Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #40650
next resume »»
CONTACT INFORMATION:
View contact information...
Nationality: Filipino
Date of Birth: May 21, 1962
Education and Examination
Bachelor of Science in Civil Engineering – 1986
University of San Jose-Recoletos
Cebu City, Philippines
Civil Engineering Licensure Examination – PASSED – 1986
Professionals Regulations Commission
Manila, Philippines
Summary
Nineteen (19) years experience in the construction industry including two (2) straight years in Saudi Arabia with an outstanding performance. Exposed to various fields (Construction of Roads & Bridges, Hotel, Residential, Commercial and Industrial buildings including Oil & Gas Industry) in Civil Engineering practice.
Objective
To acquire and develop more skills and techniques not only for an effective tool in good management but for life itself.
Key Skills and Experience
One a half (1 ½) years experience as a Quantity Surveyor Manager
Five (5) years as a Construction Manager
Six (6) years experience as an Assistant Construction Manager
More than ten (10) years as a Quantity Surveyor/Estimator
Strong track record for a strong leader of fifteen (15) site engineering staff together with more than two (2) thousand direct workers of various trades and ten (10) or more subcontractors in various disciplines and experty.
Experienced in management for a design and build projects from establishment through completion and hand-over. Including the preconstruction estimates.
Experienced in estimating and scheduling with a sound management techniques
Experienced in infrastructure projects.
Effective in time management and organization skills.
A team player with a great sense of humor.
Can effectively communicate to a diverse range of people (at times in different nationalities / languages)
Fluency (written and spoken) in English
KNOWLEDGE OF COMPUTER SOFTWARE: Microsoft Word, Project, Excel; Fast Track; Auto CADD; ACDC. PRIMAVERA- (basic only)
Employment
Shimizu Philippine Contractors, Inc.
(A Japanese Tokyo based multi-national construction company in the Philippines.)
January 2003 - Present - Acting Quantity Surveyor Manager.
Responsible for all QS works for the company.
Reports Directly to the President
Significantly surpassed the yearly required project acquisition targets.
Conducts estimation starting form the project's concept design up to its implementation and budgeting.
Liaise between the client and the company for scouting projects. Acts as the secretary during meetings.
Suggests/advices plans, ideas, appropriate (economical within qualified quality) materials and schemes to the president to arrive to a sound and economical project costs during the design development of the project.
January 2000 to Present - Assistant Construction Manager:
ROLES AND RESPONSIBILITIES:
Responsible for all the management of all activities, starting from earthworks up to the last finishing touches, from preconstruction to post construction.
Manage and monitors all multi-disciplined staffs, personnel and subcontractors on a day to day basis for all site construction instruction and requirements.
Issue or advice management and staffs for the required resources for an efficient execution of all works including to its technicalities, specifications, etc.
Resource person or Provide technical knowledge and know how regarding labor productivity, utilizing appropriate equipment, movement/scheduling of materials in relation with work items for a sound estimation, negative and positive work orders, variation of works and the likes.
Issue and provides regular (weekly and monthly) project reports/status /updates for the project manager, project manager and for the client and to all relevant interface.
Liaise with the customer on all project and technical issues.
Manage to ensure that all projects deliverables are ordered and delivered according to schedule and in accordance with the customers order specification.
Ensure the smooth progress and completion of the project within cost, time and quality and also meeting all necessary safety codes and standards.
Manage Site Engineers and site personnel; QS involved with ordering/receiving of materials; managing/supervising sub-contractors; checking/monitoring work in progress/accomplishments, timesheets of direct and cost plus workers, creating and implementing short/long term construction programs.
Carry out project management tasks and make decision related to project implementation.
Acts as the Safety Manager for the project. Ensure that every safety rule is being implemented seriously.
Issue and sign work orders, instructions, non conformance to all related works of the project.
Reports directly and closely works with the Construction Manager. Specially on matters of project design implementation / difficiencies and budget costs.
Close coordination with the Project Design Team for its proper and smooth implementation.
Ensure that all works are delivered according to the approved drawings, plans and specifications set forth for this project.
Acts as the QA/QC (USING ISO STANDARDS) Manager. Establish, improve and maintain company's QA/QC programme. Ensure that everything planned in the QA/QC programme is strictly implemented in the actual practice at site (includes road works – asphalt and concrete).
