CONTACT INFORMATION:
View contact information...
Job Title: Plant Inspector or Quality Assurance/Control Inspector
PROFESSIONAL EXPERIENCE SUMMARY
Over 27 year's professional inspection experience in the petroleum refining, chemical process and electrical power generation industries. Extensive experience performing American Petroleum Institute 510 inspections on pressure vessels and American Welding Society Certified Welding Inspector, QC – 1 inspections on piping, welding and structural, (steel, hangers, structures) including data reports (R-1's), re-rates, hydrostatic tests, Procedure Qualification Records, Welding Procedure Specifications, welder qualifications, Non Destructive Examinations, fabrication, installation and repairs per ASME, NBIC, API or AWS. Other inspection experience includes vendor surveillance, corrosion monitoring programs, civil and mechanical inspections along with being computer literate- report writing, report reviewing and data input.
PROFESSIONAL CERTIFICATIONS
American Petroleum Institute – API-510 # 5562
American Welding Society – Certified Welding Inspector, QC - 1 # 85040481
Society for Non Destructive Testing –TC-1A Level II – Liquid Penetrant
Society for Non Destructive Testing –TC-1A Level II – Magnetic Particle Society for Non Destructive Testing TC-1A Level II - UT (thickness only)
Texas Nuclear (Positive Material Identification) Class – Graduate- 1998
Radiographic Film Interpretation Class – Graduate- 1990
PROFESSIONAL EMPLOYMENT HISTORY
Longview Inspection Co. Inc, LaPorte, Texas, USA @ Hovensa, US Virgin Islands, St. Criox
American Petroleum Institute API-510 pressure vessel inspector
January 6th, 2005 to present
Inspection of waste heat boiler, Flue Gas Cooler (steam & mud drums, retubing) towers, heaters, wet gas scrubber, regenerator, exchangers, fin fans, pipe and welding during multiple unit T/A's. Report and work order writing, picture taking, computer input and work status tracking.
T C Inspection, Inc. Rodeo, California, USA @ Valero Refining, Benicia, California, USA
American Petroleum Institute API-510 pressure vessel Inspector
3 weeks during October 2004
Inspection of reactors, drums, towers, heaters, piping, flanges, hangers, welding and hydrostatic testing during Hydrogen unit turnaround (Repair & Maintenance). Report writing and computer data input.
Advantage Inspection Inc. Corpus Christi, Texas, USA @ Sunoco Refining and Marketing, Marcus Hook, Pennsylvania, USA
American Petroleum Institute API-510 pressure vessel Inspector
3 weeks during September 2004
Inspection of towers, drums, exchangers, valves, piping, flanges, welding and hydrostatic testing during Ethelyne unit turnaround. Report writing, computer picture input and computer data input.
Nooter Construction Company, Inc. St. Louis, Missouri, USA @ Sunoco Midamerica Refining, Toledo, Ohio, USA
Quality Control Inspector (Night Shift Lead Inspector)
3 months – January 5th, 2004 to April 2nd, 2004
Inspection of new Regenerator head fabrication (including cyclones). Then night shift inspection coordinator for all contractor activities during Fluid Catalytic Cracker (FCC) unit turnaround.
T C Inspection, Inc. Rodeo, California, USA @ Tesoro Refining, Martinez, California, USA
American Petroleum Institute API-510 pressure vessel Inspector
2 weeks during December 2003
Inspection of reactors, towers, drums, heaters, exchangers, piping, welding and hydrostatic testing during Reformer unit turnaround. Report writing and document filing.
Advantage Inspection Inc. Corpus Christi, Texas, USA @ Sunoco Refining and Marketing, Philadelphia, Pennsylvania, USA
American Petroleum Institute API-510 pressure vessel Inspector
4 weeks during November 2003
Inspection of precipitator, towers, drums, piping, welding, hydrostatic testing and drum wallreplacement at repair shop during Fluid Catalytic Cracker unit turnaround. Computer reporting and data input.
G. P. Amerispect, Inc. Pasadena, Texas, USA @ Coastal Refining, Westville, New Jersey, USA American Petroleum Institute API-510 pressure vessel Inspector
2 weeks during October 2003
Inspection of towers and drums in Alkylation unit during turnaround. Report writing.
