CONTACT INFORMATION:
View contact information...
TEL. NO.: 002026213621
MOBILE: 0020102519018
Date & place of birth: 18 March 1967, Cairo, Egypt
Nationality: Egyptian
Military Service: Completed
Marital status: Married
Educational Background:
Degree: Bachelor Degree of Civil Engineering (1991). Ain Shams University
Grade: Fair
Project: Survey
Project Grade: (V.GOOD)
PROFESSIONAL EXPERIENCE:
COMPANY: DHABI CONTRACTING EST. (March 2003 till Aug. 2004) – Project Cost 247 million DH
Location: Dubai
Project: Telecommunications & Administration Building in Dubai - U.A.E
Consultant: SHANKLAND COX LTD.
Management: DYWIDAG
Position: Senior Project Engineer (Jan. 2004 till Aug. 2004)
Responsibility: Responsible for
* Planning and monitoring of site activities.
* Co-ordination among sub-contractors.
* Co-ordination between Civil Department and the MEP (Electro mechanics).
* Dealing with QA & QC engineers.
* Contact with the technical office manager for solving execution problems.
* Control the whole manpower which is over than 400 (Carpenter, Steel fixer,
Mason, Helper, Drivers, Operators, Store keeper)
Project: 4 Residential Buildings in Abu Dhabi - U.A.E
Position: Site Engineer (March 2003 till December 2003)
Responsibility: Responsible for execution of one building.
Raft Foundation, Skelton, Block Work, Interior Plaster, Paintings, Water Proofing,
Anti-fungus painting, Curtain Wall, Aluminum Cladding, GRC Cladding, False
Ceiling, Gypsum board, Gypsum Cornish, Ceramic flooring & Cladding, Granite for
Facade, Granite for Steps
COMPANY: UPPER EGYPT (Dec. 2001 till Feb. 2003)
Position: Technical Office Manager
Responsibility: responsible for management of the company projects which is:
* Marlin Beach resort in sokhna.
* Elzaytoon Towers.
* Villa in Abu Sultan.
* Villa in Agamy Beach
COMPANY: work as a contractor (March 2000 to Nov. 2001)
* Execution of 4 patrol stations with CALTEX - project capital cost 1000000 L. E
* Some extension works in Nasr City with Pepsi cola international - project capital
Cost 250000 L. E
COMPANY: UPPER EGYPT
Elzaytoon Towers "area 3500 m2" (Nov. 1998 to Feb. 2000)
The project consists of three towers 13 floors each.
Position: Project Engineer
Responsibility:
* Supervisor all surveying works using theodolite & leveling machines.
* Excavation works.
* Shop drawings for concrete dimensions using AutoCAD
* Shop drawings for reinforcement details using AutoCAD
* Preparation of bar bending schedule
* Erection of formwork
* Supervision of concrete placement at site
* Control the quality of concrete
* Preparation of working drawings
* Supervision of masonry works of one tower.
COMPANY: INTRADE
1. Extension works in AFECO FRAM "area 400 m2" 10 of Ramadan city (Sep.1998 to Oct. 1998)
Responsibility:
* Execution of concrete works; isolated footings, columns, solid slabs for the
Ground floor.
* Execution of finishing works; brick, masonry, plaster for facade, interior
Plastering, paintings, fair face concrete flooring, cement tiles for roof, steel works
For doors & windows, water insulation, water supply works, sanitary works &
Electricity works.
2. Extension works in International American School in Egypt - Ismaiilia road (July 1998 to Aug. 1998)
Execution of the extension over 1800 m2
Responsibility:
* Execution of concrete works; columns, hollow block type slabs
* Execution of finishing works; block work, plaster for facade, interior plastering, paintings, Flooring like granite for stairs, different types of tiling, carpentry works for doors, aluminum works For windows, water proofing, water supply works, sanitary works & electricity works.
3. Two Residential Buildings in Heliopolis (Oct. 1997 to June 1998) as a technical office engineer
Technical Office Engineer: contract review, time schedule, & preparing of work procedure for Different items & arrangement among sub-contractors & quantity surveying and preparing of Subcontractor's payment using Excel program
4. Music Building in IAC (June 1997 to Sep. 1997) as a site engineer
The project consists of four floors on 280 m2 each.
Responsibility:
* Execution of concrete works; isolated footings, columns, solid slabs.
* Execution of finishing works; block works, plaster for facade, interior plastering, paintings, Flooring like granite for stairs, different types of tiling, water proofing, sound insulation, water Supply works, sanitary works & electricity works, wooden doors & aluminum windows.
Company: The Egyptians For Contracting & Industries.
NASR City Trade Centre "area 2400 m2" (Aug.1996 to May 1997)
The project consists of four zones A, B, C, D - three underground floors - six up ground floors
Responsibility:
* Time scheduling.
* Preparing the shop drawing for the whole project
* Quality controller.
* Finance management.
Company: KATO
KATO INDUSTRY "Area 25 Fadden "6th of October City (Dec. 1995 to July 1996)
The project consists of 5 steel structure factories.
Responsibility:
* Supervisor all surveying works using Total Station machine.
* Excavation works for all factories.
* Execution of concrete isolated footings for 3 factories.
* Execution of concrete short columns for 2 factories.
Company: INTRADE
1. Alragaa Factory for clothing " area 600 m2 " 10th of Ramadan city (Sep. 1995 to Nov. 1995)
* Erection of concrete skeleton of the building (Ground floor, 1st floor, 2nd floor)
2. International American School in Egypt -- Cairo Ismaiilia road (April 1995 to Aug. 1995)
* Gymnasium Building 1400 m2:
Execution of concrete works; isolated footings, columns, solid slabs.
Execution of finishing works; block work, plaster for facade "artificial stone plaster ", interior Plastering, paintings, flooring like marble, granite, different types of tiling, water proofing, water Supply & drainage works, ceramic cladding, ceramic flooring, wooden doors & aluminum windows.
* Theatre Building 900 m2:
Execution of concrete works; isolated footings, columns, inclined flat slab with the steps.
3. Daltex Chiller - Kafre Elzayat (Dec.1994 to March 1995)
* Execution of fair face concrete flooring inside the chillers.
4. International export centre - Cargo Village " Area 13 Fadden " (Sep. 1993 to Nov. 1994)
Responsibility:
* Time scheduling.
* Erection of concrete skeleton of three service buildings.
* Finishing works for the whole project: water proofing, block work, plaster for facade, interior
Plastering, painting works, flooring like fair face concrete, ceramic, epoxy mortar flooring,
Landscape works
TRAINING COURSES
(1) Surveying course at Survey Department_Ain Shams University.
(2) Computer programs: Excel, AutoCAD & WinWord.
(3) English courses for TOEFL at American college.
View contact information... |