June15,1988–    
Erdem Dis Ticaret A.S. Istanbul/TURKEY
MANAGER of GLASS MANUFACTURING PLANTS

Reporting to Group Owner, he managed 200-250 employee plants producing automotive architectural,and applience safety glasses .He was responsible for production ,sales and customer relations,new investments and cost control.

Under his management, in 1988 newly established plants acquired approximately 40 % of the OEM market in 3 years with trade marks TEZCAM and TAMCAM and the percentages are almost the same nowadays. The competitor group , Sise-Cam ,which is monopoly in float production and supported by Isbankasi ,has the rest of the percentage .The group supplied glass to almost all OEM’s in Turkey (Fiat, Renault, Ford, Isuzu, Chrysler, Mercedes are the main ones) and Dogus Ltd. which is the largest aftermarket glass distributor .

He managed to get ECE R43 approval as the first manufacturer in Turkey through Utac/France in 1990 even before Sise-Cam Group did. The plants acquired ISO 9002 and QS 9000 in 1994 and in 1998 respectively.

The groups total annual turnover was approximately 50 million US$ including other types of glasses ( building, kitchen appliences etc.) and glass trading.

Almost in every year during his employment he made new or modernization investmens according to the market demands. He attended glass machinery fairs every year and found most recent machinery and equipment and bought from the best machinery suppliers with least prices together with group owner.

The companies he had business relations are SIV (Vertical Bending. and Tempering, Horizontal Complex Bending and Tempering), Tamglass (Horizontal Bending and Flat Tempering, Laminating), Uniglass (Horizontal Flat Tempering) ,Glassrobots (Laminating Lines), Cougher(Printing Lines), Bavelloni(Double Edgers, Washing Machines), Lisec ( Insulating Glass Lines), Bottero ( Automatic Glass Cutting, Grinding lines , Double Edgers ), Cannon/Italy ( encapsulation plant) and many others.

Lately he managed the investment of a new architectural and kitchen appliances plant , to separate physically the manufacturing of automotive and other safety glasses , and a mirror production line from Kloepper which can produce 2 million sq.m of mirror ,in addition to his regular duties .He applied MS Project as project managing software. The new plant consisted of 18000 sq. m closed area with a 6 million US $ new machinery added to 25000 sq.meter closed area existing plant which produces only automotive glass from then on . The capacity of the new plant is 2 million sq.m of safety glass per year. The capacity of the existing plant is 500000 car sets per year.

July1,1982–June14,1988    
Efes Pilsen Breweries Istanbul /TURKEY
PROJECT MANAGER

He was employed by the Efes Pilsen Breweries ,which is owned by AEH (Anadolu Industrial Holding) ,as the Project Manager of an at that time planned new Brewery in Ankara and moved Istanbul for only one year to complete the projects and purchase of the machinery and return back to Ankara to realise the investment. But , the investment was postponed by the board of directors of the Group. Instead, they decided to extend the existing three breweries in Istanbul, Izmir and Adana. Therefore he stayed in Istanbul and realised these extension projects . He worked in close cooperation with the Managers of these three existing plants , but all the project preparation and purchasing of the equipment have been realised by him centrally , with the help of german advisors.In the last two years in AEH Group , he worked as technical director of TAF and SEFAS companies which were overtaken by AEH Group.The first company was dealing with manufacturing and exporting of detergents, the second manufactured fluted cartoon packages.Both companies were founded initially by the same owners on the same area.Later , since the owners could not pay back the export pre-financing credits taken from Annex Co. which was fully owned by AEH, most of the shares were given to AEH and a three members committee in the name of AEH started to manage both companies . He was one of the members who was responsible for production and exporting of detergents and production of fluted cartoon packages. In that two years , the production capacity of detergent plant was doubled and 18000 tons of detergent was exported to Algeria. Fluted cartoon plant was run very effectively too, most of the production was sold in Turkey. One of the members of the board of directors of AEH was the owner of the safety glass manufacturing group mentioned above and he needed a company manager , and since AEH Group had difficulties at that time too, he accepted the offer of the member and transferred tothe glass manufacturing group as Glass Manufacturing Plants Manager.

