipment.
- Develop and implemented the maintenance strategies (RCM).
- Failure finding, investigation, and redesign of systems as and when required.
- Maintenance and outage planning.
- Project manager for all the additional construction and maintenance contracts. Managed to win and successfully complete several contracts on time and in budget.
01/1997–09/1999 Majuba Power Station (ESKOM) Volksrust, RSA
Maintenance Engineer and Supervisor
Type of Company: Power generation
- Control and manage maintenance budget (SAP experience).
- Contract supervisor and commissioning engineer for new plant while the power station was still under construction.
- Implementing of maintenance strategies (RCM).
- Materials handling department co-ordinator (maintenance, production, engineering and support functions), giving monthly budget presentations to management on the materials handling affairs and activities.
- Conduct design reviews and implement design changes and modifications.
- Maintenance and outage planning for both minor and major outages.
- Project managed the repair of the coal stacker at the power station after a major accident. Managed to repair and bring back into service the coal stacker within a week after the OEM indicated that repairs would take 4-6 weeks.
- Project managed several repairs on chain conveyors extracting bottom ash from 710 MW boilers without the need to shut down the boiler.
- Instigated and implemented several design changes at the power station.
01/1988–12/1996 Matimba Power Station (ESKOM) Ellisras, RSA
System Engineer (Turbine Plant)
Type of Company: Power generation
- System engineer in charge of 6 x 665 MW MAN turbines.
- Planning and budgeting for major plant overhauls. Compiling scope of work, ordering of spares for outages and repairs and supervising of maintenance activities during outages.
- Fault analysis and performance testing of various pieces of equipment.
- Commissioning of new plant after construction.
- Instrumental in solving a major vibration problem on one of the 665 MW GEC Alstholm generators. Engineering spend large amounts of money in order to resolve and reduce the vibration effects experienced. The origin of the vibration, through methodically eliminating all the possible causes, was found to be caused by the non drive-end, dome of the generator. The dome found to be 13% lighter than the others and exited at its natural frequency caused the vibration. It was changed and the problem solved at a fraction of the cost proposed by consulting companies.
HIGHER EDUCATION:
1993–1996 Pretoria University Pretoria, RSA
- B Eng (Mechanical)
1989–1992 Pretoria Technicon Pretoria, RSA
- National Higher Diploma (Mechanical) – With distinction
- National Diploma (Mechanical) - With distinction
INTERESTS
Cycling, outdoors, and farming.
Referees
Available upon request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2701 to 2750 of 3123)
Go to Search Parameters...
Brief Description
Perform concurrent duties of a project manager which involve the management of several Aramco and non Aramco projects in close coordination with the client and/or his representatives and with the engineering design team
Mechanical Engineer with proficiency in IDEAS, Nastran
A dynamic accomplished Information Technology Professional with unique combination of experience in Networking and Hardware. Strong Analytical, Organizational and problem solving skills. Ability to identify Operational Deficiencies, skilled in applying Technology and Administration practices to impr
Mechanical engineering finite element analysis composites ansys Master's
Time served pipefitter with 12 years experience.
PLANNER SMELTER
Very good exp on Document MAnagement, Administration and Trouble shooting.
I completed my Master in Business Administration, and have more than eight years working experience in the mining industry.
PDMS-11.6, PDS-7.1, Autocad-2006, CAEPIPE 5.11, Pro-E Wildfire2.0
Quantity measurement by SMM7 in my spreadsheet program, BoQ maker, also Project Monitoring in Quantity and Costing.
Experienced Project Controls Specialist in engineering and construction industry. Skilled in project cost, scheduling, analysis and forecasting .
analyst
Skills summary: Gas and Oil Separation Plant (GOSP), Produced Water Treatment Plants, Installation of diesel Engine Power plants, Mechanical construction works such as Piping, tanks, Ducting, structurals, etc.
HE Electrician/Crane Operator with 5yrs. experience
P&PCM, MBA, B.Arch
Seeking a full-time position in Quality Assurance
Junior GIS Specialist ( Mapinfo pro. - Arc GIS .....).. Geologist
Retired PAF personnel having 25 yrs of experience and also remianed as instructor.
I am holding Diploma in Electrical engineering. In total have 7years of experience, 2.5years in Enginnering Industry and 4.5 years in Cement Industry
Currently working as the Service Manager for the CAT dealer in Papua New Guinea, Tabubil branch. There are 56 employees in the service department and the branch takes care of up to 40% of HD PNG earnings.
