KEY EXPERIENCE:
* Preparing plans, estimates, calling tenders, negotiating rates, Finalizing tenders, executing works, preparing bills etc.
* Designing the buildings, analyzing the structures, preparing Structural drawings, preparing bar bending schedule, Bill of Materials, checking placement of reinforcements etc.
* Constructions of heavy industrial building.
* Fabricating & Erecting Steel columns, beams, Trusses etc.,
* Designing of timber structures.
* Construction of Water bungalows.
* Construction of international bar, jetty in sea.
* Designing of Water supply, Sanitary.
* Construction of roads.
* Widening the existing road with SG Mix, WBM and laying B.T.
* Bored cast – in – situ piles.
* Construction of cost economical structures.
* Interior designing.
* Timely execution of the project.
* Planning the work, preparing bar chart
* Co-ordination with Client.
* Checking the quality of materials
* Preparing rate analysis for different works.
* Land scapping, planning gardens.
* Maintenance of sanitary & Plumbing lines.
* Regulating water supply.
* Conducting class to the B.E. students.
* Purchase of materials, negotiating rates.
* Project management.
* Liaison with client.
POSITION AND RESPONSIBILITIES
Period of work Name of the employer Name of the post Nature of work
April 1988 to Jan 1995 The Principal Regional Engg. College, Trichy – 15. Technical Assistant Construction of Institutional buildings, quarters, shopping complexes, hostel buildings etc., in this campus preparing estimates, planning & designing the buildings, analyzing the structures, finalizing tenders, preparing bills etc., to the contractor The work also includes maintenance of Buildings in this Campus (Rec-25 years old), Regulating water supply, Maintenance of sanitary & Plumping lines, Maintenance of guest house, providing road inside the campus, developing greenery in important places and giving face lift to the college. Conducting class to the B.E. students regarding quantity survey, construction management etc.,
Feb. 1995 To 29.02.96 The Chairman Cethar Food Oil Ltd., Tiruchirappalli Civil Engineer Head of the Civil wing. Organizing the Civil Work proceeding in all our 3 factories. Planning, designing and executing the civil work, the civil supervisors in my control. One new factory (extracting oil from Rice bran) constructed near Kangayem. Expansion of the existing factory in Pudukkottai and Musiri, this work includes construction of cooling tower, providing footing for steel columns, construction of Effluent treatment plant etc., Planning, designing, preparing drawings, execution, purchase of materials, quality testing, organizing, interior designing will come under my part (In execution supervisors will assist me).
31.05.96 To 16.02.01 The President Sical Civil Engineers, Chennai. Asst. Project Engineer Sical Civil Engineers is a construction company [ISO 9002] planning the work, preparing control budget, bar chart, Monitoring the activities as per schedule, preparing materials requirement chart preparing rate analysis, quality control, executing the work, Liaison with Clients etc., project in-charge for laying west coast road from Kanyakumari to Trivandarum.
19.04.01 to 4.12.01 The Managing Director, Olhuveli beach Resort, Republic of Maldives. Civil Engineer I am the Chief Engineer for the 3 major projects i.e., Water bungalows, Beach bungalows and Lagoon Restaurant done in this resort.. Planning, Preparing the BOQ, executing the work and ordering the materials.
19.02.02 to till date The Chairman, Dhonveli beach & spa, Republic of Maldives. Chief Engineer Chief Engineer for total development of this resort. Planning, designing & executing all the building, for the architect requirement. Design includes concrete and timber structures. Construction of Guest rooms to international standards, International sunset bar, Restaurant, Swimming pool, sports complex, Power house, Laundry, Main arrival jetty etc are designed and executed in this resort.
PROJECT:
¨ Construction of P.G. Chemistry Lab
Location: REC, Trichy Year: 1988 -89
¨ Construction of glass house
Salient features: This is a second glass house constructed in Tamil Nadu. Roof is covered with wired glass, over steel truss, sides Packed with rubber beading and tighten with steel angles.
Location: REC, Trichy Year: 1989 -90
¨ Construction of under ground water sump & providing water supply connections.
Capacity: 75000 Gallons
Location: REC, Trichy Year: 1993 –1994
¨ Interior Designing & Landscaping guest house.
Location: REC, Trichy Year: 1994
¨ Construction of shopping complex by adopting low cost Technique.
Salient features: Walls are constructed with hollow brickwork. Roof is laid with filler slab.
Location: REC, Trichy Year: 1992
¨ Planning, designing and construction of rice bran oil extracting plant.
Salient Features: This is a food oil extracting plant from rice bran. It is designed to produce 1400 tons of crude oil from rice bran per day. This factory consist of Main Plant, godown, E.B. Room, Chimney, Boiler, feeding yard, weigh bridge, office, Lab etc.,
Location: Kadayur – 6 Kms from Kangayam Year: 1995
In Trichy Coimbatore Main Road.
