A. Al - Suwaidi Industrial Services Co.
Jubail, Kingdom of Saudi Arabia
April 1, 2002 - October 30, 2002

Worked with Kemya Petrochemical Co.
as Mechanical Project Superintendent at LDPE Plant Located at Jubail, K.S.A.

Duties and Responsibilities:

1. In charge of all Mechanical Works based on M.O.C. (Management of Change) issued by the Client.

2. Holds Coordination Meeting daily with the client regarding the status of the jobs.
3. Establishes E.R.P. (Equipment Requirement Program) and M.R.P. (Manpower Requirement Program).

4. Reports to Project Manager regarding the daily update of the project.

5. Prepares and follows-up equipments, tools and materials / consumables required for the project.

6. Prepares Cost Estimates based on R.F.Q. (Request for Quotation) issued by the client.

7. Organizes daily Safety and Toolbox Meeting.

8. Prepares Construction Method Statement prior to the start-up of work.

9. Reviews all critical lifting procedures prior for submission to client for approval.

10. Over all in charge on every discipline.

B. Plant Engineering Construction Private Ltd, Co.
21 Shipyard Road, Singapore
November 8, 2000 - November 7, 2001

Worked with Exxon-Mobil Chemicals as
Piping Supervisor for various projects at Singapore Olefins
Plant (SOP), in Jurong Island, Singapore

Duties and Responsibilities:

1. Fully in-charge of all piping works based on (M.O.C.)
Management of Change issued by Exxon-Mobil.

2. Supervises several tie-in works such as HOT TAPPING,
COLD TAPPING around the plant.

3. Makes sure the system is constructed as per specs.

4. Conducts daily Toolbox Meeting with alliance partner.
Secures work permits & conducts Job Safety Analysis
(JSA) & the Client regarding Talk Action Knowledge Equipment (TAKE-2) steps before starting the job.

5. Holds Coordination Meeting daily regarding the status of the job.

6. Prepares Construction Method Statement ( CMS) whenever there is a window for shutdown of equipment for the tie-in works.

7. Over-all in charge of the project including E & I, Insulation Works,
Scaffolding Works, Painting & other related jobs.

C.Titan Project
Pasir Gudang, Johor Bahru
Malaysia
June 19, 1998 - Feb. 1999
Assistant Site Manager/Erection Supervisor
ABB Power Generation Ltd., Australia
Boiler Installation Project

Assigned as ABB (Australia) site representative
In the construction of two (2) site assembled, supplementary Oil
Fired Modulated Force Circulation Heat Recovery Steam Generator
(FCHRSG), each rated 83 Ton/ Hr, at a pressure of 43 BAR and temperature of 400°C each connected to a Gas Turbine (GT) 10.

Duties and Responsibilities:

1. Ensures that the plant is constructed in accordance with the
ABB Power Generations requirements.

2. Site management and coordination with sub-contractors.

3. Management and coordination of resources to ensure program of work is achieved.

4. Represents ABB Power Generation in a day to day interfaces with the client and ABB Power Generation's sub-contractors on reporting, etc.

5. Authorized to purchase from the site equipmenst/ goods/
services in accordance with ABB Power Generation Procedure QA-09 Purchasing.

6. Authorized to control further processing until the deficiency or unsatisfactory condition has been corrected.

D. PIC/BLACK and VEATCH INTERNATIONAL TURBINE INSTALLATION PROJECT
Kapar, Malaysia

Oct. 31, 1997 to Dec. 14, 1997
May 2, 1998 to June 1, 1998

MECHANICAL QA/QC ENGINEER

Assigned as Mechanical QA/QC Engineer during the construction of Two (2) Units Phase 3- 500MW Power Plant.