Wicks and Associates Industrial Services, Inc. Bartlesville, Oklahoma, USA @ Valero Refining,
Ardmore, Oklahoma, USA
American Petroleum Institute API-510 pressure vessel Inspector
1 week during April 2003
Inspection of reactors, drums and exchangers in various units during turnaround. Report writing.
Pro-Inspect, Inc. LaPorte, Texas, USA @ Frontier Refining, El Dorado, Kansas,USA American Petroleum Institute API-510 pressure vessel Inspector
3 weeks during March 2003
Inspection of reactors, towers, drums, exchangers, coke drums, piping, welding and hydrostatic testing. Report writing.
Conam/MMP Inspection, Inc. Signal Hill, California, USA @ British Petroleum, Carson City, California, USA
American Petroleum Institute API-510 pressure vessel Inspector
4 weeks during February 2003
Inspection of reactor and regenerator during Fluid Catalytic Cracker unit turnaround.
Catsi, Inc. Wheelersburg, Ohio, USA @ Sunoco Refining and Marketing, Philadelphia,
Pennsylvania, USA
Lead American Petroleum Institute API-510 pressure vessel inspection coordinator
3 months September 2002 to December 2002
Preparation for and execution of all inspection activities for Sunoco (client) during Fluid Catalytic Cracker unit turnaround. Costing, scheduling, completion status, timekeeping, manpower, report reviewing and computer data input.
COMPANY/LOCATION UNITS CONTRACT COMPANY DATES
Tesoro Refining, Martinez, Ca Reformer TC Inspection 05/02
Sunoco, Philadelphia PA Crude 04/02
Motiva, Port Arther, TX Crude Pro-Inspect 03/02
Ultramar/Diamond Shamrock, CA FCC/Acid/Hydrocracker T C Inspection 11/01 to 02/02
British Petroleum, Carson City, CA Coker Conam/MMP 09/01 to 11/01
Sunoco, Philadelphia, PA Crude Catsi 07/01 to 09/01
Sunoco, Philadelphia, PA Hydrogen Catsi 03/01
Ergon Refining, Vicksburg, MS Various units MQS 02/01
Valero Refining, Houston, TX Crude Petrochem Insp. 02/01
Motiva, Port Arther, TX FCC Pro-Inspect 01/01
Sunoco, Philadelphia, PA Crude Petrochem Insp. 11/01
Marathon Refining, Robinson, IL FCC / HF Advantage Insp. 10/00
Sunoco, Marcus Hook, PA Ethylene Petrochem Insp. 09/00
Sunoco, Philadelphia, PA Reformer Petrochem Insp. 07/00
Sunoco, Philadelphia, PA Lgt.Dist.(HDS) Petrochem Insp. 04/00
Chevron, Richmond, CA Isomax T C Inspection 08/99to02/00
Lyondell Chemical, LaPorte, TX BP Plant 1 Petrospect Insp. 05/99
Tosco, Bayway Refining, Linden, NJ FCC/Crude Petrochem Insp. 02/99to05/99
Chevron, Pascagoula, MS Alky Catsi 02/99
Chevron, Richmond, CA Isomax T C Inspection 01/99
Tosco, Bayway Refining, Linden, NJ Crude Petrochem Insp. 09/98to11/98
Coastal Aruba Refining, Aruba Crude Petrospect Insp. 07/98to09/98
Star Enterprise, Convent, LA H-Oil Lowery & Assoc. 04/98
Sunoco, Tulsa, OK Crude Buck Nowell Insp. 03/98
Chevron, Richmond CA All units T C Inspection 01/98to03/98
Transamerica Refining, Inc All units Raytheon Eng. 08/97to01/98
Tosco Refining, Martinez, CA 7 units Buck Nowell Insp. 01/97to03/97
ARCO Chemical, LaPorte, TX BP Plant 2 Base Line Data 09/96to11/96
Citgo, Corpus Christi, TX Platformer Base Line Data 04/96
LaGloria Oil & Gas, Tyler, TX Alky Alltech Insp. 03/96
Total Refining, Ardmore, OK 6 units Catsi 01/96
1990 to 1996 turnaround inspection positions at various refineries for contract and construction companies.
1988 to 1990 Outage inspection positions at nuclear and non nuclear electric generating stations.
1976 to 1988 Construction inspection positions at various nuclear electric generating stations.
EDUCATION
Graduate of Merrimack High School – 1974 Merrimack, New Hampshire
References
Available upon request
View contact information... |