¨ Revamping and expansion of rice bran oil extracting plant.
Salient Features: To increase the production capacity, Additional cooling tower,
New toaster foundation, increasing length of main plant etc are carried out.
(1). SIPCOT - Pudukkottai Trichy Main Road Year: 1995
(2). Musiri - About 20 KMS from Trichy
In Trichy Salem Main Road Year: 1995
¨ Construction of Bungalow for chairman, Cethar Foodoil Limited
Nature of Work: Individually handled this project. Liaison with Architect, discussing with chairman, purchase of materials. Fixing Labour Contractors after negotiation, Preparing bills, making payments etc.,
Location: Raja Colony, Trichy Year: 1995 – 96
¨ Construction of Housing unit at ICL, Dalavoi
Salient Features: This is new factory constructed by India Cement Limited at a estimated cost of Rs. 300 Crores in Dalavoi.
Nature of Work: Site Engineer for Construction of 'A' block [Residence for chief of this plant ] preparing bar chart, placing purchase order, preparation of client bills, sub. Contractor bills, Finalizing sub. Contractor after negotiation, Liaison with client. Finally project in-charge for this project.
Location: About 100 Kms form Trichy Year: 1996 – 97
In Trichy – Chennai Train Route
¨ Construction of students day center, Chennai.
Nature of Work: Bored cast in – situ piles of 90cm and 60cm dia. Are caste for a
Length of 15 M.
Location: TANVUAS, Vepery, Chennai Year: 1997
¨ Civil, Mechanical and electrical works in CO1 & CO2 A packages, Neyveli.
Salient Features: Thermal plant Located at Neyveli, feeding power supply to Southern States. NLC is also supplying Lignite to major factories needing coal as a fuel. It is also producing urea.
The existing Thermal Plant I is proposed to expand by adding 2 x 210 MW units.
Nature of Work:
Co1 Package: Construction of site office, laying roads, erecting watch Tower etc.
Co2 A Package: Construction of Main Gate Complex, Canteen, Ware house etc.
Client bills should be prepared monthly for 2 packages. Bar bending schedules, Bill of Materials to be prepared and get approved by client. Quality control test to be conducted periodically and as and when required by client. Timely completion of project to avoid L.D. Structural and electrical drawings to be prepared and get approved from the consultant [M/S. Mecon].
Location: Neyveli About Year: 1997 - 99
50 Kms from Pondicherry.
¨ WEST COAST ROAD, NAGERCOIL
Salient Features: This is one of the important project is Tamil Nadu. Frequently reflecting is state Assembly. This project aided by NABARD. Government executing this project under state High ways department. By This project, it is proposed to connect coastal villages between Kanyakumari to Trivandarum.
Nature of Work: Project – In – Charge for this prestigious road – Reach I. Even though agreement period is 18 Months, this project is well ahead the schedule and this project completed in 16 months.
The existing 3.50m width road is expanded to 7.00 m width road with S.G. Mix WBM and B. T. Top.
Location: Kanyakumari to Rajakkamangalam 24 Kms. Year: 1999 – 2000
¨ CONSTRUCTION OF SEWERAGE TREATMENT PLANT AT KODUNGAIYUR, CHENNAI.
Salient Features: The capacity of sewerage treatment at North Chennai is not sufficient at Kodungaiyur. Hence it is proposed to construct two additional Aeration tank and other accessories connecting with it, by the Chennai corporation, Tamil Nadu.
Nature of Work: Construction of Two Aeration tank, Sewage channel Etc., I am the In-charge of one Aeration tank, under me one supervisor. Continuously pumping percolating water with 4 nos of 5 HP pump and work done. At this site condition, we Achieved 50 lakhs progress Within 15 days.
The Aeration tank is 60 m x 60m with RCC floor and RCC wall.
Location: From Parry's 16 KM towards North Year: 2000 – 2001
¨ CONSTRUCTION OF WATER BUNGALOWS, BEACH BUNGALOWS AND LAGOON RESTAURANT, OLHUVELI BEACH RESORT, MALDIVES.
Salient Features: Previously this resort constructed and managed by Japanese concern. By that time due to poor construction all the buildings cracked and mostly damaged. Ministry of tourism, want to demolish this building and Construct a new one to run the resort.
Nature of Work: Preparing BOQ, negotiating with the contractors, finalizing the contract, executing the construction as per the drawing.
Water Bungalows: 200m Walkway jetty, 10 nos of Arrival jetty each of length 40m. Piers and 'T' are made of concrete, remaining all the structures are made of wood. This rooms are designed as leaf.