Duties and Responsibilities:

1. Focused mainly on clearing several systems on Turbine Hall which involve Pneumatic Tests on the following items:

Instrument/Plant Air Lines

Condensing and Condenser Extraction Lines

Boiler Feedwater System

High Pressure / Low Pressure Heater

Drain / Vents Lines

E. POWER INDUSTRY CONSULTANT (PIC)
ATLANTA, GEORGIA, USA
INDOKODECO CEMENT PLANT PROJECT
SOUTH KALIMANTAN, INDONESIA

May 1, 1997 to October 17, 1997

BOILER PROJECT CONSULTANT

Worked with PT ABB Energy System Indonesia with the following duties and responsibilities:

1. Over-all in-charge in the installation of 55 MW Coal-
Fired Power Plant.

2. Make sure the plant is constructed as per ABB
Specification.

3. Conduct daily coordination meeting with the contractor on the daily update of the project.

F. JAMJOOM WESCON SAUDI ARABIA CO. LTD,
RABIGH, KSA
August 1993 - August 1995

BOILER MAINTENANCE SUPERVISOR

Assigned at Petromin-Petrola Refinery Company to supervise the maintenance of the following equipments:

* Four Gas and Oil Steam Boiling Plants having a capacity of 65 tons/hr of steam.
* Waste Heat Boiler for Sulfur Units
* Equipments such as Air Fin Coolers, Heat Exchangers, and other pressure vessel such as Condensers and Deaerators

G. ENGINEERING EQUIPMENT, INC.
AL-TAMEER / BECHTEL PROJECT, KUWAIT

December 1991 - December 1992

BOILER / PIPING INSTALLATION SUPERVISOR

Assigned in oil gathering center for the refurbishment of oil and gas separator plant.

Duties and Responsibilities:

1. Secures work permits before starting the job.

2. Prepares daily accomplishment reports.

3. Supervises the Commissioning of BERTH 10 and the Installation of Air Heaters and Air Fin Coolers at Mina Ahmadi Refinery, KUWAIT OIL CO.

4. In-charge of the Installation of 12" Crude Oil Line from Wafra to the Crude Oil Desalting Unit at Mina Abdullah Refinery.

H. ENGINEERING EQUIPMENT, INC.
AZZOUR SOUTH POWER PLANT PROJECT
AZZOUR, KUWAIT

November 1984 - August 1990

BOILER INSTALLATION SUPERVISOR

Duties and Responsibilities:

1. Performs all remaining outstanding punchlist items particularly on mechanical and instrument panel locations, and local devices based on actual site condition.

2. Prepares monthly status reports on completed and remaining outstanding items.

3. Prepares and monitors daily work schedules and secures work permits.

4. In-charge of the Installation of Boiler Pressure Parts such as water panels (front, rear, and side wall), economizer elements, superheater elements and Downcomers for Eight (8) - Units 300MW CE Mitsubishi Boilers.

5. Oversees Pre-assembling and Fitting of Main Piping such as High Pressure Steam Air and Gas Ducts, Boiler Frames, Boiler Casing, Buckstays for Units 1,4,7 and 36" Piping Desalination Plant.

I. ATLANTIC GULF AND PACIFIC (A.G.&P.)
HONIRON DIVISION, PORT AREA, MANILA

April 1982 - November 1983

PROJECT MONITORING

Duties and Responsibilities:

1. Monitors the Installation of Four (4) Quadruple Effect Evaporators in Pampanga Sugar Development Company (PASUDECO) in San Fernando, Pampanga.

2. Controls and supervises daily work schedules, prepares weekly reports including cost consumed per week, submits weekly reports to head office every weekend.

3. Assigned at A.G.& P. Head Office and estimates costs for every project, prepares PERT/CPM and Bar Charts per project.

4. Assigned as Boiler Maker Leadman for the Installation of Two Babcock and Wilcox Boilers having a capacity of 76,000lbs/hr steam at Phil. Petroleum Corp., in Pililia, Rizal.

5. Cleaning and re-aligning of steam drum and mud drum.

6. Installation of frames and boiler casing

7. Assigned as Boilermaker for the Installation of Takuma & Keeler Boilers having a capacity of 150,000 lbs/hr and 75,000 lbs/hr of steam at Binalbagan Isabela Sugar Co., Inc., Binalbagan, Negros Occidental.