Sept.1980–June30,1982
Taksan Machine Tools & Manufact. Co Ankara/TURKEY
PROJECT MANAGER

Taksan was establishing an integrated Machine Tools Manufacturing Factories complex in Kayseri/Turkey under licence of WMN/East Germany and TOS/Czechoslovakia companies at that time. The total investment amounted 500 million US $ and consisted of mainly one foundary, one central gear and gear boxes, one milling and boring machines ,one automates ,and one grinding machines plants with 120000 sq.m. closed area. He was employed as Project Manager of Milling and Boring Machines Plant. Under his management , plant lay-outs were prepared, machinery and equipment were provided, buildings and auxiliary facilities were completed and trial production was planned. He quitted Taksan on June 30,1982 and joined Efes Breweries Group of AEH.

March ,1977–Sept,1980     
Tustas Ind.Establishments Co. Ankara/TURKEY
CHIEF MECHANICAL ENGINEER

Tustas offers mainly engineering and conculting services to industrial establishments. During his stay in this company he worked for the investment of Divrigi Pelletizing and Concentrating Plants for iron ore which belong to state owned Iron and Steel Works Co.Under his management, the native made equipment were designed ,contracts awarded, installations were controlled and acceptance tests made.

Nov.,1973–March,1977     
Metag Consulting &Engineering Co. Ankara/TURKEY
CHIEF MECHANICAL ENGINEER

He started in Metag as design engineer ,after he returned back from Germany to finish his Master studies, since it was possible to work during M.S. studies.In this company he worked mainly for Cinkur which was a mining and metallurgical company and was in investment phase at that time.His duties consisted of design and procurement of locally provided equipment according to rough specifications prepared by companies Canadian SNC , West German KHD which were responsible for the process and know-how of the whole project.On June , 1975 he quitted Metag to prepare his M.S. thesis and afterwards to complete his military service.On July 1,1975 he finished his short term military service as reserve officer and during the service, he attended the thesis jury and qualified to gain his M.S. degree on July 22, 1975.After completion of the military service, on October23,1975 , he worked in Metag Co. again, this time as Chief Mechanical Engineer and worked for and finished the Lead Plant projects of Cinkur.

Oct.1,1971–June 30,1973
Richard Hofheinz & Co      Solingen/GERMANY
DESIGN ENGINEER

On Oct. 1,1971 , he quitted Kronprinz A.G. on his own wish , and started in the design office of Special Machine Tools section of Richard Hofheinz und Co. company. In this office he worked for developing and designing of half automatic, multihead ,special tool machinery which ordered by customers (e.g. car manufacturers) , and capable of producing the same pieces in big quantities ( 20000 ,30000 pieces per year).He worked there until June 30,1973 and return to Ankara to start his M.S. studies, since the permission of the University was expired.

Apr.1,1971–Oct.1,1971    
Kronprinz A.G.      Solingen/GERMANY
DESIGN ENGINEER

As will be seen in the following education section, in October 1970 he started his M.S. studies, however in Spring 1971 the studies were interrupted due to student movements at that time. With the permission of the Mechanical Engineering Department of the University , he started working in Kronprinz A.G. Solingen /Germany , in order to gain professional experience and to learn German language on April 1,1971.Kronprinz A.G. was one of the biggest in its field in Europe which mass produced tire rims for automotive industry OEM .He worked in the design office to develop and design of an automatic welding machine which would be used in new production line of tire rims.

EDUCATION

1973–1975    
Middle East Technical University     Ankara/TURKEY M.S. in Mechanical Engineering from Mechanical Engineering Department of Engineering Faculty with a g.p.a of 3.00 .

1965–1970
Middle East Technical University     Ankara/TURKEY
B.S. in Mechanical Engineering from Mechanical Engineering Department of Engineering Faculty with a g.p.a of 3.02 .
(He attended english language prep school before the studies)In October 1970 he started his M.S. studies , however in Spring of 1971 , the studies were interrupted due to to student movements.As seen above, he took the advantage and started working in Germany.

He attended primary , secondary and high schools in Ankara and was graduated from Ankara Ataturk High School in June 1965.

INTERESTS AND SKILLS

Computers, internet, tennis (playing , watching ,and following the events), football,music.

