CONTACT INFORMATION:
View contact information...
EDUCATIONAL BACKGROUND
Mechanical Engg: Passed From Technical Examination Board,
(Diploma) Gujarat, in 1982 with First Class With
Distinction Marks.
Computer: I have working knowledge of computer & also of well conversant with MS Office, Word Star, Lotus, Internet, AutoCAD.
LANGUAGES KNOWN: English, Hindi, Gujarati.
My MAJOR STRENGTH in
1.0 Plant Maintenance & Operation.
- More than 10 years Experience in Maintenance, Operation & Troubleshooting in Ammonia & Freon Refrigeration System including High speed Reciprocating Refrigeration Compressor, Shell & Tube Condensers, Chillers, Cooing Coils, (-)30deg.C. Coldstorages, (-)40 deg.C. Blast Freezers, Cooling Towers, (-) 35 deg. C. Brine Tanks, Chilled water tank, Centrifugal Pumps etc.
- More than 10 years Experience in Maintenance, Operation & Troubleshooting in Utility Equipment including BOILER, AIR COMPRESSOR, Water Treatment Plant, Waste Water Treatment Plant, Water Pumps, Air Blowers D.G.Sets, Transformer, Electric Panels etc.
- More than 10 years Experience in Maintenance, Operation & Troubleshooting in Process Equipment including Jacketed Pressure Vessel, Automatic Pneumatic/ Hydraulic / PLC operated Packaging Machines, Conveyors, Goods Lift, Gear Boxes, Agitators, Electric Motors, High Pressure Homogenizers, Trolleys etc.
2.0 Project Planning & Execution.
More than 6 years I have worked with Project & Engineering Consultant M/s SYNERGY AGRO-TECH PVT. LTD. for Dairy, Ice-cream & Refrigeration Industries. I have Executed more than 8 Nos. Project which has included starting from Civil, Mechanical, Electrical, Plant Layout, P & I Diagrams, Tendering, Site supervision, Co-ordination with Client & Contractors etc.
3.0 ISO documentation & Audit.
4.0 Energy Audit.
5.0 COMPUTER LITERACY:
I have wide Experience working in MS Office, Word star, Lotus, AutoCAD etc.
My ACHIVEMENTS
1.0 Made Effective safety System & Achieved No Ammonia Leakage in Calendar years since last 5 years.
2.0 Prepared Documents for ISO Certification & actively done internal & External Audit.
3.0 Made Energy monitoring computerized System & Saved Electricity Approx. 10 lacs in calendar year by taking corrective actions.
4.0 Maintain good IR & made healthy relation between Management & workers.
5.0 Achieved 35 % Growth in Production by Effective Maintenance System.
6.0 Achieved 18 % Reduction in Repair & Maintenance Expenses by Effective Maintenance System.
PROFESSIONAL EXPOSURE
1.0 From December 1998 To Continue
Organization: HAVMOR ICE-CREAM COMPANY, Ahmedabad
(An ISO: 9001-2000 certified Company)
Designation: MANAGER (ENGG).
Job responsibility:
a) Maintanance Of Process & Utility Equipment:
Planing Of Preductive, Preventive, Breakdown & Shutdown Maintenance Of Process Equipments:
Planing Of Preductive, Preventive, Breakdown & Shutdown Maintenance Of Utility Equipment:
Planing OF Spares require for Predictive, Preventive,
Breakdown & Shutdown Maintenance Of Utility Equipments.
(b) Implementation of New Technique, Invention which will help in Reduction of
Maintenance Cost, Increase Efficiency of Equipments & saving in Energy.
(c) Controlling Wastage Of Electrical Energy & Fuel For Boiler.
(D) Project Planning & Expansion Work In Exsisting Plant.
2.0 From October 1992 TO November 1998
Organization: SYNERGY AGRO - TECH Pvt. LTD. Ahmedabad.
Designation: Manager (Project & Development).
Job responsibility:
(a) Project Planning & Execution For Ice-Cream / Dairy/
Cold Storage including civil, Mechanical, Electrical Drawings, P & I
Diagrams, Layouts, Electrical Drawings, Bar charts, Tendering, Site coordination &
Execution.
