PROFILE
Organized, detail–oriented and excellent trouble shooter
Developed Operating Security Limits (OSL) for the Ontario Bulk Electricity System (BES)
Provided market/security limits to the System Control Center (SCC) on a 24x7 hours basis
Provided security limits for the present and the future outage schedule to the Outage Integration Office.
Analyzed short and long term outage schedule and identify security concerns.
EXPERIENCE AND ACCOMPLISHMENTS
Nov 2002 - present: Self employed as PTI/PSS/E consultant and new generator connection assessment consultant.
Using PTI/PSSE Transient and Linear Analysis Programs I have calculated EIGENVALUES of a group of generators. The eigenvalue results will be used to design and tune the respective power system stabilizers (PSS). Recently completed various connection reliability and connection assessment studies for the IMO/IESO.
1980-2002 Independent Electricity Market Operator (IMO), Ontario
Using PTI/PSSE Load Flow and Transient Study programs and based on the existing guidelines (PPG), which include voltage, transient, relay margin, thermal, load (mw, mx) etc criteria calculated OSL for the following Ontario system interfaces:
- East-West Transfer West vs. Ontario-Manitoba Transfer East
- Ontario-Manitoba Interconnection Flows.
- Sudbury Flow West
- Sudbury Flow West (Local)
- Kenora Local Area Inflow
- Lakehead 230/115 kV Transfer
- Transfer West of Mackenzie
- Transfer East of Mackenzie
* Provided short term planning studies to the Planning and Technical Depts.
* Prepared test procedures for new generating station.
* Retrieved and analyzed power system disturbance data.
* Designed coded and tested large loadflow data conversion program
ADDITIONAL EXPERIENCE
1974-1980 Ontario Hydro
In the IT area designed, coded and tested real time Power System Data Logging and Reporting (PSDLR) functions:
- MW Accumulator Function
- Hearn Gas Consumption Function
- Beck Forebay Water Levels Function
- System Flow Sheets Function
- Hourly Production Data, Daily Energy and Peak Function
- Unit Setup and Unit Limitation Function
- Morning Report Function
Supervised staff, prepared software related documentations and PERT
charts, maintained software etc.
EDUCATION/ PROFESSIONAL DEVELOPMENT
M. Sc. Electrical Engineering (Diplom Ingenieur)
Technical University, Munich, Germany
Professional Engineer, Ontario
References: Available on request. Status: Canadian Citizen and as per the NAFTA agreement I need a simple TN-1 visa to work in the USA.
Below is the IESO web site for the new generation connection planning study prepared by me for the engineering and consulting company Kestrel Power Engineering Ltd. This study has been approved and published by the IESO (Ontario). To see my report, please refer to the APPENDIX 1.
http://www.ieso.ca/imoweb/pubs/caa/caa_SIAReport_2004-128.pdf
Note: I am providing below the details of my extensive Outage Coordination, Integration and Management experience:
Here in Ontario we apply an Outage Coordination procedure called the WINTOP, i.e.: Weekly Integrated Transmission Outage Plan. This plan has several levels:
Level I: The real time BES (Bulk Electricity System) operations including the forced outages. In case of forced outage, immediate emergency operating limits are provided by the outage coordination to the system control operators and after performing studies these limits are updated.
- Level II: One week or 7 days period, starting every Friday. In this time slot, using all the approved outages the BES 'operating window', FERC:889:TTC/ATC, is calculated. No outages are accepted from the field in this period. Using
- PTI/PSSE transient, voltage and thermal studies are performed
- Using the market rules, the BES demand and the resources are also established.
- Level III: Five weeks period. In this period all the BES security related outages are identified and resolved. Outages from the field may be accepted. BES operating window is calculated and updated as required. Majority of the outages are processed, finalized and approved in this period.