8. Assembles and fits boiler tube ends, fabricates and installs Air and Gas Ducts for Keeler Boiler.

9. Conducts Hydrotesting for Keeler Boiler.

BIO -DATA

Personal Data:

Age: 46 years old

Date of Birth: December 17, 1956

Place of Birth: Binalbagan, Negros Occidental
Philippines

Height: 163 cm

Weight: 69 kg

Civil Status: Married

Spouse's Name: Bernadette M. Suarez

Citizenship: Filipino

Profession: B.S. Mechanical Engineering

T.A.N.: 8642-168 H

Educational Background:

College: FEATI University
Sta. Cruz, Manila
: Western Institute of Technology
La Paz, Iloilo

: La Salle College
Bacolod City

Course: Bachelor of Science in Mechanical
Engineering

High School: Hinigaran High School
Hinigaran, Negros Occidental

Elementary: BISCOM Elementary School
Binalbagan, Negros Occidental


References will be provided on request.

SEMINARS ATTENDED:

1. Team Building Seminar EEI-EHI Azzour Project, Kuwait 1985

2. Boilermaker and Training Seminar EEI. Bo. Ugong Pasig, Metro Manila

3. First Aid Course Al - Tameer, Kuwait, 1992

4. Safety Orientation Course Singapore, February 4, 2001

5. Quality Assurance Training Singapore, August 15, 2001

6. Operations Integrity Management Practices OIMP Singapore February 13, 2001

7. Operations Integrity Management Practices OIMP Kemya Petrochemical Plant, July 10, 2002

View contact information...
«« previous resume next resume »»
Search Results (Resumes 301 to 350 of 3118)Go to Search Parameters...
Brief Description
CAD Drafter with 14 years of experience in most commonly used software for Architectural and Civil Engineering Firms.
22+ years of professional knowledge and experience in QA/QC Engineering and Field Civil Construction on EDPC onshore oil/gas/petrochemical plants, defense, infrastructure projects in the Middle East, UAE, Iran and North Africa.
Engineering/Management professional offering expertise in domestic and international construction management and engineering support. Demonstrated proficiency in managing schedules, budgets and personnel for multiple projects with an emphasis on profitability in a variety of environments.
Licensed Civil Engineer with BS degree in Civil Engineering; over 20 years experience in Land Surveying and Civil Engineering in government projects (irrigation, dam, reservoir, roads), construction and surveying firms in the Philippines and abroad.
HNC Qualified Engineer with an extensive experience in a broad cross-section of engineering, predominantly structural/mechanical civil/building services, familiar with all aspects of project management. I.e. planning, cost control, tender evaluations, contract law, health and safety.
I have over 35 year's experience in the Cement Industry, Machinery Manufacture, Refractory Technology, Large Projects Execution and Commissioning,
Over 25 years of experience of which have more than 15 years of experience in Developed Countries.
ELECTRICAL-MECHANICAL TECHNICIAN CONSTRUCTION – INDUSTRIAL & MANUFACTURING OPERATION & MAINTENANCE – COMMISSIONING – CONTROLS – LO-MED-HI VOLTAGE ELECTRICAL INSTALLATION & MAINTENANCE – HVACR – WATER AND WASTEWATER TREATMENT PLANT.
Has twenty one (21) years of experience in the Field of Engineering, Design and Construction. Experienced in Front End Eng’g, Preliminary Eng’g & Detail Eng’g / Design Phase Work-share Execution, and Construction / Final Design / Eng’g Support for Construction / As-built Phase & Quantity Surveying.
CAD Technician
Free! Experienced Project Manager, Divisional Manager, with a proven track record of success in Construction, Interiors and Finishing works. MEng Degree Mechanical Engineering, ILM level 5 Diploma in Management,CITB Appointed Persons.IOSHI Certified.B S Construction Health and Safety
Skill : Computer microsoft office, Auto CAD, GPS application and Mapping
Survey and layout subdivision lots for rural and urban development and established and marked legal boundaries of properties using different kinds of surveying instruments.
A highly motivated technically superior supervisor/ senior engineer who works especially well as part of a team. Seeks employment with emphasis on continual professional development.