He is a very experienced PC User. ( Exel, Word, MS Project , Autocad etc.)

He speaks English and German very well.

PERSONAL DATA

He was born in 11/01/1948 in Manisa / Turkey.

He is married and has two sons 23 and 17 years old.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 3092)Go to Search Parameters...
Brief Description
Professionally qualified and highly experienced Electromechanical Design/Senior Project Engineer offering over 26 years experience in the design, project management, installation, commissioning and maintenance of HVAC systems and associated electrical and control equipments.
15 years of working exp. looking for a change, having expertise in HVAC (chillers and chilled water system) and other mechanical system installation and commissioning, presently working in nigeria as a project manager.
Electrical Engineering. Hardware Design. Hardware/Software Testing. Hardware/Software Troubleshooting.
I have experience in procurement of contractors and consultants, contract administration using FIDIC conditions of contracts and highway designs. I have more than 15 years total experience in above fields.I can therefore engage as a project manager of a road and bridge project.
Senior Designer (Architectural)
I have more than 13 years Experience in Construction& Supervision of Highway& Road way
Experienced Project Manager and proficient with AutoCAD, MS Word, MS Project, MS Excel, MS Powerpoint. Familiar and follow industry standards of the FDA, USDA, PHARMACEUTICAL and OSHA requirements. Experienced with real-time PMP methods.
I am currently employed within local goverment as a Roads Inspector. I have been employed in this position for nearly 5 years. I worked my way up from a maintenance road worker and have many years of skills and expertise in this field.
An extensive career having an experienced blend of commercial and construction credentials in the engineering/infrastructure field including civil and mechanical engineering works involving co-ordination of consultants, contractors & public utilities, managing deadlines and optimising costs
A professional with 24 years of multi-functional & multi-ethnic/culture experience in Technical and Project Management areas. Experienced in handling multi projects, excellent communication skills & man management capabilities, team building, business road mapping, problem solving abilities
Detailed Structural designs of Civil Structures(RCC structure i,e, Buildings(Multi-storied office and residential), Roads, Bridges, Culverts, earth retaining structures(Retaining wall), Dams, rig & machinery foundations for Gas exploration
Presently working as Site Supt. Civil here in the construction of Khursaniyah Gas Plant (KGP) at NGL Trains 1 & 2, Saudi Arabia with Saudi ARAMCO. Representing the client in all civil works aspect of the work, I supervise two (2) major contractors-Bechtel/Technip Joint Venture.
I am confident and Expert; I am having 14 years experience with FIDIC contracts Worked on projects of Infrastructure Projects, Highway Roads, Bridges, Underpasses, Mechanical, Electrical, Water Work, Strom Water, Sub base Drainage, and Irrigation system, Construction of soft and hard Landscaping
Structural design of Post Tensioned Concrete Bridge, RCC High Rise Building, Tunnel, Highway Interchange Structure. Familiar with AASHTO LRFD, BS, ACI. Skilled in finite element softwares (MidasCIVIL, SAP, STAADPro, SAM-LEAP5 and AutoCAD). Specification, Report, AIP writing.
Free! Dear Sir untill now I have more than 9 years experience in construction, conversion & repair of the Supply Vessels, ULCC tankers, Tug Boats & Jack Up Drilling Rigs. 6 years experience as Project Engineer. Currently I work at the position of the Project Coordinator in ship repair.
Three years diploma in Civil Engineering (Technical Education Board of Punjab Pakistan)
Dependable, motivated and organized hard worker who learns new procedures quickly, and meet schedules
Electrical estimator in industrial and commercial construction. Proficient in WinEst and Excel.
MEP Professional Engineer with advanced Management Knowledge For High Rise Building
I have 20 years of experienced in the field of Quality Control, Material Engineering and Construction Supervision in Heavy Construction such as: PetroChemical industries, Pipelines, Infrastructure, Highrise Building, Commercial Mall, Sewage Treatment Plant, Pumping Station, Milk Processing Plant etc
Extensive experience in project mgmt, tool,fixture, & machine design
I am having vast experience (22 Years) in Maintenance & Projects and in diverse fields. I am suitably qualified (BE, ME, PGDM, PGDIT) to take up any challenging assignments across the globe.
Civil Engineer. Management in RCM Reliability centred Maintenance.