Supervises inspection staff, including determining workloads and schedules, developing, interpreting and implementing policies and procedures, training and evaluating staff and making hiring, promotion and termination recommendations.
Reviews complex plans and specifications; inspects new and existing structures to ensure compliance with codes, ordinances, laws and regulations; prepares inspection reports; coordinates assigned activities with those of other departments, contractors and utilities; conducts pre-construction meetings; monitors construction sites for compliance and writes warning notices, stop work orders and correction notices and administers fines for violations; instructs inspection staff in construction methods and interpretation of codes and ordinances.
Responds to questions and complaints regarding codes and regulations, inspection schedules, inspection results and code compliance requirements; answers questions and provides information related to projects, including resolving problems and providing technical expertise to staff, the public, contractors and professionals.
Analyzes workload and prepares estimates for annual inspection staffing and encroachment permit revenues; monitors and tracks expenditures for temporary inspection staffing and orders equipment and supplies.
Manage the Safety Manager for the project. Ensure that every safety rule is being implemented seriously.
Works 15 hrs a day; 6 days a week. Momentarily monitors site on Sundays on important matters. Spends 75% time to field works.
June 2000 - January 2003 - Assistant Construction Manager
Construction of New LSI Building Project
ROHM ELECTRONICS PIHILIPPINES, INC.
Three (3) Storey MICROCHIPS FACTORY BUILDING
WITH CLEAN ROOM:
Class 100,000; Total room area = 13,500m2
Class 10,000 ; Total room area = 3790m2
Managed fifteen (15) site engineering staff and five (5) office staffs together with over two (2) thousand direct skilled and unskilled workers for the construction of a 27,000 m2 microchips factory building.
Close coordination with various subcontractors.
Reports directly to the Project Manager
Managed this project from establishment through completion and hand-over.
January 2000 - April 2000 - Assistant Construction Manager
Construction of Toshiba Philippines, Inc. Factory Project
(Two Storey MICROCHIPS FACTORY BUILDING)
WITH CLEAN ROOM:
Class 100,000; Total room area = 1,800 m2
Managed the Architectural works only together with over one (1) thousand direct skilled and unskilled workers for the construction of an 18,000 m2 microchips factory building.
Acts as the Safety Manager for the project. Ensure that every safety rule is being implemented seriously.
Close coordination with various subcontractors.
Reports directly to the Project Manager
October 1998-o October 1999 - Assistant Construction Manager
Construction of Terumo Philippines, Corporation Factory Project
MEDICAL EQUIPMENT FACTORY
WITH CLEAN ROOM:
Class 100,000;
Total room area ; Phase 1 = 5,200 m2
Phase 2 = 7,776 m2
In-charge of the structural concrete works, earth works, road works and drainage works.
Monitors daily accomplishment, quality of works and safety at site and reports directly to the Construction manager.
Prepares construction and materials procurement schedule.
Close coordination with various subcontractors.
Reports directly to the Construction Manager
January 1998 to August 1998 - Senior Project Engineer
Takata Philippines, Inc. Factory Project
(Car Accessories Two (2) Storey Factory Building)
In charge for all exterior works; exterior finishing, road works, drainage and landscaping works.
Direct Supervision to all direct skilled and unskilled workers together with some subcontractors.
Reports directly to the Assistant Construction Manager
June 1996 to November 1997 - Senior Site Engineer
Construction of Marriott Hotel Project
(12 Storey Hotel Building) 5 STAR HOTEL
Head of the rebar & formworks group.
Over-all supervisor for the tower and low rise areas.
Directly supervises more than 400 tradesmen.
Monitor accomplishments and project schedules.
Directly communicates and reports to the assistant Construction
Manager.
QA/QC Supervisor for structural works and (asphalt/concrete) road construction
Metaphil, Inc
Local General Contractor
Based in the southern Philippines
September 1995 to May 1996 - Quantity Surveyor
Major Projects undertaken were Roads and Bridges. Most of the projects assigned to me were government roads and bridges projects (by package) funded by foreign banks and international institutions.
Steel Fabrications and Installation Works
Prepares all submission documents.
Hadi Al Hammam Trading & Contracting Est., Inc.