Beach Bungalows: 14 blocks of guest rooms. Each blocks have 4 rooms. G.F. is made of masonry wall and roof concrete. First floor is totally made of wood.
Lagoon Restaurant: It consist of Bar and coffee shop. It partly in water and Partly at land. Sun deck is constructed in lagoon and remaining building portions are at land portion.
¨ CONSTRUCTION OF GUEST ROOMS, INTERNATIONAL BAR, SPORTS COMPLEX, OFFICE, RESUARANT, POWER HOUSE, LAUNDRY, ARRIVAL JETTY ETC., IN DHONVELI BEACH AND SPA, MALDIVES
Salient Features: Previously, it is 25000 sq.m land area with 24 guest rooms, it function as a small resort in Maldives. Under the development ideas, another 25000 Sq.m land reclaimed, another 50 rooms with international competition facilities are constructed, new international bar, swimming pool, sports complex etc and it is promoted as a 5 star resort in Maldives.
Nature of work: Designing the structures for the buildings as planned by our Architect. Designing the water supply and sanitary line. Negotiating with contractors, finalizing the contract, Preparing BOQ, Program schedule, Executing the work with contractors/contract company as per drawing and finalizing the bill.
Guest Rooms: Totally 50 guest rooms of different grade are constructed with internal standards and facilities. Column and floor slab will be made of concrete and roof with timber structures. Designed at different pattern to attract the guest. Design should match the elegant of the building.
Bar: This bar is made partly in sea with 500 sq.m building area and 254 sq.m deck area. Deck partly constructed in sea. Column and beam are made of concrete, roof made of timber structures. 9m span timber trusses are designed to withstand the heavy wind load and transfer this load safely to the beams and columns.
Sports complex: 1000 sq.m tennis court and badminton court are designed with concrete slab base. 10' fence around with 2" pipe at 8' c/c.
Power house: This power house are designed for 4 nos of 425 K.V.A. Total power consumption of this resort is 950 KW. This generator room made of double wall periphery ( 3" Gap between) for sound proof. 12m span tubular truss are designed for roof.
This power house is combined with water plant and store. Water plant are planned at ground floor and store for water plant and power house are planned at first floor. Tubular truss with plywood at top are designed for first floor (For storing material). Roof is designed with 12m span tubular truss are designed for roof.
Swimming pool: Max depth of this pool is 2m and it's capacity is 325000 litres. Surrounding is made of deck with 350 Sq.m. This pool is constructed near sea shore.
Restaurant, Office etc.,: This building are designed with concrete column, beam and timber roof structures. This buildings are designed to the international standard and considering the importance of the guest facilities, their requirements.
PERSONAL DETAILS:
DATE OF BIRTH: 9TH OCT. 1969
CURRENTLY WORKING ADDRESS: Civil Engineer
Dhonveli Beach and spa,
North Male Atoll,
Republic of Maldives.
NATIONALITY: Indian
MARITIAL STATUS: MARRIED
SEX: Male
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 851 to 900 of 2916)
Go to Search Parameters...
Brief Description
AutoCAD, Revit, 3D Animation
PLC programming,control design,piping,branch circuits.
Senior Instrumentation & Control Systems Engineer
International Weldig Engineer (IWE) , CSWIP 3.1 and Level II(two) Pt,Mt,Ut and RT
Erection & commissioning
mechanical engineer with 2.25 years experience in automotive field
Planning/scheduling, progress monitoring, procurement of project material, site coordination, progress reports and site co-ordination
QA/QC Engineer/Inspector
Experienced Industrial Structural Engineer - concrete, steel - 20+ years, UK & US codes
detailed engineering/design of offshore rigs and ships
Senior Autocad Draughtsman (Architecture/Structure/Civil)
Ability to manage multi projects and organize all procedures on and off sites to ensure the projects are completed on time and within the budget.
KEY RESPONSIBILITIES :1. Transmission engineering in designing backbone links,2. Transmission network design, link budgeting for transmission links,4. Planning of STM-1 Ring Network in City and Backbone to have a Reliable Network with a uptime of 99.99%,6. Microwave Projections for the additional Si
Landscape Arch with varied experience of the micro and macro level design and execution of private and govt. projects
•experience performing detailed design calculations for heat transfer systems, pressure vessels
I have done my M.S.(Control System Engineering) from Texas A&M University-Kingsville with G.P.A as 3.9 /4.0. I am looking for a job of control System Engineer. I have work experience of 1 year and 4 months. I am willing to relocate anywhere in USA. Thanks Rajesh
15 years of experience in repairs and maintenance to construction plant and machinery and 10 years at supervision/managerial level Plant predominantly Caterpillar
i am a post graduate mechanical engineer with 8-9 years of working experience in HVAC field in international environment. can lead a team of supervisors and subcontractors. knowledgeable in working. presently working with the Italian M & E contracting company (elektrint limited in Nigeria.)