(b) Providing Consultancy Services For Trouble Shooting in Design, Operation & Maintenace for Dairy, Ice cream & Food processing Plants, particularly in COLDSTORAGES 30 deg. C, BRINE TANKS (-) 40 Deg. C. using Ammonia Refrigeration system & also for Production.
(c) Production Of Equipments For Turnkey Projects.
We had taken Turnkey Projects for designing, Manufacturing, Erection & commissioning of Candy Tanks, Candy Drier, Ice Cream Hardening Tunnels, Mix Section (Skid Mounted ), Conti. Freezers, Fruit Feeder, Ripple Feeder, Homoginizer etc.
3.0 From October, 1991 TO October 1992.
Organization: VADILAL ICE CREAM COMPANY, Ahmedabad.
(Div. Of VADILAL INDUSTRIES LIMITED )
Designation: Assistant Manager (Engg).
Job responsibility:
a) Maintanance Of Process & Utility Equipment:
Planning Of Preductive, Preventive, Breakdown & Shutdown Maintenance of Process & Utility Equipments.
Planing Of Spares Require for OF Utility & Process Equipments.
(b) Implementation of New Technique, Invention which will help in Reduction of
Maintenance Cost, Increase Efficiency of Equipments & saving in Energy.
(c) Controlling wastage of Electrical ENERGY & FUEL for BOILER.
(d) Project Planning & Expansion Work In Exsisting Plant.
Project Activity related to Expansion of Coldstorages (-) 30 deg.C
& Hardening Tunnel having (-) 40 deg.C.etc.
4.0 From March �� TO October ��
Organisation: TORRENT PHARMACEUTICALS LTD. CHHATRAL (GUJ).
Designation: Senior Officer (Engg).
Job responsibility:
(a) Project Planning & Execution Of Insulin (Parntral) Plant
Including civil, Mechanical, Electrical Drawings, P & I Diagrams, Layouts,
Electrical Drawings, Bar charts, Tendering, Site coordination & Execution.
(b) Maintanance Of Process & Utility Equipment
Planning of Predictive, Preventive, Breakdown & Shutdown
Maintenance of Process & Utility Equipments.
PLANING of Spares Require for Utility & Process Equipments.
(c) Implementation of New Technique, Invention which will help in Reduction of
Maintenance Cost, Increase Efficiency of Equipments & saving in Energy.
(d) Controlling wastage of Electrical Energy & Fuel For Boiler.
5.0 From March, 1987 to February 1990.
Organization: VADILAL ICE CREAM COMPANY,
(Vadilal Industries Ltd) Ahmedabad.
Designation: Development Engineer.
Job responsibility:
(a) Development Of Ice Cream Manufacturing Machinery & Spares For Imported Machines.
(b) Maintenance Of Process & Utility Equipment:
Planning Of Preductive, Preventive, Breakdown & Shutdown Maintenance of Process & Utility Equipments.
PLANING OF Spares Require for OF Utility & Process Equipments.
(c) Implementation of New Technique, Invention which will help in Reduction of
Maintenance Cost, Increase Efficiency of Equipments & saving in Energy.
(d) Controlling wastage of Electrical Energy & Fuel For Boiler.
(e) PROJECT ACTIVITY related to Expansion of Coldstorages ( -) 30 deg.C &, Hardening Tunnel having (-) 40 deg.C.etc.
6.0 From August 1985 To February 1987.
Organization: SAYAJI IRON & ENGG. CO. PVT. LTD. Baroda.
Designation: Junior Engineer (Assembly Dept ).
Job responsibility:
Supervision of Assembly & Testing of Special Equipment for Mining Equipments.
7.0 From August 1982 To August 1985.
Organization: SLM MANEKLAL INDUSTRIES LTD. Ahmedabad.
Designation: Foremen (Assembly Dept).
Job responsibility:
Supervision of Assembly & Testing of Air Compressors,
Blowers, Vacuum Pumps etc.
References:
Available upon request
- Notice Period for Joining: 30 to 60 days.
- Reason for Leaving: For Better Prospect.
- Expacted Salary: It will be negotiated at the time of Interview.
View contact information... |