Twenty six years of experience as Chemical Engineer working on different facilities, on Production, Power House, Operation, Commercial, Safety, Hygiene and Environmental Control Departments.
Fire Protection design with construction experience in installation of fixed fire protection systems. Possess in-depth expertise in the bid criteria, layout, hydraulic design, estimating, sales, contracting, installation, repair, inspection and testing.
Sub : Application for the post of Project Manager
My experiences in the field of mechanical mostly covered construction/maintenance of power plants and oil/gas/petrochemical plants. Pls. see attachments.
I have done bsc in civil engineering and have an experience of 20 years in it.
Highly organized, efficient, presentable lady with excellent computer skills, with over 9 years proficient experience gained in the field of Engineering, which includes proper Interfacing or coordination within the projects, also assigned and assist Proj. Manager in all documentation and supervision
Welding Engineer / Welding Inspector
10 experiences in construction field
I’ve done a lot of projects in the past 21 years. My past experiences have typically been in 24 hr/day industrial plants including pulp & paper, Alcoa, and several utilities. I can handle any part of the project from concept to start-up.
More than 25 years experience in electrical field and overseas on-shore,off-shore oil/gas projects in construction,commissioning,preservation,maintenance,training/very good communication skills:English-Russian fluent,French-Italian good level.
Work as Senior Civil engineer in all aspect but mostly in Quality control and Materials control
I am a self employed, highly motivated and innovative Engineer. I have much experience in the management of projects for the construction of Rail Equipment plants, Aircraft Facilities, Paper and Steel Mills.
Structural Design Engineer
Experienced IT Administrator / Technician. Help Desk support and project implementation in a fast paced corporate environment.
Application of E&M Site Engineer / Manager
Inspection, QA/QC, Welding Inspection, ISO Auditing, Pipeline
Quality control or administration on about steel structure and pressure vessels.
Senior Cost and Planner Engineer
Application For The Post Of Electrical and Instrumentation in Project Engineering
M.Tech., Expertise in Electrical & protection
Engineering degree with experience in Construction of Petrochemical, Gas Plant and MODU (Jack-up and Semi--Submersible) in the field of Piping, Welding and Painting
I have 15 years plus supporting mechanical engineering as a 3D Solids/ 2D CAD Draftsman
Expecting a challenging and dynamic career in Civil/Quality Control and Quality Assurance where I can apply my knowledge and development skills.
Experienced Certified Engineering Geologist. Perceptive, creative problem solver. Computer literate. Effective communicator. Undaunted by remote operations. US and Australia resident.
A licensed Civil Engineer, organized individual, goal oriented, committed to responsibilities, affable person, self motivated, determined and a God fearing person.
I have 12 years of experience in different Civil Construction project such as Container Terminal with Jetties, Heavy Industry, Cement Factory, Textile Mill, High Rise Building etc. During my service period I was responsible for Preparation of Tender, Tendering, Supervision, Planning, Estimating etc.
Structural design and supervision
Knowlegle in the field of civil and structural engineer
Experienced Land Surveyor (Geodetic Engineer/Surveyor)
HVAC ENGINEER HAVING 5 YEARS EXP IN MIDDLE EAST
NACE CERTIFIED COATING INSPECTOR WITH 8 YEARS OF COATING EXPEREINCE
diplamo electronics & communication engineer
Civil Structural Engineer
Civil/metal structure engineer from Russia. Designing of of oil refinery and petrochemical enterprises. Languages: english-communication (IELTS 6.5).
I did M.tech in Structural Engineering and i have the knowledge of STAAD-Pro2003,AutoCad2004,MSofficeetc.
Objective Seeking to advance my professional career in the international arena of constructionmanagement. Open for relocation to most any international project.
First   1   2   3   4   5   6   [ 7 ]   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com