Skills: Contract Negotiation, Quantity Surveying, Project Handling & Project Implementation, Quality Control, Co-ordination with various agencies involved in project
Experience in quantity surveying, site supervision, planning, designing over water and over land structures.
I am a Naval Architect and Marine Engineer whom objective is to provide engineering solution in a merit driven environment with an opportunity for career development to face present and future challenges.
Looking for a position with an established engineering company, utilizing previously learned skills
I am a Mechanical engineering diploma holder, over 15 years of experience with CSWIP Plant Inspector, CSWIP 3.2, AWS CWI and ASNT LEVEL II in RT, UT & MT, with valid UAE driving license.
EXPERIENCE PROFILE (7 YEARS)
MEP Manager with 14 years of int'l exp. in construction. Verify design, construct and commission. Executed prestigious & high rise buildings project which MEP works value in excess of US$380 M. Supervise and coordinate work acc. to contract ,budget, time, co. procedures & ensure client satisfaction.
site engineer for a land development project that covered earthworks and HE utilization, roadworks, driange, waterline and housing projects on mass housing and medium scale units
i have passed Degree(B.E.) in mechanical engineering with spl. in welding technology and now i am working as a welding engineer in boiler making company from 2 and half year. my job profile is making WPS,WPQ,PQR, TDC, and shop floor inspection.
MECHANICAL ENGINEER WITH EXPERIENCE IN DESIGNING
I have 4 years experience as a document controller with Al Ghandi & Consolidated Contractors International Company (L.L.C.) in U.A.E. and 1 year experience as an Assistant Accountant with World of Martial Arts in Pakistan.
Aspiring to achieve a good position in the hi-tech industry as a Reliability Engineer, which encourages learning, creativity that provides exposure to new ideas and that stimulates personal and professional growth.
3 years of solid experience in all formwork designs.
I am working with ABB LTD. as a project engineer, looking after the erectioon and commissoning of Electrical equipments.I have completed my graduation from KUK Univ in 2003 in Electrical.
A Wide experience in drafting in major of civil works, structural, mechanical, Piping & Instrumentation and architectural drawings, 8 years of overseas experience,Overall 15 Years of working experience in civil, structural, mechanical, piping, and architectural firms
More than 13 years post qualification experience out of which 7 years in Occupational Safety and Health, (4.5 years in oil and gas sector) interested in the development of modern techniques in the construction and oil field industry
Electrical Engineer ( project & design) with more than13 years of experience with MNC in India, Japan , Middle East for Oil and Gas, Petrochemical, Chemical, Power.
PROFILE: Proficient in shuttering works, Steel reinforcement & fabrication, pipe fittings
I am a Senior Planner/ Project Controller with certified versatile capabilities and experiences in different fields of construction, including, but not limited to, Building construction, massive civil work, industrial construction, petrochemical construction, commercial complex and high rise buildin
Having six years of experience in managing various geotechnical projects with expertise in planning and execution of geotechnical investigations for mega industrial project sites incorporating all significant aspects.
have skills and knowledge in science information technology and industrial engineering.
Mechanical Enginner with two years experience in designs for commercial, domestic and retail buildings specialising in HVAC, water supply and waste reticulation.
Engineering experience of construction projects; piping system and water resources
Erection, Calibration and Commissioning Engineer
B.E. Civil Engineer + PGDIDM, 2.7 Yrs Exp., Unitech Ltd.
Reciently graduated civil engineer looking for a position related to civil engineering, like construction, town-planning, transports, site engineering
Specliazation in 6g welder
Able to design using Prokon, Oaysys, Excel and Manual Design in both structural steelwork and Reinforced Concrete
I am a Mechanical Engg graduate, with 9 years experience in various projects, out of which 7 years at Jacobs H&G Private Ltd. (an associate of Jacobs Engineering. Inc. USA), in ISO 9001 environment.
An Engineer with business acumen, client awareness, practical skills, overseas experience and sound engineering knowledge.
Highly motivated, team-oriented individual with excellent communication skills. Two years of industry experience with Turner Construction-USA & NESPAK-Pakistan respectively. Prepared budget reports, schedules, estimates and bill of quantities and performed engineering supervision of various trades.
Geotechnical Engineer working in design, planning, technical follow, contract administration, reporting, financial studies and cost control of underground works such as DW, Piles, Grouting, Tunnelling, Dewatering.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
[ 18 ]
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Construction;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com