- Level IV: Six week to two years period; Major Power System component changes such as
- HV transformer replacements, which may require extended outages, are processed and approved. In case of extended outages (> 6 weeks) the ABB EMS software may need modification because some extended outages (i.e. Critical Elements) may degrade the definition of the normal system and n-1 system. This period also covers small system upgrades and short term system planning items such as adding reactors and/or capacitor banks etc.
The above WINTOP plan is also a part of the IMO/IESO Market Rules, FERC:888/889. The whole WINTOP process is fully computerized and there are about ten participants located in the various geographic location of the BES who use this process. All these participants, (i.e. field/regional office and construction staff, generating stations, weather office, control room, outage coordination, MISO, NYISO, studies section etc.) must follow their fixed time to enter and update the WINTOP file. Generally the WINTOP process, regular face to face meetings are not required. However, there are the weekly meetings, next to the control room, to finalize the available transmission (FERC:TTC/ATC), the load forecast, the required resources (i.e.: IESO generations(MW & MX) plus imports from NYISO, MISO etc.) and the market prices for the next 48 hours of the market. For the IESO's 48 hours real time demand and the market operation please see:
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 401 to 450 of 2819)
Go to Search Parameters...
Brief Description
12 years experience in controls design and project management of complex automated systems.
PERSONAL EXPERIENCE(9 YEARS )
I would like to apply for a senior /executive position of highway /infrastructure projects
i am working as a TPI inspector in welding,piping,tankages,structural,vessels ect. and my basic qualification is DME and additional qualifications are AWS CWI, ASNT Level II in RT,UT,MP and DPT
As a Principal Process Engineer, supervised and executed over 20 basic engineering designs (grassroots and revamps) of ethylbenzene and styrene monomer units. Participated in 6 startups, 5 of which overseas. Also supervised or participated in numerous technical proposals and feasibility studies.
I have vast experience in site works and have a good knowledge of soil and rock anchors, drilling and grouting works, cast in place concrete piles, vibropiles, drilling drainage holes and weep holes, thin-wall works, slurry-trench, dewatering, sheet piles, deep excavation, pipeline construction.
I am presently working as a procurement coordinator since may 2002. projects include OLG PROJECT in oman and Pearl GTL Project in qatar. Prior to that, i was a quantity surveyor from august 1996 to april 2002
A. CIVIL STATUS DATAS
CNC PROGRAMMER WITH CARVING DESIGNER USING DELCAM SOFTWARE
Engineer for Power System Analysis, SCADA/EMS chief engineer
Civil surveying engineer can work as cheif surveyor & site manager
Civil/cad engineer, structural steel detailer
EXPERIENCED METASWITCH tECH. wORKED WITH 3510 AND 2510'S CALL AGENTS, EMS SERVERS, WEB SERVERS AND OTHER UC9000 TYPE VOICE MAIL SYSTEMS.
Design and construction in bridge and road
Having 14 years of Drafting work experience in Steel structures, Civil, Architectural and Mechanical layouts, Worked as a Engineer cum Draughtsman in Industrial and Residential Construction Projects In various Platforms like high raised buildings, Factory plants, Emergency shelters, Pumping Stations
Experienced in drafting commercial buildings, residential for permit processing and for shop drawing.
I am a mechanical engineer with 10 years experience in Material handling, Steel structurals, PEB, Steel buildings industries
Occupational Health And Safety Professional, Post Graduate Cert. In OHS&E Management
Civil Design and Engineering specialist Highways, including design standards, Geometric design, Horizontal & Vertical alignments, Detailed Estimations, Bid Evaluation, Design Drawings, Coordination with client, Preparation of PDR and Feasibility Reports, Pavement Design, Traffic Surveys, Data Analys
Diploma Mechanical engineering Pipe fabrication, erection Supervison manpower
Senior manager maintenance of Drilling water well & Mining drills and Screw compressors, man power Management, Guiding and training the service engineers, maintaining records and monitor the performance
Willing and able to perform ones job with less supervision
Senior Chemical Integrity Engineer
B. Tech (Electrical) with more than 15 years experience in project management, design, engineering, installation and commissioning of electrical & control system in combined cycle power plants and substations
A highly accomplished gas turbine field engineer and power generation equipment service director. Experienced in turbo-electric machinery installation and maintenance, asset and contract management, profit and loss finance, electro-mechanical troubleshooting, quality control, and staff management.