A medium local Contracting Company in Saudi Arabia
May 1993 to May 1995 - Chartered Planning Engineer for SAUDI ARAMCO Projects in
Riyadh BROWN FIELD WORKS
Lead Engineer (Construction Manager) for the rehabilitation of all
Riyadh Refinery Buildings. This is an On-Shore project handled by Mr.
Frank Stolz. All works (Architectural, Mechanical, Electrical, Electro-
mechanical & Civil) must conform with SAUDI ARAMCO Standards.
Manage all multi-disciplined staffs, personnel and subcontractors on a day to day basis for all site construction instruction and requirements
Reporting, planning including the design for the repair, modification and construction of various buildings and facilities in Riyadh Refinery area.
Responsible for all the management of all activities, starting from earthworks up to the last finishing touches, from preconstruction to post construction.
Invite prospective contractors for open bidding
Issue/award work orders and contracts to sub contractors.
Issue and provides regular (weekly and monthly) project reports/status /updates for the project director.
Ensure the smooth progress and completion of the project in within cost, time and quality standard set forth for the particular project.
Carry out project management tasks and make decision related to project implementation.
Acts as the Safety Manager for the project. Ensure that every safety rule is being implemented seriously. All safety standards must conform to SAUDI ARAMCO Safety Standards.
Important signatory on all materials going in and out of the project. Monitors its costs. Including also to all timesheet from all personnel and staffs.
Issue and sign work orders, instructions, non conformance to all related works of the project.
Ensure that all works are delivered according to the approved drawings, plans and specifications in accordance with SAUDI ARAMCO standards.
Issue and approve material orders required for the project through SAUDI ARAMCO networking system.
Quantity Surveyor
Worked as a QA/QC. CERTIFIED QA/QC OFFICER BY THE SAUDI ARAMCO (ISO STANDARDS and ARAMCO STANDARDS ) – JUNE 1993
Supervises inspection staff, including determining workloads and schedules, developing, interpreting and implementing policies and procedures, training and evaluating staff and making hiring, promotion and termination recommendations.
Reviews complex plans and specifications; inspects new and existing structures to ensure compliance with codes, ordinances, laws and regulations; prepares inspection reports; coordinates assigned activities with those of other departments, contractors and utilities; conducts pre-construction meetings; monitors construction sites for compliance and writes warning notices, stop work orders and correction notices and administers fines for violations; instructs inspection staff in construction methods and interpretation of codes and ordinances.
Responds to questions and complaints regarding codes and regulations, inspection schedules, inspection results and code compliance requirements; answers questions and provides information related to projects, including resolving problems and providing technical expertise to staff, the public, contractors and professionals.
Analyzes workload and prepares estimates for annual inspection staffing and encroachment permit revenues; monitors and tracks expenditures for temporary inspection staffing and orders equipment and supplies.
Also worked as a Safety Officer. CERTIFIED SAFETY OFFICER BY THE SAUDI ARAMCO – JUNE 1993
Handled the 3.4 million US dollar building modification project in the
Riyadh Refinery and Distribution areas. Acted as the Lead Technical
Personnel for a group of six (6) Engineers with Four (4) different nationalities / languages.
Handled Projects in the BERRI GAS Plant Area. This is a project for additional steel supports and welding works project inside the existing
BERRI GAS Plant. BROWNFIELD WORKS.
Handled the Water Proofing Works in the KHURASANIYAH Switch
Gear Project. BROWNFIELD WORKS
Handled the Pilot Separator Skid Project in SAFANIYAH Refinery
Area. GREEN FIELD WORKS (GOSP's)
Department of Public Works and Highways
PLANNING AND DESIGN DIVISION
A local government agency in the Philippines
Concerning infrastructure projects
Major scope works are Roads, Bridges, Public Buildings & structures, and Drainage Projects.
May 1990 to May 1993 - Engineer II (Construction Manager – QA/QC Inspector)
Manage and supervises each assigned project from the regional office.
Mostly Bridges and Highways projects under the regional office no. 7.
Monitor and Cost Controller for each project handled.
Monitor Subcontractors of each projects.
Evaluation of structural design and computations for all infrastructures projects under the jurisdiction of the regional office, submitted by local contractors and district offices.