Degreed Electrical Engineer with Pro/E Wildfire 2.0 and Pro/Cabling training
Sr operations Manager
My 19 years of experience reflect 13 years of project detailed engineering as a Control & Instrumentation Engineer and 4 years in maintenance and upgrade projects in a reliability based environment, applying amongst other the following typical standards and practices: ANSI, IEC, BSA, DIN, API
Piping, PDS, PDMS, PSDS Designer Over 9 years experience in the field of Mechanical, Piping Engineering Design / Drafting and Construction. A variety of successful projects for power, industrial, chemical, petrochemical, oil & gas, refinery, pharmaceutical and cement plants.
7 years engineering and management experience in the oil and gas industry. PMP certified with extensive civil engineering experience.
SAP FICO consultant with 10 years experience
Graduated in the field of Mechanical Engineering and presently working with one of ADNOC Group of companies as a Maintenance Planner / Scheduler (Mechanical). Have been associated with Oil & Gas sector for more than 4 years. Work experience on CMMS and Primavera skills.
A senior cost & controls engineer with extensive experience and a professional qualification in Mechanical Engineering coupled with a strong background in project management,project controls, contracts administration,variation orders &claims management.International experience in large EPIC projects
Electrical Engineering, Computer Hardware, Quality Assurance/Quality Control, CMMS
Seeking Chemist or Laboratory Technician Position-will relocate
Electrical Engineer
I am an extremely well organized, tedious, and hard working individual. I am well versed in directional drilling and, knowledgable in all aspects of the drilling industry. I am
Research Thesis on ANTENNA/RF
Passed Bachelor of Engineering in 2002 and then completed my MBA. I am working as a senior design engineer in Instrumentation & automation field of Larsen & Toubro Limited organisation.
Plant operations supervisor / trainer, remote overseas locations
A hands on Mechanical Supervisor/ Team Leader, with managerial and technical experience, specialising in Rotating Equipment. A total of 20 years spent working for Dresser Rand in the energy conversion business. Additionally, considerable experience in training all levels of the workforce and mgmt.
Manage systems, hardware software, connectivity link, Manage Active Directory,Manage DHCP Serverý
Having good leadership qualities, I can effectively lead and motivate a team. Possesses good inter-personal skill. I value success, which gives me the motivation and drive necessary to achieve personal and company goals. Experience in safety and 5S system implementation
diploma in mechanical engineering
B-Tech (Mechanical Engineering) .Presently working as Scientific Officer in Nuclear Power Corporation of India Limited (Department of Atomic Energy).having experiece in 1.Power production, planning and control of process carried out in the plant. and 2 commissioning of systems
Health, Safety, Environment
Strong knowledge in electronics industries PCB design, assembling, trouble shooting
Professional mechanical/industrial engineer seeking a project engineering managmenet or consulting position. Offer extensive engineering and management skills in the industry.
Piping engineer, pipeline engineer, corrosion engineer, mechanical engineer, project engineer, construction engineer
I am a graduate mechanical engineer with close to 16 years experience in the engineering, maintenance, and project engineering fields; large power stations and also in the oil & gas field. Extensive Maximo computorised maintenance management system (CMMS) experience and worked on SAP for 3 years.
Master of Science in Mechanical Engineering Zone and Energy Manager, Facilities Maintenance Manager
Seven years experienced within the Oil & Gas Industry with Multinational Companies engaged in the EPC of Refineries, Petrochemical and Chemical Process Plants, Gas Plants, Well - Heads, Shutdown piping, Cross-Country and Mountain Pipeline projects, in the specific areas of Commissioning Certificati
Project Management / Lean Training / PFMEA (Process failure modes and effects analysis) / PCP (Process Control Plan) / PFD (Process Flow Diagrams) / Lean Manufacturing / 5S / Value Stream Mapping / Visual Management
HVAC, Maintance
I have been working as a Computer Technician for the past two (2) years. I received eight (8) CXC subjects and BSc. in Electronics and Communications from the University of Technology. I also have two (2) years engineering related experience working with TCom/Huawei Technologies/CLARO.
First
Prev
51
52
53
54
[ 55 ]
56
57
58
59
60
61
62
63
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com