Enclosed please find my detailed resume for Structural Engineer job openings you may have. As my resume will attest, I appear to have excellent qualifications for this position
Mechanical engineer (naval welding) with 15 years experience seeking a job as supervisor(superintendent engineer).
Over 7 years experience of mechanical works in offshore and onshore in various project such as oil and gas plant / LNG gas plant / cement plant (industrial and commercial facilities).
Well experienced Project Architect / Coordinator /Auto Cad Designer / Quantity Surveyor
Experiences on civil construction works and i hope it'd be tasteful and challenging.
Feasibility studies, Process Design & Consultation, process Development , Project Management, Electro-mechanical installation, Pre-Commissioning & Commissioning, Start – up & Operation of Industrial Projects
Expericiend All around AutoCad Tech
Installation , testing, commissioning , trouble shoot and maintenance of HT, LT control panels, substation 33KV, Transformers 4MvA, weigh feeders, PLC, Ladderlogic, Level switches, VVVF drives,bag filling weighing systems, HT , LT motors,relay logic panels etc
Project Management and Engineering Experience in Oil-Gas-Refining, commercial and other industrial sectors.
A result oriented professional with 18 years of international exposure in the field of Projects / Construction division . Fire detection , alarm
I'm A Civil Engineer graduate with 14 years experience in the Gulf country seeking for new job.
Supervising the Production staff to make sure of high productivity and efficiency.
I am a qualified mechanical Engineer specialized in Acoustics
Testing,repairing and troubleshooting electronics down to component level.
Planning & Scheduling, Construction
OBJECTIVE: A Management/Field Position in Civil Engineering or Construction Management.
Transmission Planning Engineer, BES Operations Engineer, PTI/PSSE Consultant
Electrical Engineer with 12 years experience mainly with GE USA in the field of industrial project in steel, power and coal sector
Qualification Bachelor Degree in Civil Engineering Total Professional Experience 14 Years and 2 Months –Include 4 years and 9 months in Singapore & 2 yrs. in Malaysia.
Electrical Engnineer with experience in system design and maintenance planning of electrical facilities including motors, motor starters, switchgears, power distribution, and cabling.
Proactive and versatile drafting professional with a solid reputation for generating long-term results in a short-term world. Effective problem-solver who interfaces well with management, co-workers and clients. Able to meet aggressive deadlines, juggle multiple priorities independently or in a team
Execute all structural works, finishing works. Aware of survey works. Using computer software proffessionally
Experienced Cad Manager/Project Coordinator. Multi Discipline Design. Proficient with 3d modelling using Autocad, ADT33, Autoplant, CadDuct and MultiSteel. Also experienced in using Microstation, PDMS, Prime Medusa and ProCadam. Engineering background - Structural/Civil.
a. 10 years in Qty. Survey and Cost Estimates for multi-million dollar Int'l Projects. b.10 years in Electrical Power Projects for Power Plants, HV OHL Transmission Lines and Substations. c. 2 years in multi-million dollar Military a
1) GULF EXPERIENCE (21 YEARS). 5 YEARS EMPLOYED AS PROJECT ENGR IN ALMORAM CO SULTANATE OF OMAN. 2)Past 9 years from 1989 to 1998 worked as E& M Engineer at UNITED CONTRACTING Company. 3)3) 7 Years ( 1977 – 1984) worked as maintenance supervisor in ARAMCO at SAUDI ARABIA.
First
1
2
3
4
5
6
7
8
[ 9 ]
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com