Evaluation and preparation of program of works for projects under its jurisdiction. Evaluation of accomplishment reports, submitted by local contractors and district offices.
QA/QC Inspector for the strict implementation of the approved plans and specifications (using the blue book) for all projects under the regional office. Perform ocular structural inspections on all government projects under the regional office. The region comprises 6 major islands and other smaller ones. Advice subcontractors for all QA/QC control points and requirements. QA/QC approving official prior to proceeding to any item of works.
Drafts, designs (structural), estimates highways (including provincial/city roads) and bridges."
Prepares program of works for every project handled.
Projects Handled:
Special Project Handled: Rehabilitation of Mandaue-Mactan Bridge – a
900 meter length, 25 meters high bridge with around 4 km approach (total for both sides). This bridge was rammed by an international ocean liner (oil tanker) during a very strong typhoon. Damaging the vital structural steel supports.
Works involved:
1. Rehabilitation of the structural steel supports
2. Rehabilitation of two piers
3. Rehabilitation of the damaged concrete deck.
4. 4 Km Asphalt overlay (over the bridge and approaches)
All other projects under the Regional Office no. 7
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1501 to 1550 of 3124)
Go to Search Parameters...
Brief Description
5 yrs experience in crushing & asphalt operation,maintenance,motor control centre,inventory control,switchgear.
2D and 3D cad applications - upstream and downstream experience
12 Years experience in civil engineering, design, procurement, construction & supervising of particular relevance to the project are as follows :
10 Year Experience, 5 years Implementing SAP FI/CO and BW / BI / Netweaver Solutions for Banking, Manufacturing, Sea port industry, Maintaining SAP BW Solution for Oil and Gas Industry
Quality control, Inspection, Installation/erection of pipes and piping components, HVAc, HSE, Computer literate
I am a geologist with multidisciplinary experience, including experience in geotechnical engineering, mining, exploration, tunneling, groundwater, drilling, environmental and construction monitoring. I am a licensed monitor well driller in Nevada and OSHA Hazwoper, MSHA, SWPPP and nuclear gauge cert
DCS and instruments el.engineer.International experience.Experience in Chemical,mainly in Pulp and Paper (equipment-similar to used in Oil&Gas,Cement,Fertilizers,etc)Industry
Mechanical Engineer with expereince in AutoCAD 2000, Piping, Welding, Installation and Erection Works, Production Plainning, Supervision
Graduate Mining Engineer with MBA & First Class Mine Manager's Certificate having 22+ yrs. Hard Rock Large Highly mechanised hands on experience in Mine Operation, Drilling & Blasting, Mine Planning, Contracts Management, Waste Dump & Haul Road, Mine Dewatering
Junior project manager
Land surveying relating to boundaries, design, construction, and mapping.
12 years experience in all aspects of telecommunications. Excellent written and communication skills. Highly organized. Ability to work on multiple assignments. Excellent problem solving skills. Able to meet deadlines and schedules. Start of to completion of projects to include ordering, insta
Motivated, proven performer with a 17 year record of demonstrated success in Operations Management, Project Management, Distribution/Logistics Management, and Mechanical Engineering across multiple fields from Military Operations, Municipal Management, Telecommunications, Software Development, Call
I am a BS Mechanical Engineer who had served primarily as a Senior Fire Protection-Applications and Design Engineer for around 17 years plus and 5 years as an Occupational, Health and Safety practitioner in a petrochemical industry with a primary function as Fire Safety Engineer. My specialty profe
Business planning, estimating, planning and scheduling, cost control and reporting, contract management, earned value, productivity monitoring, claims disputes and resolution, lean construction, high level presentations, multi tasking, meeting deadlines, and creating win-win situations.