Electrical engineer - building electrical design and rapid transit systems; proposals and specifications; CAD.
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
I have masters in Water Resources Management followed by Bachelor of Engineering. Skills in Construction management,people management,sub conatractor mangment,quality control,health and safety
A result oriented and self-motivated M.Tech Civil Engineering Professional with over 18 years of rich & qualitative experience in Project Management, Civil Engineering and Construction Management of infrastructure projects including Airport Terminals, Buildings Roads and Flyovers.
Engineer Graduate with 09 years experience in Automotive Field as Sales ,Warranty, Technical Engineer
HEALTH, SAFETY & ENVIRONMENT SPECIALIST WITH 20+ YEARS OF EXPERIENCE
Senior structural engineer with 15 years experience. National Diploma (Civil Engineering)Bachelor of Technology (Structural)
Auto Electrical / Mechanical/ heavy vehicles, Cat, Deutz, Comatsu, Man, M/Benz, Feul rail engines, Airconditioning, Hydraulics, Electrical repair on all types of vehicles, Mining vehicles.
APPLIACATION FOR THE POST OF JUNIOR CIVIL ENGINEER.
I am a creative civil engineer and construction inspector, with diverse multi disciplinary experience in reinforced concrete, pre-stressed concrete, precast concrete, structural steel and timber construction. I am well versed with all aspects of project management from inception to completion.
Welding(certificates). Electrical, mechanical, hydraulic and pneumatic equipment, installation, (30MPa certificate). Workplace Safety & Health field (Certificates). Staff training and retraining. Drawing and reading blueprints and schematics. Robotics. Repair. Maintenance. Management. Sales.
A specialist in rock mechanics and engineering geology. 26 years tunnelling and mining experience. Expertise in stability analysis, support design and monitoring; blast design and optimisation; TBM and road header performance; risk analysis.
I am an experienced AutoCAD operator / draftsman with expertise on mechanical, structural, civil and electrical drawings, using Autocad 2009. I have eleven years of extensive hands-on work experience in a manufacturing as well as construction set-up.
Installation of electrical pipe,electrical wiring,electrical controls,electrical panel board.Installation of main over current protection,lightings,switches.Banking of transformers and splcing of wires.Installation of A.C. electric motors,magnetic contactor.Installation AHU,ACU,FCU,colling tower
 Project Management; Demand Forecasting; Simulation & Analysis Packages/Models
I am a professional Mechanical Engineer with 20 years Gulf experience with MEP services in building construction..
PROFILE:A Piping/mechanical superintendent with 13 years experience in the petrochemical & construction industries in Middle East. Proven leadership skills involving managing, developing and motivating teams to achieve their objectives. First-class analytical, design and problem solving skills. Good
Welding Technologies, Technical assistance, Workshop, site, AutoCAD, Tekla Structures, XSteel, SolidWorks, MS Project
Looking for a long term contract or permanent challenging position worldwide, utilizing broad - based experience in projects maintenance– Maintenance manager, Supervisor, Team leader – Air Traffic Control, Industrial projects, Telecommunications.
Senior Hydrogeologist
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
Mechanical engineer with design and project engineering experience. Proficient Designer with over 10,000 hours total CAD experience including Autocad 2002, and some Microstation. Extensive experience in mechanical systems design, product design, as-builts, and fieldwork.
Qualified & Experienced Design Engineer Looking for New Challenge.
Electrical/electronic engineer. Autocad design engineer.
More than 25 years experience in the Project and Detailed Designs and Management of Water & Wastewater Treatment Systems, Pumping Stations and Sewerage Reticulation Systems
A Chartered member of Institution of Engineers (India), Project Management credential holder from PMI, USA and Post Graduate in Civil Engineering with specialization in Soil Mechanics and Foundation Engineering with over 21 years of professional experience in infrastructure projects including constr
Throughout my Professional Career and experiences being a GC, one of my duties was Estimating, which I did learned and had to do from ground Up, on most of the Projects I did Participated in, from simple Electrical Ductworks up to Special Warehouses at Industrial Division.
First   1   2   3   [ 4 ]   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Construction;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com