20 years of experience (Eight year in Gulf) in varied discipline of Engineering i.e. Quality Control and Assurance, Inspection and Expediting, Piping Specification, Material Handling equipments & system specification, Shutdown maintenance Inspection, Construction Site Inspection(Piping,PV)
Engineer with well developed analytical and research skills. Possessing expertise in Electrical Demand Forecasting, Power Flow Analysis, Fault Analysis, Stabilities Studies and Economic Load Dispatch. An innovative, dynamic, confident and articulate individual
A graduate in biomedical engineering with over 5 years of experience in Medical equipment planning, procurement, design assisstance, primary level maintenance in Health Care/Hospitals and developing Management Information System of Biomedical Department
Mechanical Engineer, pipe stress, pressure vessel, compress, caesar
1) Graduate in Mechanical Engineering with 12 years experience in Construction Planning in the power, petrochemical, oil & gas, chemical and industrial sector 2) Proficient in Primavera, MS Project, 3) Strong project management, technical, communication and leadership skills
Ten years experience in Mechanical engineering / Project Engineering of EPCM companies.
I have eight years experience in major civil works projects such as,bridges and metro rail projects.
I am a highly experienced and skilled senior service person. I have many years experience as a expatriate including working in what are considered 'hardship' postings. I am Caterpillar dealer trained, but have recently been working in open cast mines, both coal and gold, in Africa and Asia.
Construction Project Controls Manager (PMP Pending)
Over 17 years of rich & effective experience in Instrumentation maintenance of DCS based controls & instrumentation. Core competence in installation & commissioning field instrumentation, design & logics/programming of DCS / PLC- Honeywell make & Modicon make
E&I Superintendent with a broad spectrum experience of electrical, instrument, and mechanical engineering acquired throughout a thirty year career. 27 years of my experience represents working directly for the Client within the O&G industry, on multi-discipline task force projects, including PMT.
QC, NDT, PIPING & WELDING INSPECTION, RTFI, MT, PT, PMI, FERRITE NO,H ARDNESS TESTING, PWHT, PRE HEAT, HYDO/PNEUMATIC TESTING, LINE CHECK, FABRICATION, ERECTION,C OMMISSIONING
Nineteen (19) years experience in the construction industry including two (2) straight years in Saudi Arabia with an outstanding performance. Exposed to various fields (Construction of Roads & Bridges, Hotel, Residential, Commercial and Industrial buildings including Oil & Gas Industry) in Civil En
To work at Corporate Level with Hard Work & Honesty
International Project, Construction, and Contract Management
Diploma in Quantity Surveyor
Focused well-defined skills in engineering, program/project management, industrial and commercial construction, financial systems, profit and loss, proposals and negotiations.
SDS2, Xsteel, AutoCAD Steel Detailer.
ITI in Draughtship
Create learning opportunity to work in architectural firm and deal with many graphic jobs.
Project Engineer (Instrumentation & Control)
System Administrator, Server Support, Network Administrator, Desktop Support, ADS, DHCP, CCNA, MCSE
Construction Electrical and Instrumentation Engineer
Qa/Qc Inspector
MBA and graduate Electrical Engineer with 19 years experience in EHV installations. Specialized in O&M and Project Management of mega projects like power, steel, refinery, etc.
I am a highways designer, designed more than 50 link roads, 2000 kms length all over Egypt, Yemen repuplic, & KSA.Using thelatest versions of Autodesk, Also I have a good expeience in the field of design Water & Waste Water networks
Professional Engineer experience in cleanroom design, construction, installation, testing and commissioning of cleanrooms (HVAC and architectural) for semi-conductors, pharmaceuticals and laboratories.
I describe myself as Sincere and perseverance to Hard work. I had completed my Bachelor of Civil Engineering in First Class From a reputed institution in Tamil Nadu, India.
Bridge Design / Bridge Management Sysytem
An electrical engineer, having 4 years of experience in high voltage side and have got testing and commissioning,design and maintenance experience. i am an indian and would like to get an oppertunity in reputed companies.
About 9 years+ experience in cement industry in mechanical maintenance (preventive, predective and corrective maintenance, compterised maintenance system), worked as section incharge for mills,Kiln, energy conservation, costing techniques.
Greetings, I'm available to provide survey services. I'm experienced in "base camp" situations and logistics.
Geotechnical Engineer
I have recently finished my undergraduate study in Mechanical Engineering, Institute Technology of Bandung, Indonesia. I am looking forward to having a career which has strong relation with my educational background.
Working in the Kingdom of Saudi Arabia for the last 9 1/2 years. Well experienced in the design and execution of all types of HVAC systems, plumbing systems including water supply, Sewage/drainage system and Fire fighting system.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
[ 31 ]
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com